← All vessels
WLADYSLAW ORKAN
WLADYSLAW ORKAN is a 2003 public freight. The Coast Guard has recorded 32 inspections since 2005, most recently in March 2025, along with 14 deficiencies and 5 operational controls.
Records from 2005 to 2025. Most recent: inspection, 10 March 2025.
- Built
- 2003
- Last inspected
- 10 March 2025
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 14 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9271925 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
5LPC5
786564
Flag
LIBERIA
—
Maury page id
psix-786564
Inspections, by type
…with no type recorded8
Years with a record
15 calendar years (2005–2025)
The 32 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it38547 - Displacement, Metric Ton
24167 - Convention (Subpart B), Gross Ton
30435 - Dead Weight, Metric Ton
10714 - Convention (Subpart B), Net Ton
24167 - Convention (Subpart B), Gross Ton
30435 - Dead Weight, Metric Ton
10714 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 32
10 March 2025
PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8090875
21 February 2025
PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8082455
6 October 2023
PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7804438
29 March 2023
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7659252
24 March 2023
PSC B · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7656163
23 March 2023
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7668013
26 September 2022
PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7566074
26 April 2021
PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7183014
8 May 2019
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6679624
15 April 2019
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6662978
9 August 2018
In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6505712
28 February 2018
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6363056
1 May 2017
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6136262
20 August 2016
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5978063
11 August 2016
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5962562
10 August 2016
Type not recorded
No type recorded · Station Port Aransas · USCG Heartland District (CGD-H) · Activity 5968761
16 February 2016
Administrative Inspection · Ballast Water Examination · ISPS III Exam · NPV Safety Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5815646
3 October 2014
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4998474
19 July 2012
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4383694
1 May 2009
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3464676
20 August 2008
Ballast Water Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3304189
12 March 2008
MARPOL Annex I Examination · Ballast Water Examination · MARPOL Annex V Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 3161805
6 November 2007
Type not recorded
No type recorded · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 3100854
4 July 2007
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2982608
4 July 2007
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2983038
3 July 2007
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2984208
21 February 2007
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2872848
22 June 2006
Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2687690
22 June 2006
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2688189
8 June 2006
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2676269
5 September 2005
ISPS II Exam · MARPOL Annex V Examination · PII Safety Exam · Ballast Water Examination · MARPOL Annex I Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2483702
5 September 2005
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2484398
Deficiency record · 14
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 21 February 2025
Resolved
Each emergency generating set arranged to be automatically started shall be equipped with starting devices approved by the administration with a stored capability of at least three consecutive starts.
PSCO observed emergency generator unable to start from its primary means after three consecutive starts. Starter of primary means were inoperable. Secondary starter; manual hydraulic means operable.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 September 2022
Resolved
SUFFICIENT POWER FOR GOING ASTERN SHALL BE PROVIDED TO SECURE PROPER CONTROL OF THE SHIP IN ALL NORMAL CIRCUMSTANCES.
PSCO OBSERVED CREW TROUBLESHOOTING MEANS OF GOING ASTERN AFTER LOSS OF ASTERN PROPULSION WHILE UNDERWAY.
74SOLAS(04)II-1/28.1
Lifesaving › Lifeboat › Propulsion Engine
Issued 20 August 2016
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use.
The life boat engine is currently inoperable, and therefore not ready for immediate use. Vessel will need to repair the engine or provide flag state dispensation.
Fire Fighting › Fixed Fire Detection System › Control Panel
Issued 16 February 2016
Resolved
Fire control panel on the bridge was disconnected, unable to relay fire or smoke detection alarms to the bridge. In the fire control room, fire control panel was in default and disabled. Multiple smoke detectors/manual call points tested throughout with negative results. In the condition found, fire and smoke detection alarms would not alert crew as designed.
Solas 2014 II-2/7.2.2
30abc
0715
Personnel › Training › Familiarization Training
Issued 16 February 2016
Resolved
Crew disconnected the fire control panel making it inoperative. Crew did not follow manufacturer's instructions for fault isolation that were posted next to control panels.
Solas 2014 XI-1/4.1
30abc
2510
Lifesaving › Lifeboat › Propulsion Starting System
Issued 16 February 2016
Resolved
Crew was not able to start the life boat for over two hours. The lifeboat was not ready for immediate operational use in its condition found by the [name withheld] 2014 III/20.2
30abc
0610
Fire Fighting › Combustible Materials › Insulation
Issued 16 February 2016
Resolved
Means shall be provided to control leaks of flammable liquids. A fuel leak was found on the HFO settling tank delivery valve in the purifier room. Additionally, lagging was found saturated with fuel oil under the HFO service tank and the generator fuel return line, posing a fire hazard to the vessel.
Solas 2014 II-2/4.1.1
17ac
0999
Electrical › Electric Generation Source (service) › Ground Detection
Issued 16 February 2016
Resolved
PSCO observed the anti-fouling systems grounding wire disconnected, a grounding wire was cut on the oily water separator electrical panel, and an emergency light fixture was zip tied to a broken bracket in way of the life boat embarkation area, posing an electrical hazard to the ship's crew.
Solas 2004 II-1/40.1.3
17ac
0950
Engineering › Steam System (main) › Piping
Issued 16 February 2016
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulation to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Steam was found leaking from the steam supply for the fuel oil overflow.
Solas 2014 I/11(a)
50ac
0999
Fire Fighting › Fixed Fire Detection System › Heat Detectors
Issued 16 February 2016
Resolved
2035 - General arrangement plans shall be permanently exhibited for the guidance of the ships officers showing clearly for each deck particulars of the fire detection and fire alarms systems. PSCO observed several installations of flame detection installed but not listed on the ships current fire control plan. 74 SOLAS 2014
II-2 / 15.2.4.1
Fire Fighting › Miscellaneous Items › Waste Receptacles
Issued 16 February 2016
Resolved
0899 - The purpose of this regulation is to limit the fire growth potential in every space of the ship. For this purpose, the following functional requirements shall be met; the use of combustible materials shall be restricted. PSCO observed a waste drum with waste oil and oil soaked rags being stored in the CO2 room. 74 SOLAS 2014
II-2 / 5.1.3
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 16 February 2016
Resolved
An efficiently fore and aft permanent gangway sufficient strength shall be fitted. Several cracks were observed on the vertical stanchions on the port side gangway.
ICLL 1966
Annex I Reg 26(2)
50ac
0956
Engineering › Diesel Engine (propulsion-direct drive) › Injector (fuel injection)
Issued 4 July 2007
Resolved
Main Engine No. 3 Injection Control Unit was found to be malfuntioning.
Operations/Management › Ballast Water Managment › Submission of Report
Issued 22 June 2006
Resolved
Vessel failed to submit a Ballast water reporting form for it's voyage to the Port of New York and has failed to implement it's ballast water management plan.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.