Records from 2017 to 2021. Most recent: inspection, 18 September 2021.
Inspection history · 6
18 September 2021
COC-GAS Renew · PSC A
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7301120
13 September 2021
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7335643
26 August 2021
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7296988
8 April 2021
Deficiency Check
Physical examination · Investigations National Center of Expertise · Activity 7194613
26 December 2017
Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6328880
1 December 2017
Ballast Water Examination · COC-GAS Renew · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6314366
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 18 October 2021
Resolved
An immersion suit will cover the whole body. PSCO observed an immersion suit located in ECR had a hole in the glove.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 19 October 2021
Resolved 19 October 2021
Resolution: Vessel replaced immersion suit.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 18 September 2021
Resolved
The equipment should be capable of producing inert gas with an oxygen content at no time greater than 5% by volume. The PSA refrigerated dryer cooling piping failed during the examination, releasing large quantities of sea-water into the space.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 19 October 2021
Resolved 19 October 2021
Resolution: Vessel fixed broken seawater pipe.
02 - Structural Conditions › N/A - No Subsystem › Openings to cargo area, doors, ... scuttles
Issued 18 September 2021
Resolved
In ships carrying flammable products, electrical equipment which is not of the certified safe type in spaces protected by airlocks should be de-energize upon loss of overpressure in the space. The pressure monitoring device in the motor room was not operational at the time of examination.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 19 October 2021
Resolved 19 October 2021
Resolution: Vessel fixed pressure differential switch. USCG attended the next day and switch worked.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 18 September 2021
No resolution recorded
Administrations should take appropriate steps to ensure uniformity in the implementation and application of the provisions of this chapter in respect of electrical installations. Port and middle most re-liquefaction units were identified with pressure transmitters that did not include the specific EX marking for explosive gas atmospheres.
Condition: Placed in Improper Service
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 1 December 2021 — due date passed with no resolution recorded
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 18 September 2021
No resolution recorded
Protection screens of not more than 13mm square mesh should be fitted in outside openings of ventilation ducts. The lowermost starboard ventilation exhuast duct in the compressor room as well as the uppermost starboard ventilation had significant wastage to their protection screens.
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 1 December 2021 — due date passed with no resolution recorded
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 18 September 2021
No resolution recorded
Cables and wiring shall be installed and supported in such a manner as to avoid chafing or other damage. PSCO observed multiple installed overhead lightings in engine room had missing or improperly installed cable glands.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 December 2021 — due date passed with no resolution recorded
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Pressure
Issued 1 December 2017
Resolved
On ships carrying flammable or toxic products or both, a water-spray system for cooling, fire prevention and crew protection shoiuld be installed to cover cargo liquid and vapour discharge and loading manifolds. Deck spray coverage for port side manifold indequate for fire protection. 74 SOLAS (14) VII/13.1 - IGC Code 11.3.1.3
Action required: 705 - Other - as specified
Due 1 January 2018
Resolved 26 December 2017
Resolution: Received report of proper operation of the deck water spray system.
Documentation › Certificates/Documents › Certificate of Fitness (GC Code)
Issued 1 December 2017
Resolved
An IMO certificate is usually sufficient evidence of compliance with this part for the Coast Guard to endorse a foreign flag vessel's COC with the name of wach cargo listed in table 4. Vessel did not have current cargo of crude c4 listed on the Certificate of Fitness.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 1 January 2018
Resolved 26 December 2017
Resolution: Received updated COF with proper cargo authorizations. Company sent to MSC for update of SOE.