Records from 2016 to 2024. Most recent: inspection, 26 December 2024.
Inspection history · 12
26 December 2024
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 8051041
19 December 2024
Deficiency Check
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 8049299
15 December 2024
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 8047581
25 March 2024
Deficiency Check · PSC B
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7882372
29 January 2021
PSC B · Ballast Water Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7131252
6 August 2020
PSC B
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7019959
22 May 2019
Administrative Inspection
Administrative · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6690808
8 May 2019
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6679378
2 May 2018
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6397190
7 May 2017
Deficiency Check · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6140848
16 March 2017
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6105507
15 March 2016
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 5831421
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 25 March 2024
Resolved
EVERY INFATABLE LIFERAFT SHALL BE SERVICED AT INTERVIALS NOT EXCEEDING 12 MONTHS, PROVIDED WHERE IN ANY CASE THIS IS IMPRACTIBLE, THE ADMINISTRATION MAY EXTEND THIS PERIOD TO 17 MONTHS. [name withheld] ARE UNSERVICED PAST THE 12 MONTH INSPECTION DATE(21MAR2024) WITH NO EXTENSION FROM ADMINISTRATION. 74 SOLAS(20) CH III REG 20.8.1.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 March 2024
Resolution: RECIEVED LETTER OF DISPENSATION FROM FLAG.
10 - Safety of Navigation › N/A - No Subsystem › Bridge Navigation Watch Alarm System (BNWAS)
Issued 25 March 2024
Resolved
ALL SHIPS OF 150 GT AND UPWARDS SHALL BE FITTED WITH THE BRIDGE NAVIGATIONAL WATCH ALARM SYSTEM (BNWAS) SHALL BE IN OPERATION WHENEVER THE SHIP IS UNDERWAY AT SEE. PSCO OBSERVED INOPERABLE BNWAS. 74 SOLAS (20) CH V REG 19.2.2.3
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 March 2024
Resolution: RECIEVED CLASS REPORT
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 25 March 2024
Resolved
THE COMPANY AND THE SHIP SHALL COMPLY WITH THE REQUIREMENTS OF THE ISM CODE. THE COMPANY IS RESPONSIBLE FOR ENSURING THAT ADEQUATE RESOURCES AND SHORE BASED SUPPORT ARE PROVIDED. PSCO WAS PROVIDED WITH EMAIL COMMUNICATIONS BETWEEN THE VESSEL AND COMPANY ON 18MAR2024 REQUESTING SERVICE FOR BNWAS AND LIFERAFT. VESSEL HAS NOT RECIEVED INSTRUCTION, ARRANGEMENTS FOR SERVICE OR DISPENSATION. REQUIRED ISM AUDIT. 74 SOLAS (20) CH IX REG 3.1/ ISM-CODE 3.3
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 19 December 2024
Resolution: RECIEVED ISM AUDIT FROM CLASS NKK
Electrical › Lighting (service) › Outlet Box
Issued 16 March 2017
Resolved
Electrical installation shall be such that safety of crew and ship from electrical hazard that will be ensured. PSCO observed loose wirring in the overhead lights throughout the engine room. Mounting bracket for the electrical connection were cracked or missing.
50ac
SOLAS 74(2004 Cons) II/I/40.1.3
Action required: 705 - Other - as specified
Due 15 April 2017
Resolved 7 May 2017
Resolution: New brackets fabricated on board using aluminum and installed on all overhead lights in question. The wirintg is now secured to these new brackets. Class has no objection to the usage of the newly fabricated brackets as they serve their intended purpose.