Records from 2005 to 2008. Most recent: inspection, 23 May 2008.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 7
23 May 2008
Ballast Water Examination
Physical examination · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 3211774
12 May 2008
Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3204963
12 February 2008
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3146644
6 October 2006
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2794908
2 August 2005
PII Safety Exam · ISPS II Exam
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2444023
30 July 2005
Enhanced Seaway Inspection (Massena only) · Ballast Water Examination
Physical examination · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 2439517
30 July 2005
Joint Vessel Security Verification (Massena only)
Physical examination · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 2439520
Lifesaving › Rescue Boat › Rudder/Tiller/Steering
Issued 12 February 2008
Resolved
The rescue boat's rudder was unable to move due to hardened grease within the system. This inhibited the operational readiness of the rescue boat, causing an undue safety risk to the crew. 10c
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 20 February 2008
Resolution: Crew successfully repaired the rescue boat''s rudder so that it operated normally.
Lifesaving › Inflatable Liferafts › Not on Board
Issued 12 February 2008
Resolved
Liferaft on the bow was lost at sea due to heavy weather. 17a
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 February 2008
Resolution: Received Class report, stating, "6 man liferaft replaced with a new raft sited onboard; Type Viking 6DK 10959641 - Record of Approved Safety Equipment altered to indicate the change."
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 12 February 2008
Resolved
The rescue boat's rudder was unable to move due to hardened grease within the rudder system. This was caused by lack of maintenance as required by the Safety Management System. 17b
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 February 2008
Resolution: Received Class report, stating, "Safety officer will be instructed to perform tests on all movable equipment on the rescue boat; crew onboard will receive additional training of proper maintenance procedures regarding all safety equipment onboard."
Operations/Management › Vessel Safety Management › Company Verification/Review/Evaluation
Issued 12 February 2008
Resolved
Two deficiencies were outstanding from last PSC exam that have not been addressed in accordance with the Safety Management System. 17b
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 February 2008
Resolution: Received Class report, stating, "As per A & B letter the corrective action has been accepted. Corrective action proposed; Deficiencies have been rectified by replacement/repair of old/defective fire boxes, fire extinguishers."
Fire Fighting › Fire Hoses › Condition
Issued 6 October 2006
Resolved
Fire Hose boxes on main deck are tied shut and not ready for use. Boxes are tied shut due to handles being corroded and they no longer keep the boxes closed. 74 solas II-2/4.7.1 (2001 Consolidated ed.)
Action required: 705 - Other - as specified
Due 6 November 2006
Resolved 4 March 2008
Resolution: Received Class report, stating, "Deficiencies have been rectified by replacement/repair of old/defective fire boxes, fire extinguishers checked and all secured as per requirements."
Fire Fighting › Miscellaneous Items › Materials for Overboard Outlets
Issued 6 October 2006
Resolved
Note this component is not for overboard outlets. The Fire extinguisher on Port bow is not ready for use, due to it being tied to the bracket. The bracket is broken.
Action required: 705 - Other - as specified
Due 6 November 2006
Resolved 4 March 2008
Resolution: Received Class report, stating, "Deficiencies have been rectified by replacement/repair of old/defective fire boxes, fire extinguishers checked and all secured as per requirements."