BBC PLATA is a 2003 public freight. The Coast Guard has recorded 27 inspections since 2016, most recently in March 2026, along with 9 deficiencies and 6 operational controls.
Records from 2016 to 2026. Most recent: inspection, 18 March 2026.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it9618 - Convention (Subpart B), Gross Ton 4260 - Convention (Subpart B), Net Ton 17972 - Displacement, Metric Ton 12837 - Dead Weight, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 2016 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Inspection history · 27
18 March 2026PSC B · Deficiency Check
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 8327855
16 March 2026Explosive Handling Operation-Commercial
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8327149
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 18 March 2026Resolved
Fire fighting systems and appliances shall be kept in good working order and readily available for immediate use. PSCO observed 02 hoses with pin hole leaks and 05 hoses leaking at the coupling.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 March 2026
Resolution: Reecieved class report attesting to repairs and replacement hoses.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 5 August 2025Resolved
Each emergency generating set arranged to be automatically started shall be equipped with starting devices approved by the administration with a stored energy capability of at least three consecutive starts. PSCO observed 01 ruptured starting battery for emergency generator starting system. Replace battery and test system to the satisfaction of classification society.
74SOLAS(AMEND)II-1/44.2
60 ac
Action required: 60 - Rectify deficiencies prior to movement
Due 5 August 2025
Resolved 5 August 2025
Resolution: Failed battery was replaced and system tested to the satisfaction of the classification society.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 5 August 2025Resolved
A valve shall be fitted to serve each fire hydrant so that any hose may be removed while the fire pumps are in operation. PSCO observed aft deck fire station valve leaking by while emergency fire pump was in operation replace valve to the satisfaction of the certificate issuing authority. 74SOLAS(AMEND)II-2/10.2.1.4.2
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2025
Resolved 5 August 2025
Resolution: Faulty valve was replaced and system tested to the satisfaction of the classification society.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 19 September 2021Resolved
WHERE DAVIT ARMS ARE RECOVEREDBY POWER, SAFETY DEVICES SHALL BE FITTED WHICH WILL AUTOMATICALLY CUT OFF POWER BEFORE THE DAVIT ARMS REACHTHE STOPS IN ORDER TO PREVENT OVERSTRESSING THE FALLS OR DAVITS. PSCO OBSERVED LIMIT SWITCH FOR RESCUE BOAT DAVIT NOT OPERATIONAL. CREW FIXED AND TESTED PRIOR TO [name withheld].
Action required: 10 - Deficiency Rectified
Due 19 September 2021
Resolved 19 September 2021
Resolution: CREW REPLACED LIMIT SWITCH PRIOR TO [name withheld]
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 19 September 2021Resolved
AFTER ANY SURVEY OF THE SHIP UNDER RESOLUTIONS 7, 8, 9, OR 10 HAS BEEN COMPLETED, NO CHANGE SHALL BE MADE IN THE STRUCTURAL ARRANGMENTS, MACHINERY, EQUIPMENT, AND OTHER ITEMS COVERED BY THE SURVEY, WITHOUT THE SANCTION OF THE ADMINISTRATION. VESSEL'S CCTV WIRING TO FORWARD CAMERA PENETRATED BULKHEAD OF BOSN STORE. WATER TIGHT INTEGRITY HAS BEEN COMPRIMISED.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2021
Resolved 3 December 2021
Resolution: Penetrating piping was removed and holes were welded over. Repairs verified by Class NKK, survey report attached.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 19 September 2021Resolved
WHERE CABLES WHICH ARE INSTALLED IN HAZARDOUS AREAS INTRODUCE THE RISK OF FIRE OR EXPLOSION IN THE EVENT OF AN ELECTRICAL FAULT IN SUCH AREAS, SPECIAL PRECAUTIONS AGAINST SUCH RISKS SHALL BE TAKEN TO THE SATISFACTION OF THE ADMINISTRATION. HYDRAULIC PUMP ESD ON #2 FORWARD HOLD COVER WAS NOT SEALED ALLOWING FLAMMABLE VAPOR TO ACCUMULATE. RECITFIY PRIOR TO CARRYING FLAMMABLE CARGO.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 19 September 2021
Resolved 3 December 2021
Resolution: Seal for cabling was repaired and verified by Class NKK, survey report is attached.
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 21 November 2019Resolved
All ships 3000GT and upwards shall have an operable 3 GHZ radar. Vessel's S-Band radar is inoperable.
SOLAS 74 (2014 Cons.) Reg. V/12
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Due 21 November 2019
Resolved 24 November 2019
Resolution: Received technician report attesting to repair and operational condition of s-band radar.
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 21 November 2019Resolved
If during voyage, any navigation equipment required by this part stops operating properly, ther person directing the movement of the vessel may continue to the next port of call subject to the direction of the district commander or the captain of the port zone. Vessel entered captain of the port zone without proper notification of inoperable S-Band radar.
33 CFR 164.55
Condition: Design Flaw
Action required: 10 - Deficiency Rectified
Resolved 21 November 2019
Resolution: Instructed vessel on the proper proceedures for reporting inoperable navigation equipment prior to entry.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.