Passenger (Inspected) · Passenger Ship class · Built 2000s · USCG Southwest District (CGD-SW) · Other hulls named HERON
HERON is a 2005 passenger vessel (inspected). The Coast Guard has recorded 39 inspections since 2005, most recently in October 2025, along with 69 deficiencies, 5 operational controls, 1 with no removal date recorded and 2 casualty investigations between 2007 and 2017.
Records from 2005 to 2025. Most recent: inspection, 7 October 2025.
- Built
- 2005
- Last inspected
- 7 October 2025
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 69 recorded · 0 without a recorded resolution
- Controls
- 1 with no removal date recorded
- Casualties
- 2 investigations · 2007–2017
Identity
1176317
WDI6925
783647
Flag
UNITED STATES
367064950, 367661130, 367723630 (licence lapsed)
Maury page id
psix-783647
Inspections, by type
…with no type recorded4
Years with a record
16 calendar years (2005–2025)
The 39 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)52.0 ft × 17.5 ft × 4.0 ft
Registered tonnagegross 24 / net 19
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCHESAPEAKE BOATS INC · CRISFIELD, MD, UNITED STATES · built 2005
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portSAUSALITO, CA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 24 August 2026 · expires 31 July 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it24 - Simplified, Gross Ton
19 - Simplified, Net Ton
19 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDI6925MMSI 367723630 · expired · compulsorily equipped · granted 26 March 2016, cancelled 30 May 2026
WDH8753MMSI 367661130 · expired · compulsorily equipped · granted 13 March 2015, cancelled 17 May 2025 · licensed under a name not among this hull’s recorded names (not shown)
WDC7021MMSI 367064950 · expired · compulsorily equipped · granted 1 September 2005, cancelled 7 November 2015
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 39
7 October 2025
Deficiency Check · COI Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8240779
29 July 2025
Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8197162
23 October 2024
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8023772
13 June 2023
Deficiency Check · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7714460
6 April 2023
Drydock Exam · Internal Structural Exam · Hull Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7664095
1 April 2023
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7660644
28 April 2022
Deficiency Check · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7439852
30 March 2021
Administrative Inspection · Deficiency Check · COI Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7156760
19 January 2021
Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7126797
30 April 2020
Internal Structural Exam · Drydock Exam · Examination of Repairs
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6945824
22 April 2020
Administrative Inspection · Examination of Repairs · Plan Review "T" Boat · Simplified Stability Test
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6964987
16 September 2019
Deficiency Check · Periodic Inspection · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6813481
18 March 2019
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6642814
1 October 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6552163
1 August 2018
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6515002
3 July 2018
Annual Inspection · DAPI Audit · Deficiency Check · Drydock Exam · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6458981
22 June 2018
Administrative Inspection · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6452692
14 October 2017
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6324739
25 September 2017
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6348773
29 August 2017
DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6253829
8 March 2017
Deficiency Check · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6101639
8 March 2017
Deficiency Check · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6119703
1 March 2017
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6119385
23 February 2017
Type not recorded
No type recorded · Maritime Safety & Security Team San Francisco (91105) · Activity 6093606
26 September 2016
Damage Survey
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6010162
26 February 2016
Internal Structural Exam · Administrative Inspection · Deficiency Check · COI Inspection · Re-Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5821854
11 February 2016
Examination of Repairs · Drydock Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5813063
5 August 2011
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 4145753
8 July 2011
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 4077561
13 March 2009
Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3432941
21 October 2008
Deficiency Check · DAPI Audit · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3348678
10 January 2008
Construction Oversight
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3134076
28 November 2007
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3127884
19 November 2007
Plan Review "T" Boat · Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3102102
7 November 2007
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3094442
23 July 2007
Damage Survey · Administrative Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3008907
11 July 2007
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2991588
27 September 2006
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2985455
23 August 2005
Initial Certification · Hull Examination · Simplified Stability Test · Plan Review "T" Boat
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2472273
Deficiency record · 69
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 7 October 2025
Resolved
Each survival craft on a vessel must be in good working order and ready for immediate use before the vessel leaves port and at all times when the vessel is underway. Observed that both of the life floats' retroreflective tapes were faded and peeling. Replace with new tape to the satisfaction of the MI.
(46 CFR 185.700(a))
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 7 October 2025
Resolved
A vessel must carry one floating waterlight, unless it it limited to daytime operation.. Observed that the ring life buoy's waterlight would not activate; battery is expired. Replace battery to enable proper illumination to the satisfaction of the MI.
(46 CFR 180.70(d))
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 7 October 2025
Resolved
At least one ring life buoy must be fitted with a lifeline. Observed that the line was worn and deteriorating. Replace line to the satisfaction of the MI.
(46 CFR 180.70(c))
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 7 October 2025
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Observed dead-end wires in the void underneath the toilet head. Cap the dead-end wires to the satisfaction of the MI.
(46 CFR 183.200(b))
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 29 July 2025
Resolved
Vapor barriers must be provided where insulation of any type is used in spaces where flammable and combustible liquids or vapors are present, such as machinery spaces and paint lockers. Observed wiring from the void underneath the toilet head extending towards fuel tank space missing a vapor barrier. Insulate the hole surrounding the wiring to become vapor-tight. (46 CFR 177.405(e)
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 13 June 2023
Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board a FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. The EPIRB battery is expired. Vessel is limited to within 3 miles from shore until replaced.
46 CFR 180.64
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 13 June 2023
Resolved
Oceans, coastwise, limited coastwise, and Great Lakes routes. A vessel on an oceans, coastwise, limited coastwise, or Great Lakes route must carry— (1) Six hand red flare distress signals approved in accordance with § 160.021 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.121; and (2) Six hand orange smoke distress signals approved in accordance with § 160.037 in subchapter Q of this chapter, or other standard specified by the Commandant. Vessel only has 4 valid red flare distress signals, all others have expired. Vessel is limited to 30 minute runs until all flares are onboard.
46 CFR 180.68(a)
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 June 2023
Resolved
Alcohol testing must be conducted on each individual engaged or employed on board the vessel who is directly involved in the SMI. The alcohol testing of each individual must be conducted within 2 hours of when the SMI occurred, unless precluded by safety concerns directly related to the incident. Vessel has one expired alcohol testing kit onboard. Vessel is restricted to transits within 2 hours of an approved alcohol testing facility until new kits are onboard.
46 CFR 4.06-3(a)(1)(i)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 June 2023
Resolved
A submersible electric bilge pump may be used as a power bilge pump required by Table 182.520(a) only on a vessel of not more than 19.8 meters (65 feet) in length carrying not more than 49 passengers, other than a ferry, provided that the pump is permanently mounted. The bilge pump sensor in the main accommodation space is not permanently mounted.
46 CFR 182.520(e)(3)
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 13 June 2023
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following inspection of all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather decks. The space for the anchor line is not weathertight and is allowing water ingress.
46 CFR 176.802(a)(1)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 June 2023
Resolved
A vessel is inspected for compliance with the standards required by this subchapter. The fresh water intake pipe is split at the connection to the tank.
46 CFR 176.800(a)
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 June 2023
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight container that is marked “First-Aid Kit”. A first-aid kit must be easily visible and readily available to the crew. The first aid kit have expired medication. Vessel is to remove all expired medication and replace with current medication.
46 CFR 184.710
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 13 June 2023
Resolved
At each initial and subsequent inspection for certification, the marine inspector may require that an abandon ship or man overboard drill be held under simulated emergency conditions specified by the inspector. Vessel did not have enough crew to conduct drills.
46 CFR 176.808(g)
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 1 April 2023
Resolved
A vessel that is exposed to salt water more than three months in any 12 month period since the last examination must undergo a drydock examination and an internal structural at least once every two years. Vessel has not had drydock examination and has lapsed. Resolve prior to carriage of passengers.
46 CFR 176.600(c)(1)
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 28 April 2022
Resolved
A vessel must comply with the applicable requirements for any radio and EPIRB installations, including the requirements for a station license and installation certificates to be issued by the FCC, as set forth in 47 CFR part 80. Vessel's FCC Radio Telephony Certificate was not onboard.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 28 April 2022
Resolved
Remote fuel shutoff stations must be marked in clearly legible letters at least 25 millimeters (1 inch) high. Fuel shutoff markings are partially peeled off.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 28 April 2022
Resolved
Each survival craft required on a vessel by this part must meet one of the following: (4) For a buoyant apparatus - Approved under approval series 160.010 or other standard specified by the Commandant. Each buoyant apparatus must have Type II retroreflective material meeting subpart 164.018 of this chapter on each side and end. The material must be in strips at least 50 mm (2 in.) wide extending from top to bottom over the side or end and continuing over the top and bottom surfaces of the apparatus. Retroreflective material on the lifefloat is deteriorated. 46 CFR 180.200(a)(4) and 46 CFR 160.010-4(p).
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 30 March 2021
Resolved
Each disposable hyrdostatic release unit must be marked with an expiration date of two years after installation and replaced once expired. Hydrostatic release uniit on EPIRB is expired. Operations restricted to SF Bay.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 19 January 2021
Resolved
Vessel did not complete annual inspection: Vessel must undergo an annual inspection within the 3 months before or after each anniversary date.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 22 April 2020
Resolved
When, in accordance with §178.210 of this chapter, a vessel must be provided with a stability letter, the stability letter... Current stability letter invalid due to the vessel being repowered and none of the new installed equipment has been approved by OCMI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 16 September 2019
Resolved
A bilge suction must be fitted with a suitable strainer having an open area not less than three times the area of the bilge pipe. Forward void bilge suction is missing strainer. 46 CFR 182.510(b)
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 16 September 2019
Resolved
A hatch cover must be attached to the hatch frame or coaming by hinges, captive chains, or other devices of substantial strength to prevent its loss. Lazarette and engine room hatch covers do not have functioning captive chains. 46 CFR 179.360(b)(2)
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 16 September 2019
Resolved
A vessel on an oceans, coastwise, limited coastwise, or Great Lakes route must carry six hand red flare distress signals approved in accordance with §160.021 in subchapter Q of this chapter, and six hand orange smoke distress signals approved in accordance with §160.037 in subchapter Q of this chapter. A hand red flare distress signal approved in accordance with §160.021 in subchapter Q of this chapter may be substituted for any of the hand orange smoke distress signals. Vessel was missing one hand red flare or hand orange smoke distress signal. 46 CFR 180.68(a)(1), (2), and (c)(2)(ii).
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 16 September 2019
Resolved
The floating waterlight must be attached around the body of the life float. Light was attached to an open end line which would have disconnected during launch. 46 CFR 180.175(f)(4)
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 16 September 2019
Resolved
Each survival craft must be secured to the vessel by a painter with a float-free link permanently attached to the vessel. The float-free link must be secured to the painter at one end and to the vessel on the other end. Painter lines were not attached to either life float due to broken spring clips. 46 CFR 180.130(a)(1) and 180.137(b)(3).
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 18 March 2019
Resolved
Stencil incorrect one side and grab line deteriorated.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 March 2019
Resolved
Remote fuel shutoff stations must be marked in clearly legible letters at least 25 millimeters (1 inch) high indicatingpurpose of the valve and direction of operation. Fuel shutoff valves were not marked.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 18 March 2019
Resolved
Masthead light inop.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 18 March 2019
Resolved
Vessel assigned Captain's license was expired.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 18 March 2019
Resolved
"Mid Cabin" bilge high level alarm inop, needs new speaker.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access Deck - hold/tank, etc.
Issued 18 March 2019
Resolved
Mid-cabin ladder not secured, and short fit to combing. Ladder needs securing.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 1 October 2018
Resolved
IMO: Vsl is broadcasting invalid IMO #, MMSI: Vsl is broadcasting invalid MMSI, CLSN: Vsl is broadcasting Invalid Call Sign, ZERO DRAFT: no static draft information
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 3 July 2018
Resolved
VOID 3 HIGH WATER ALARM MOUNT BROKEN. REMOUNT PER VESSEL PLANS AND DEMONSTRATE PROPER OPERATION.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 3 July 2018
Resolved
CRACKS AND PITTING FOUND ON BOTH STRUT WELDS. PROVIDE REPAIR OR RENEWAL PLAN AND DEMONSTRATE PROPER OPERATION DURING SEA TRIAL.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 July 2018
Resolved
BOTH MAIN ENGINE SALT WATER INTAKE VALVES SIEZED. DEMONSTRATE PROPER OPERATION.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 July 2018
Resolved
BOTH MAIN ENGINES LEAKING EXCESSIVE OIL. PROVIDE TECHNICIAN REPORT DOCUMENTING REPAIRS.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 July 2018
Resolved
EXHAUST PIPING FOR BOTH MAIN ENGINES SHOWS EVIDENCE OF SALT WATER AND EXHAUST LEAKS. TEMPORARY UNAPPROVED EXHAUST LAGGING FOUND TO PREVENT LEAKS. PROVIDE REPAIR OR RENEWAL PLAN AND DEMONSTRATE LEAK-FREE OPERATION DURING SEA TRIAL.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 3 July 2018
Resolved
Provide current FCC radio station license.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 July 2018
Resolved
Fire extinguishers and fixed fire fighting system due for annual service (last conducted Aug 2017).
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 3 July 2018
Resolved
No lifesaving equipment inspection log available for inspection.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 3 July 2018
Resolved
No drill or crew training log available for inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 3 July 2018
Resolved
Eight out of 12 required flares expired.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 3 July 2018
Resolved
EPIRB registration sticker expired. EPIRB hydrostatic release expiration unmarked. Route reduced to L/B/S.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 3 July 2018
Resolved
Charts, Coast Pilot, and light list unavailable for inspection.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 July 2018
Resolved
Fire hose inoperable.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 3 July 2018
Resolved
VHF-DSC radio not displaying GPS information. Repair requires FCC technician certification and updated FCC Radio Safety Certificate. Route reduced to L/B/S.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 3 July 2018
Resolved
Deck hand (Nora) not enrolled in DAPI program.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 22 June 2018
Resolved
Whenever damage or deterioration to hull plating or structural members that may affect the seaworthiness of a vessel is discovered or suspected, the cognizant OCMI may conduct an internal structural examination in any affected space including fuel tanks, and may require the vessel to be drydocked or taken out of service to assess the extent of the damage, and to effect permanent repairs. The OCMI may also decrease the drydock examination intervals to monitor the vessel's structural condition. The HERON was found with the following areas of actual damage or suspect areas in need of further evaluation to be conducted at the next dry-dock.
Bow Void: weeping from under internal strip plank in the port fwd upper corner & slight staining of the bilge
Void 2: fractured transverse frame in need of repair & weeping section in the aft stbd corner above chine
Void 3: fractured transverse frame in need of repair
Engine Room: repair leaking shaft seals and wet exhausts & remove all coatings from bottom longitudinal frames which appeared fractured 12" forward of the after bulkhead for evaluation
Lazarette: repair weeping rudder log and renewed rotted section of the deck above the fuel tank.
Fire Fighting › Fire Pumps › Power Source
Issued 29 August 2017
Resolved
Prove proper operation of fire pump on ship's power. Vessel restricted from ferry service until complete. 46CFR181.300(a)i
Engineering › Bilge Water Management System › Interface Detector
Issued 29 August 2017
Resolved
Prove operation of bilge high level alarm in aft lazarette. 46CFR182.530(a)i
Navigation › Piloting/Steering › Coast Guard Light List
Issued 29 August 2017
Resolved
Provide navigation rules and light list. 46CFR184.420
Documentation › Certificates/Documents › Stability Letter
Issued 29 August 2017
Resolved
Post stability letter 46CFR176.306
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 29 August 2017
Resolved
Complete DAPI Audit for company at next CG Inspection. 46CFR16.500
Fire Fighting › Fire Pumps › Arrangement
Issued 8 March 2017
Resolved
A self priming, power driven fire pump must be installed on each vessel of not more than 65ft in length which is a ferry vessel. Vessel is not outfitted with fire pump.
Engineering › Bilge Water Management System › Pump
Issued 8 March 2017
Resolved
Fire Fighting › Structural - Horizontal Zones › General
Issued 31 March 2016
Resolved
Engine Room main deck boundary must be lined with non-combustible panels or insulation approved IAW 164.009 in subchapter Q.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 31 March 2016
Resolved
Install machinery guards on exposed rotating machinery on both main propulsion engines.
Engineering › Diesel Engine (propulsion-direct drive) › Gear/Clutch Starter (hydraulic)
Issued 8 July 2011
Resolved
During seatrial, starboard main engine throttle cable snapped, disabling the starbaord engine. Affect permanent repairs prior to carrying passengers.
Communications › Alarms/Indicators › Bilge Alarm
Issued 8 July 2011
Resolved
Bilge pump switch at the operating station for the mid hold space inoperable, replace as new prior to carrying passengers.
Electrical › Electric Supply System (service) › Battery Installation
Issued 8 July 2011
Resolved
Batteries for the bow thruster inoperable, replace as new.
Electrical › Electrical Distribution System (emergency) › Ground Detection
Issued 21 October 2008
Resolved
Vessel currently does not have the fuel tank and/or through hull fittings properly bonded/grounded to a common neutral bus on-board the vessel. Vessel rep was given appropriate CFR sites and guidance on how to remedy the problem
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 21 October 2008
Resolved
Vessel owner does not have a copy of the vessel's MIS report on-board the boat. Vessel owner informed to keep an official copy of the MIS report on-board at all times.
Construction/Loadline › Hull › Longitudinal Frame
Issued 19 November 2007
Resolved
Engine compartment keel hasa 2 foot long crack in the woodframe. Keelson is cracked and needs to be replaced. Submit repair/replacement proposals. See attached photos for documentation.
Construction/Loadline › Penetrations › Weld
Issued 19 November 2007
Resolved
stress crack in stbd rudder post. Vessel owner stated that he will submit repair proposal to SecBalt.
Construction/Loadline › Hull › Hull Plating
Issued 19 November 2007
Resolved
STBD side of vessel approximately 4 feet from bow has 3 foot long spider web crack in the fiberglass from the deck line to the waterline. Vsl owner will submit repair plans to SecBalt. See attached photos for visual cue.
Construction/Loadline › Hull › Hull Plating
Issued 19 November 2007
Resolved
21 feet from stern on the stbd side and 13" from waterline there is a 6"x6" de-lamination area on hull structure. Vsl owner will submit repair proposal to SecBalt. See attached photos
Construction/Loadline › Hull › Hull Plating
Issued 19 November 2007
Resolved
25 feet from the bow on the port side there is a 1"x1" lump in the fiberglass hull. Vsl owner will submit repair proposal to SecBalt. See attached photos.
Construction/Loadline › Hull › Hull Plating
Issued 19 November 2007
Resolved
On the port side of vessel, approximately 25 feet aft of the bow there is de-lamination 3 feet from waterline near keel. Vsl ower will submit repair proposal to SecBalt. See attached photos.
Construction/Loadline › Hull › Transverse Frame
Issued 19 November 2007
Resolved
Forward storage space/compartment has 02 transverse frames with extensive cracks in each. Frames 01-02 from bulkhead have large cracks. Vsl owner will submit replacement plans to SecBalt. See attached photos.
Casualty record · 2
28 November 2007Routine · role: Involved in a Marine Casualty · activity 3127884
14 October 2017Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 6324739
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Recorded names · 1
EMPRESS PINTAIL II (2007). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.