MAURY USCG vessel records
← All vessels

LEHIGH VALLEY NO. 79

Built
Not recorded
Last inspected
17 April 2025
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.

Inspection record

Last inspected 17 April 2025
Operational controls None recorded without a removal date
Years with a record 19 calendar years (2005–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

784230
Flag
UNITED STATES
Tonnage
454 - Simplified, Gross Ton
Maury page id
psix-784230
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 30

17 April 2025 Internal Structural Exam · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8113412
25 April 2024 COI Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7891818
21 April 2023 In-Service Inspection · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7668586
13 April 2022 COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7430332
22 April 2021 COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7180857
23 April 2020 COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6943043
25 April 2019 COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6669684
25 April 2018 COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6398972
20 April 2017 COI Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6141279
19 April 2016 Attraction Vessel Exam · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5857891
28 July 2015 Drydock Exam
Physical examination · Commandant (CG-5P-TI) · Activity 5792335
1 July 2015 Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5199856
24 April 2015 Attraction Vessel Exam · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5109847
30 July 2014 Administrative Inspection · Plan Review "T" Boat
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4932137
14 May 2014 Plan Review "T" Boat
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4858359
14 May 2014 In-Service Inspection
Physical examination · Commandant (CG-5P-TI) · Activity 4901707
30 April 2014 Attraction Vessel Exam · In-Service Inspection · Deficiency Check · COI Inspection · Internal Structural Exam · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4847156
24 April 2012 Attraction Vessel Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4294083
13 October 2010 Deficiency Check · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3870406
16 April 2010 Internal Structural Exam · COI Inspection · Deficiency Check · Attraction Vessel Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3717281
29 June 2009 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 3517865
27 April 2009 Attraction Vessel Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3461849
13 March 2009 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 3433000
29 September 2008 Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3334758
22 April 2008 Attraction Vessel Exam · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3189514
3 October 2007 Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3072144
24 August 2007 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 3037062
25 April 2007 Attraction Vessel Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2915587
20 June 2006 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2685811
24 August 2005 COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2473503

Deficiency record · 27

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 April 2025 Resolved
"Each hot water supply boiler must have at least one safety relief valve and a temperature relief valve or a pressure-temperature relief valve." MI observed safety relief valves on boilers with isolation valves on the piping between the boiler and the relief valve. Remove isolation valves from boilers. 46 CFR 53.05-2
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2025
Resolved 11 August 2025
Resolution: Sallustio & Son removed the isolation valves from the relief vales & operator submitted photos.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 25 April 2024 Resolved
Each portable fire extinguisher on a vessel must be of an approved type. The minimum number of portable fire extinguishers required on a vessel must be acceptable to the cognizant Officer in Charge, Marine Inspection, but must not be fewer than the minimum number required by Table 181.500(b) and other provisions of this section. 01 portable fire extinguisher non-compliant.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 May 2024
Resolved 17 May 2024
Resolution: Photo evidence of the new portable fire extinguisher and video of the emergency lighting are well received.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 April 2024 Resolved
(a) Each vessel must have adequate emergency lighting fitted along the line of escape to the main deck from all passenger and crew accommodation spaces located below the main deck. (b) The emergency lighting required by paragraph (a) of this section must automatically actuate upon failure of the main lighting system. If a vessel is not equipped with a single source of power for emergency lighting, it must have individual battery powered lights that: (1) Are automatically actuated upon loss of normal power; (2) Are not readily portable; (3) Are connected to an automatic battery charger; and (4) Have sufficient capacity for a minimum of 2 hours of continuous operation.Several emergency light were not functioning properly.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 May 2024
Resolved 17 May 2024
Resolution: Photo evidence of the new portable fire extinguisher and video of the emergency lighting are well received.
08 - Alarms › N/A - No Subsystem › Boiler alarm
Issued 13 April 2022 Resolved
Flame out sensor/ alarm not fuctional on outboard boiler unit.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 21 April 2023
Resolution: Marine inspector witnessed functional flame-out sensor with boiler technician.
Engineering › Pressure Vessel › Piping
Issued 24 April 2015 Resolved
The inspection plug was damaged and sheared off when attempted to be removed. Make pressure vessel available for inspection.
Action required: 705 - Other - as specified
Due 2 June 2015
Resolved 9 September 2015
Resolution: the pressure vessel was replaced, see uploaded U1-a Report.
Engineering › Steam Boiler (auxiliary/waste heat) › Furnace
Issued 30 April 2014 Resolved
Perform hydrostatic test of boilers (outboard and inboard) in the presence of a CG MI and make fireside available for visual inspection.
Action required: 705 - Other - as specified
Due 30 May 2014
Resolved 5 May 2014
Resolution: Conducted hydro test at 40 psi and visual fireside inspection. Tested safety valves and low level and flame-out shut downs.
Communications › Visual Communication › Warning Sign (gangway)
Issued 16 April 2010 Resolved
Provide and post "No Smoking" signs at the gangway in view of passengers as they are loading.
Action required: 705 - Other - as specified
Due 27 April 2010
Resolved 4 May 2010
Resolution: No smoking signs were posted in visible locations at both entrance gangways.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 16 April 2010 Resolved
Properly stuff all wiring into the junction box in the utility room located in the vicinity of the 40 gallon water heater tank. Ensure all openings in the junction box are capped off and watertight.
Action required: 705 - Other - as specified
Due 27 April 2010
Resolved 4 May 2010
Resolution: All wiring was properly secured into the junction boxes and all openings were sealed.
Electrical › Electrical Distribution System (service) › Cable
Issued 16 April 2010 Resolved
Remove dead ended cable located in the starboard side passageway in the vicinity of the access ladder.
Action required: 705 - Other - as specified
Due 27 April 2010
Resolved 4 May 2010
Resolution: Dead end cable was properly blanked off and stuffed into an appropriate junction box.
Engineering › Compressed Air System (control) › Compressor
Issued 16 April 2010 Resolved
Conduct a hydrostatic pressure test of the air receiver and associated safety relief valve located in the starboard alleyway.
Action required: 705 - Other - as specified
Due 27 April 2010
Resolved 4 May 2010
Resolution: Hydrostatic pressure was conducted to 300 PSI. Safety relief valve worked at just below 200 PSI.
Construction/Loadline › Hull › Bottom Plating
Issued 29 September 2008 Resolved
As per OCMI New York ltr dtd Aug 23, 2007, the vessel must conduct an Underwater Survey Inspection to determine the condition of the Kydex sheathing. This requirement must be satisfied prior to vessel movement from Redhook Pier #44 but no later than Sept 30, 2009.
Due 30 September 2010
Resolved 13 October 2010
Resolution: Completed satisfactory underwater survey of barge.
Construction/Loadline › Hull › Bottom Plating
Issued 29 September 2008 Resolved
Vessel must submit an underwater survey plan in accordance with Navigation and Inspection Circular 1-89 to the OCMI New York 30 days prior to the underwater survey. This requirement must be completed no later than 30 Sept 2009.
Due 30 September 2010
Resolved 13 October 2010
Resolution: Acceptable underwater survey plan in accordance with NVIC 1-89 was prepared and submitted to OCMI.
Personnel › Training › Crowd Management
Issued 25 April 2007 Resolved
Vessel needs to find or develop an emergency action plan to address evacuation of passengers in the event of an emergency on board and procedures for responding to passenger injuries.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 May 2007
Communications › Alarms/Indicators › General Alarm
Issued 25 April 2007 Resolved
Lable the boiler alarm
Action required: 705 - Other - as specified
Due 7 May 2007
Resolved 3 May 2007
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 25 April 2007 Resolved
Splice the life lines around the body of the life rings
Action required: 705 - Other - as specified
Due 7 May 2007
Resolved 3 May 2007
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 25 April 2007 Resolved
Provide a USCG approved floating water light IAW 46CFR180.70(d), prior to night time operations.
Action required: 705 - Other - as specified
Due 7 May 2007
Resolved 3 May 2007
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 25 April 2007 Resolved
Repair the following emergency lights: main entrance, port side below deck passageway, and port side below deck forward of the bedroom.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 May 2007
Operations/Management › Drills/Instruction › Safety Orientation
Issued 25 April 2007 Resolved
Conduct a drill IAW the emergency procedures prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 May 2007
Electrical › Electrical Distribution System (service) › Conductor
Issued 24 August 2005 Resolved
Provide load analysis for AC and DC electrical systems.
Action required: 705 - Other - as specified
Due 23 June 2006
Resolved 20 June 2006
Fire Fighting › Fixed Fire Detection System › Arrangement
Issued 24 August 2005 Resolved
Make changes to main deck fire control plan and submit (3 copies) for approval.
Action required: 705 - Other - as specified
Due 23 June 2006
Resolved 20 June 2006
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 24 August 2005 Resolved
Properly label all circuit breakers.
Action required: 705 - Other - as specified
Due 23 June 2006
Resolved 20 June 2006
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 24 August 2005 Resolved
Make changes to main deck electrical plan and submit (3 copies) for approval.
Action required: 705 - Other - as specified
Due 23 June 2006
Resolved 20 June 2006
Engineering › Steam Boiler (auxiliary/waste heat) › Piping
Issued 24 August 2005 Resolved
Install flex hose that meets J-1942 for fuel service on boilers.
Action required: 705 - Other - as specified
Due 23 June 2006
Resolved 19 January 2007
Engineering › Steam Boiler (auxiliary/waste heat) › Piping
Issued 24 August 2005 Resolved
Update fuel piping plan once flex hose installed and submit (3 copies) for approval.
Action required: 705 - Other - as specified
Due 23 June 2006
Resolved 20 June 2006
Engineering › Steam Boiler (auxiliary/waste heat) › Automation Equipment
Issued 24 August 2005 Resolved
Prove proper operation of boilers alarms/shutdowns.
Action required: 705 - Other - as specified
Due 23 June 2006
Resolved 26 April 2007
Engineering › Fuel Oil Service System › Valve
Issued 24 August 2005 Resolved
Install and label manually operated fuel shut-off valves on port/stbd fuel tanks.
Action required: 705 - Other - as specified
Due 23 June 2006
Resolved 19 January 2007
Documentation › Certificates/Documents › Proof of Consortium Enrollment (DAPI)
Issued 24 August 2005 Resolved
Provide valid DAPI contract.
Action required: 705 - Other - as specified
Due 23 June 2006
Resolved 20 June 2006

Source. US Coast Guard records through 23 August 2026, retrieved 5 September 2026. Vessels the Coast Guard classes as Barge or Towing Vessel. Coverage and known gaps.

Maury does not score, rate, or grade vessels. What Maury does not do · Glossary · Correct a record.