MAURY USCG vessel records Sign in
← All vessels

SABREWING

SABREWING is a 2003 tank ship. The Coast Guard has recorded 17 inspections since 2005, most recently in June 2021, along with 11 deficiencies and 1 operational control.

Records from 2005 to 2021. Most recent: inspection, 16 June 2021.

Built
2003
Last inspected
16 June 2021
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9278624 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
770169
Flag
PANAMA
—
Maury page id
psix-770169

Inspections, by type

…with no type recorded2
Years with a record 10 calendar years (2005–2021)
The 17 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 5 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it29665 - Convention (Subpart B), Gross Ton
13428 - Convention (Subpart B), Net Ton
49323 - Dead Weight, Metric Ton
58800 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 17

16 June 2021 PSC B · COC-CHEM Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7225018
17 March 2020 COC-CHEM & TVE Renew · PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6923124
25 October 2018 COC-CHEM Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6562647
29 January 2018 Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6345447
13 July 2017 ISPS II Exam · COC-CHEM & TVE Renew · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6199371
26 March 2014 Ballast Water Examination · ISPS II Exam · COE-Dockside · COC-CHEM & TVE Renew
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4819740
11 January 2009 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3391512
10 January 2009 Ballast Water Examination · PII Safety Exam · COC-CHEM Annual · MARPOL Annex I Examination · MARPOL Annex V Examination · ISPS I Exam · MARPOL Annex II Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3391685
11 April 2008 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3182150
26 February 2008 Administrative Inspection
Administrative · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3153897
6 November 2007 ISPS II Exam · MARPOL Annex I Examination · Ballast Water Examination · COC-TVE Renew
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3092461
4 April 2006 Administrative Inspection
Administrative · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2616373
4 October 2005 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2507259
3 October 2005 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2506650
12 August 2005 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2460441
16 July 2005 COC-CHEM Renew · Ballast Water Examination · ISPS II Exam · MARPOL Annex V Examination · MARPOL Annex I Examination · MARPOL Annex II Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2428307
15 July 2005 Type not recorded
No type recorded · Maritime Safety & Security Team New York (91106) · Activity 2428228

Deficiency record · 11

07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 17 March 2020 Resolved
07102-For tankers of 20,000 tonnes deadweight and upwards constructed on or after 1 July 2002 but before 1 January 2016, the protection of the cargo tanks shall be achieved by a fixed inert gas system in accordance with the requirements of the Fire Safety Systems Code. The system shall be capable of delivering inert gas with an oxygen content of not more than 5% by volume to the cargo tanks at any required rate of flow. PSCO observed the ships IG system unable to maintain the oxygen content below the required 5%. 74 SOLAS (14) II-2/4.5.5.1.1
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 17 March 2020
Personnel › Certificates/Documents/Licenses › License, Chief Mate
Issued 10 January 2009 Resolved
During USCG inspection, USCG inspectors found [name withheld] (CO) not knowledgably in his duties in regards to cargo handling ops, FF and lifesaving duties (req by STCW and company SMS). Flag administration is to access CO's competency and or take corrective action prior to vsl departing the Port of NY.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 January 2009
Resolution: Flag administration provided vessel with letter of dispensation dated 15JAN09 for CO for one way transit to vsl next port, then a new CO will join vessel.
Fire Fighting › Fire Hoses › Material
Issued 10 January 2009 Resolved
USCG inspectors noted burst FF hose during testing of fire pumps on board vessel. Vessel is to replace burst hose with new one. Fax purchase receipt to USCG.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 30 April 2009
Resolution: Crew could not produce purchase invoice for fire hoses. PSCEs verified ample spare fire hoses on board that are in good condition.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 10 January 2009 Resolved
USCG inspectors noted 04 clip patches (ship reported to company with no company reply as to when it would be repaired) and numerous doublers patches on associated vapor recovery piping. Vessels class society is to access serviceability of said piping. prior to vessel using the vapor recovery system in any cargo operations.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 16 January 2009
Resolution: Received class report# NY1615001. All must be corrected prior to vsls next Annual survey of Machinery No. 1.
Operations/Management › Port and Waterways Safety › Notice of Arrival, General
Issued 16 July 2005 Resolved
Vessel provided incorrect information on the Ships Advance Notice of Arrival, incorrect issuing authority for the Safe Management Certificate.
Action required: 17 - Rectify deficiencies prior to departure
Due 16 July 2005
Resolved 17 July 2005
Resolution: Vessel provided updated information to SANS prior departure.
Personnel › Certificates/Documents/Licenses › STCW Certificate, Master
Issued 16 July 2005 Resolved
Master's Panama STCW Endorsement is laminated and is without holder's signature. Prior to entry of the next US Port, Master to provide proof that endorsement is properly signed (Nevescanin, Viko)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 16 July 2005
Resolved 4 October 2005
Resolution: Received electronic copy of the Masters newly issued Panamanian application.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 16 July 2005 Resolved
Vessel Response Plan has the incorrect port information for New York, update the Vessel Response Plan. Provide proof of corrections to USCG Sector New York.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 16 July 2005
Resolved 12 August 2005
Resolution: Received confirmation that Vessel Response Plan has been updated to show the proper information for COTP New York.
Deck/Cargo › Inert Gas System › IGS Blower
Issued 16 July 2005 Resolved
The expansion bellow, for the #1 blower for IG System is cracked, install new bellow, to the satisfaction of Class.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 16 July 2005
Resolved 29 January 2018
Resolution: Received class report from ABS showing that item has been correceted.
Deck/Cargo › Inert Gas System › Deck Distribution System
Issued 16 July 2005 Resolved
Cargo tanks found with a vacuum, all pressure indicators are working accurately. Tanks pressurized with IG while onboard.
Action required: 705 - Other - as specified
Due 16 July 2005
Resolved 16 July 2005
Resolution: Tanks pressurized with IG while onboard.
Documentation › Safety Management System › Key Shipboard Operations Plans/Instructions
Issued 16 July 2005 Resolved
Safe Management Plan is computer based and is not accessible do to a virus in the computers. Provide proof from the recognized organization the computers are up and running.
Action required: 705 - Other - as specified
Due 16 July 2005
Resolved 3 October 2005
Resolution: Received class report from ABS showing that item has been corrected.
Documentation › Certificates/Documents › IOPP Certificate
Issued 16 July 2005 Resolved
IOPP Form "B" section 10 shows vessel may carry "the oil like NLS cargos in attached list". List must be signed, dated, and seal, however no list is found. Provide a copy of the list after going foreign.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 16 July 2005
Resolved 4 October 2005
Resolution: Received electronic copy of the attachment to the IOPP for NLS Cargo authorization.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.