MAURY USCG vessel records
← All vessels

HERON

HERON is a 2005 passenger vessel (inspected). The Coast Guard has recorded 27 inspections since 2016, most recently in October 2025, along with 57 deficiencies, 5 operational controls, 1 with no removal date recorded and 2 casualty investigations between 2007 and 2017.

Records from 2007 to 2025. Most recent: inspection, 7 October 2025.

Built
2005
Last inspected
7 October 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
1 with no removal date recorded

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 7 October 2025
…with no type recorded3
Operational controls 1 with no removal date recorded
Years with a record 10 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDI6925
783647
Flag
UNITED STATES
Maury page id
psix-783647

Documentation record

Registered dimensions (L × B × D)52.0 ft × 17.5 ft × 4.0 ft
Registered tonnagegross 24 / net 19
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCHESAPEAKE BOATS INC · CRISFIELD, MD, UNITED STATES · built 2005
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portSAUSALITO, CA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 18 July 2025 · expires 31 July 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it24 - Simplified, Gross Ton
19 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 27

7 October 2025 Deficiency Check · COI Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8240779
29 July 2025 Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8197162
23 October 2024 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8023772
13 June 2023 Deficiency Check · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7714460
6 April 2023 Drydock Exam · Internal Structural Exam · Hull Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7664095
1 April 2023 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7660644
28 April 2022 Deficiency Check · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7439852
30 March 2021 Administrative Inspection · Deficiency Check · COI Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7156760
19 January 2021 Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7126797
30 April 2020 Internal Structural Exam · Drydock Exam · Examination of Repairs
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6945824
22 April 2020 Administrative Inspection · Examination of Repairs · Plan Review "T" Boat · Simplified Stability Test
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6964987
16 September 2019 Deficiency Check · Periodic Inspection · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6813481
18 March 2019 Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6642814
1 October 2018 Administrative Inspection
Administrative · Navigation Center · Activity 6552163
1 August 2018 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6515002
3 July 2018 Annual Inspection · DAPI Audit · Deficiency Check · Drydock Exam · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6458981
22 June 2018 Administrative Inspection · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6452692
14 October 2017 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6324739
25 September 2017 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6348773
29 August 2017 DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6253829
8 March 2017 Deficiency Check · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6101639
8 March 2017 Deficiency Check · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6119703
1 March 2017 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6119385
23 February 2017 Type not recorded
No type recorded · Maritime Safety & Security Team San Francisco (91105) · Activity 6093606
26 September 2016 Damage Survey
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6010162
26 February 2016 Internal Structural Exam · Administrative Inspection · Deficiency Check · COI Inspection · Re-Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5821854
11 February 2016 Examination of Repairs · Drydock Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5813063

Deficiency record · 57

11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 7 October 2025 Resolved
Each survival craft on a vessel must be in good working order and ready for immediate use before the vessel leaves port and at all times when the vessel is underway. Observed that both of the life floats' retroreflective tapes were faded and peeling. Replace with new tape to the satisfaction of the MI. (46 CFR 185.700(a))
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 October 2025
Resolved 20 January 2026
Resolution: Accepted photo of replaced retro.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 7 October 2025 Resolved
A vessel must carry one floating waterlight, unless it it limited to daytime operation.. Observed that the ring life buoy's waterlight would not activate; battery is expired. Replace battery to enable proper illumination to the satisfaction of the MI. (46 CFR 180.70(d))
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 October 2025
Resolved 18 November 2025
Resolution: Witnessed new battery onboard.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 7 October 2025 Resolved
At least one ring life buoy must be fitted with a lifeline. Observed that the line was worn and deteriorating. Replace line to the satisfaction of the MI. (46 CFR 180.70(c))
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 October 2025
Resolved 19 January 2026
Resolution: Accepted photo of replaced line.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 7 October 2025 Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Observed dead-end wires in the void underneath the toilet head. Cap the dead-end wires to the satisfaction of the MI. (46 CFR 183.200(b))
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 October 2025
Resolved 20 January 2026
Resolution: Accepted photo of repair.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 29 July 2025 Resolved
Vapor barriers must be provided where insulation of any type is used in spaces where flammable and combustible liquids or vapors are present, such as machinery spaces and paint lockers. Observed wiring from the void underneath the toilet head extending towards fuel tank space missing a vapor barrier. Insulate the hole surrounding the wiring to become vapor-tight. (46 CFR 177.405(e)
Condition: Design Flaw
Action required: 705 - Other - as specified
Resolved 20 January 2026
Resolution: Accepted photo of repair.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 13 June 2023 Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board a FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. The EPIRB battery is expired. Vessel is limited to within 3 miles from shore until replaced. 46 CFR 180.64
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 14 July 2023
Resolution: Verified new EPIRB battery was installed.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 13 June 2023 Resolved
Oceans, coastwise, limited coastwise, and Great Lakes routes. A vessel on an oceans, coastwise, limited coastwise, or Great Lakes route must carry— (1) Six hand red flare distress signals approved in accordance with § 160.021 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.121; and (2) Six hand orange smoke distress signals approved in accordance with § 160.037 in subchapter Q of this chapter, or other standard specified by the Commandant. Vessel only has 4 valid red flare distress signals, all others have expired. Vessel is limited to 30 minute runs until all flares are onboard. 46 CFR 180.68(a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 14 July 2023
Resolution: Verified all flares onboard.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 June 2023 Resolved
Alcohol testing must be conducted on each individual engaged or employed on board the vessel who is directly involved in the SMI. The alcohol testing of each individual must be conducted within 2 hours of when the SMI occurred, unless precluded by safety concerns directly related to the incident. Vessel has one expired alcohol testing kit onboard. Vessel is restricted to transits within 2 hours of an approved alcohol testing facility until new kits are onboard. 46 CFR 4.06-3(a)(1)(i)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 14 July 2023
Resolution: No longer valid/Vessel has disenrolled in DAPI program and let go of employees pending sales of the vessel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 June 2023 Resolved
A submersible electric bilge pump may be used as a power bilge pump required by Table 182.520(a) only on a vessel of not more than 19.8 meters (65 feet) in length carrying not more than 49 passengers, other than a ferry, provided that the pump is permanently mounted. The bilge pump sensor in the main accommodation space is not permanently mounted. 46 CFR 182.520(e)(3)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2023
Resolved 14 July 2023
Resolution: Bilge sensor is permanently mounted.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 13 June 2023 Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following inspection of all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather decks. The space for the anchor line is not weathertight and is allowing water ingress. 46 CFR 176.802(a)(1)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2023
Resolved 14 July 2023
Resolution: Space has been properly caulked
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 June 2023 Resolved
A vessel is inspected for compliance with the standards required by this subchapter. The fresh water intake pipe is split at the connection to the tank. 46 CFR 176.800(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2023
Resolved 14 July 2023
Resolution: Pipe has been replaced.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 June 2023 Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight container that is marked “First-Aid Kit”. A first-aid kit must be easily visible and readily available to the crew. The first aid kit have expired medication. Vessel is to remove all expired medication and replace with current medication. 46 CFR 184.710
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2023
Resolved 14 July 2023
Resolution: New medication has been put onboard.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 13 June 2023 Resolved
At each initial and subsequent inspection for certification, the marine inspector may require that an abandon ship or man overboard drill be held under simulated emergency conditions specified by the inspector. Vessel did not have enough crew to conduct drills. 46 CFR 176.808(g)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 June 2023
Resolved 14 July 2023
Resolution: Conducted underway drills.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 1 April 2023 Resolved
A vessel that is exposed to salt water more than three months in any 12 month period since the last examination must undergo a drydock examination and an internal structural at least once every two years. Vessel has not had drydock examination and has lapsed. Resolve prior to carriage of passengers. 46 CFR 176.600(c)(1)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 April 2023
Resolution: Completed drydock examination.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 28 April 2022 Resolved
A vessel must comply with the applicable requirements for any radio and EPIRB installations, including the requirements for a station license and installation certificates to be issued by the FCC, as set forth in 47 CFR part 80. Vessel's FCC Radio Telephony Certificate was not onboard.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2022
Resolved 9 May 2022
Resolution: Radio Telephony Certificate was provided.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 28 April 2022 Resolved
Remote fuel shutoff stations must be marked in clearly legible letters at least 25 millimeters (1 inch) high. Fuel shutoff markings are partially peeled off.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2022
Resolved 16 May 2022
Resolution: Received photograph of label.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 28 April 2022 Resolved
Each survival craft required on a vessel by this part must meet one of the following: (4) For a buoyant apparatus - Approved under approval series 160.010 or other standard specified by the Commandant. Each buoyant apparatus must have Type II retroreflective material meeting subpart 164.018 of this chapter on each side and end. The material must be in strips at least 50 mm (2 in.) wide extending from top to bottom over the side or end and continuing over the top and bottom surfaces of the apparatus. Retroreflective material on the lifefloat is deteriorated. 46 CFR 180.200(a)(4) and 46 CFR 160.010-4(p).
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2022
Resolved 2 June 2022
Resolution: Received photographs of new retroreflective material.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 30 March 2021 Resolved
Each disposable hyrdostatic release unit must be marked with an expiration date of two years after installation and replaced once expired. Hydrostatic release uniit on EPIRB is expired. Operations restricted to SF Bay.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 13 April 2021
Resolution: Hydrostatic release replaced.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 19 January 2021 Resolved
Vessel did not complete annual inspection: Vessel must undergo an annual inspection within the 3 months before or after each anniversary date.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 January 2021
Resolved 15 March 2021
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 22 April 2020 Resolved
When, in accordance with §178.210 of this chapter, a vessel must be provided with a stability letter, the stability letter... Current stability letter invalid due to the vessel being repowered and none of the new installed equipment has been approved by OCMI.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Resolved 16 March 2021
Resolution: Vessel completed satisfactory SST.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 16 September 2019 Resolved
A bilge suction must be fitted with a suitable strainer having an open area not less than three times the area of the bilge pipe. Forward void bilge suction is missing strainer. 46 CFR 182.510(b)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 September 2019
Resolved 25 September 2019
Resolution: Received photos from operator of corrected deficiency.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 16 September 2019 Resolved
A hatch cover must be attached to the hatch frame or coaming by hinges, captive chains, or other devices of substantial strength to prevent its loss. Lazarette and engine room hatch covers do not have functioning captive chains. 46 CFR 179.360(b)(2)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 September 2019
Resolved 25 September 2019
Resolution: Received photos from operator of corrected deficiency.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 16 September 2019 Resolved
A vessel on an oceans, coastwise, limited coastwise, or Great Lakes route must carry six hand red flare distress signals approved in accordance with §160.021 in subchapter Q of this chapter, and six hand orange smoke distress signals approved in accordance with §160.037 in subchapter Q of this chapter. A hand red flare distress signal approved in accordance with §160.021 in subchapter Q of this chapter may be substituted for any of the hand orange smoke distress signals. Vessel was missing one hand red flare or hand orange smoke distress signal. 46 CFR 180.68(a)(1), (2), and (c)(2)(ii).
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 16 September 2019
Resolution: Operator purchased four additional hand red flare distress signals during inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 16 September 2019 Resolved
The floating waterlight must be attached around the body of the life float. Light was attached to an open end line which would have disconnected during launch. 46 CFR 180.175(f)(4)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 16 September 2019
Resolution: Operator permanently attached to life float during inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 16 September 2019 Resolved
Each survival craft must be secured to the vessel by a painter with a float-free link permanently attached to the vessel. The float-free link must be secured to the painter at one end and to the vessel on the other end. Painter lines were not attached to either life float due to broken spring clips. 46 CFR 180.130(a)(1) and 180.137(b)(3).
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 16 September 2019
Resolution: Operator permanently attached painter lines to life floats during inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 18 March 2019 Resolved
Stencil incorrect one side and grab line deteriorated.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 18 March 2019
Resolved 18 March 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 March 2019 Resolved
Remote fuel shutoff stations must be marked in clearly legible letters at least 25 millimeters (1 inch) high indicatingpurpose of the valve and direction of operation. Fuel shutoff valves were not marked.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 18 March 2019
Resolved 18 March 2019
Resolution: Operator marked location with proper stenciling.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 18 March 2019 Resolved
Masthead light inop.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 18 March 2019
Resolved 18 March 2019
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 18 March 2019 Resolved
Vessel assigned Captain's license was expired.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 April 2019
Resolved 16 September 2019
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 18 March 2019 Resolved
"Mid Cabin" bilge high level alarm inop, needs new speaker.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 March 2019
Resolved 18 March 2019
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access Deck - hold/tank, etc.
Issued 18 March 2019 Resolved
Mid-cabin ladder not secured, and short fit to combing. Ladder needs securing.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 April 2019
Resolved 19 March 2019
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 1 October 2018 Resolved
IMO: Vsl is broadcasting invalid IMO #, MMSI: Vsl is broadcasting invalid MMSI, CLSN: Vsl is broadcasting Invalid Call Sign, ZERO DRAFT: no static draft information
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 17 February 2021
Resolution: Corrected
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 3 July 2018 Resolved
VOID 3 HIGH WATER ALARM MOUNT BROKEN. REMOUNT PER VESSEL PLANS AND DEMONSTRATE PROPER OPERATION.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 July 2018
Resolved 1 August 2018
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 3 July 2018 Resolved
CRACKS AND PITTING FOUND ON BOTH STRUT WELDS. PROVIDE REPAIR OR RENEWAL PLAN AND DEMONSTRATE PROPER OPERATION DURING SEA TRIAL.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 July 2018
Resolved 1 August 2018
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 July 2018 Resolved
BOTH MAIN ENGINE SALT WATER INTAKE VALVES SIEZED. DEMONSTRATE PROPER OPERATION.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 July 2018
Resolved 1 August 2018
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 July 2018 Resolved
BOTH MAIN ENGINES LEAKING EXCESSIVE OIL. PROVIDE TECHNICIAN REPORT DOCUMENTING REPAIRS.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 August 2018
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 July 2018 Resolved
EXHAUST PIPING FOR BOTH MAIN ENGINES SHOWS EVIDENCE OF SALT WATER AND EXHAUST LEAKS. TEMPORARY UNAPPROVED EXHAUST LAGGING FOUND TO PREVENT LEAKS. PROVIDE REPAIR OR RENEWAL PLAN AND DEMONSTRATE LEAK-FREE OPERATION DURING SEA TRIAL.
Action required: 705 - Other - as specified
Due 3 July 2018
Resolved 1 August 2018
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 3 July 2018 Resolved
Provide current FCC radio station license.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2018
Resolved 17 August 2018
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 July 2018 Resolved
Fire extinguishers and fixed fire fighting system due for annual service (last conducted Aug 2017).
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2018
Resolved 17 August 2018
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 3 July 2018 Resolved
No lifesaving equipment inspection log available for inspection.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 August 2018
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 3 July 2018 Resolved
No drill or crew training log available for inspection.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 August 2018
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 3 July 2018 Resolved
Eight out of 12 required flares expired.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 August 2018
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 3 July 2018 Resolved
EPIRB registration sticker expired. EPIRB hydrostatic release expiration unmarked. Route reduced to L/B/S.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2018
Resolved 17 August 2018
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 3 July 2018 Resolved
Charts, Coast Pilot, and light list unavailable for inspection.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 August 2018
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 July 2018 Resolved
Fire hose inoperable.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 August 2018
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 3 July 2018 Resolved
VHF-DSC radio not displaying GPS information. Repair requires FCC technician certification and updated FCC Radio Safety Certificate. Route reduced to L/B/S.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2018
Resolved 10 September 2018
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 3 July 2018 Resolved
Deck hand (Nora) not enrolled in DAPI program.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 September 2018
Resolved 17 August 2018
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 22 June 2018 Resolved
Whenever damage or deterioration to hull plating or structural members that may affect the seaworthiness of a vessel is discovered or suspected, the cognizant OCMI may conduct an internal structural examination in any affected space including fuel tanks, and may require the vessel to be drydocked or taken out of service to assess the extent of the damage, and to effect permanent repairs. The OCMI may also decrease the drydock examination intervals to monitor the vessel's structural condition. The HERON was found with the following areas of actual damage or suspect areas in need of further evaluation to be conducted at the next dry-dock. Bow Void: weeping from under internal strip plank in the port fwd upper corner & slight staining of the bilge Void 2: fractured transverse frame in need of repair & weeping section in the aft stbd corner above chine Void 3: fractured transverse frame in need of repair Engine Room: repair leaking shaft seals and wet exhausts & remove all coatings from bottom longitudinal frames which appeared fractured 12" forward of the after bulkhead for evaluation Lazarette: repair weeping rudder log and renewed rotted section of the deck above the fuel tank.
Action required: 705 - Other - as specified
Due 3 July 2018
Resolved 1 August 2018
Fire Fighting › Fire Pumps › Power Source
Issued 29 August 2017 Resolved
Prove proper operation of fire pump on ship's power. Vessel restricted from ferry service until complete. 46CFR181.300(a)i
Due 29 August 2017
Resolved 1 September 2017
Resolution: Marine inspector observed fire pump to be running properly off of generator.
Engineering › Bilge Water Management System › Interface Detector
Issued 29 August 2017 Resolved
Prove operation of bilge high level alarm in aft lazarette. 46CFR182.530(a)i
Due 12 September 2017
Resolved 1 September 2017
Resolution: Observed high water alarm for aft lazarette to be functioning properly.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 29 August 2017 Resolved
Provide navigation rules and light list. 46CFR184.420
Due 29 September 2017
Resolved 1 September 2017
Resolution: Publications onboard vessel.
Documentation › Certificates/Documents › Stability Letter
Issued 29 August 2017 Resolved
Post stability letter 46CFR176.306
Due 29 September 2017
Resolved 1 September 2017
Resolution: Provided owner with stability letters for Osprey and Heron.
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 29 August 2017 Resolved
Complete DAPI Audit for company at next CG Inspection. 46CFR16.500
Action required: 705 - Other - as specified
Resolved 1 August 2018
Fire Fighting › Fire Pumps › Arrangement
Issued 8 March 2017 Resolved
A self priming, power driven fire pump must be installed on each vessel of not more than 65ft in length which is a ferry vessel. Vessel is not outfitted with fire pump.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 8 April 2017
Resolved 26 May 2017
Resolution: Marine Inspector inspected installation & witnessed operational test of vessel fire pump.
Engineering › Bilge Water Management System › Pump
Issued 8 March 2017 Resolved
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 8 April 2017
Resolved 26 May 2017
Resolution: Marine Inspector inspected installation and witnessed tests of vessel's fixed bilge pumping system.
Fire Fighting › Structural - Horizontal Zones › General
Issued 31 March 2016 Resolved
Engine Room main deck boundary must be lined with non-combustible panels or insulation approved IAW 164.009 in subchapter Q.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 September 2016
Resolved 6 April 2017
Resolution: T&K manual: Commandant decision for use of general purpose FRP resin alone is acceptable as long as it is for non-structural purposes. Vessel is wood framed and marine grade plywood hull w/ FRP overlay and No FRP laid interior of machinery space.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 31 March 2016 Resolved
Install machinery guards on exposed rotating machinery on both main propulsion engines.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 September 2016
Resolved 1 September 2016
Resolution: Machinery belt guards installed on port and starboard main engines.

Casualty record · 2

28 November 2007Routine · role: Involved in a Marine Casualty · activity 3127884
14 October 2017Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 6324739
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

EMPRESS PINTAIL II (2007). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.