MAURY USCG vessel records Sign in
← All vessels

CLIPPER TOBAGO

CLIPPER TOBAGO is a tank ship. The Coast Guard has recorded 21 inspections since 2005, most recently in October 2010, along with 28 deficiencies — 1 with no resolution recorded — and 7 operational controls.

Records from 2005 to 2010. Most recent: inspection, 23 October 2010.

Built
Not recorded
Last inspected
23 October 2010
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9209001 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
790395
Flag
BAHAMAS, THE
—
Maury page id
psix-790395

Inspections, by type

…with no type recorded9
Years with a record 5 calendar years (2005–2010)
The 21 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 16 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it8834 - Dead Weight, Ton
2602 - Convention (Subpart B), Net Ton
2602 - Simplified, Net Ton
5483 - Convention (Subpart B), Gross Ton
5438 - Simplified, Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 21

23 October 2010 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3876090
8 March 2010 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3691572
3 February 2010 ISPS II Exam · COC-CHEM Renew · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3674555
3 February 2010 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3674972
1 April 2008 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3175331
27 March 2008 MARPOL Annex I Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3172186
13 February 2008 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3146766
17 December 2007 Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3121395
12 October 2007 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3078347
7 October 2007 PI Safety Exam · Deficiency Check · ISPS II Exam · COC-CHEM Renew
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3073021
19 May 2007 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2934481
18 May 2007 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2934181
18 May 2007 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2952441
6 May 2007 ISM Exam · MARPOL Annex I Examination · ISPS II Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2923574
10 October 2006 Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2797598
22 September 2006 COC-CHEM Annual · ISPS III Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2784401
8 September 2006 ISPS II Exam · NPV Safety Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2772751
20 June 2006 Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2685959
7 January 2006 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2562737
24 November 2005 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2540415
21 September 2005 COC-CHEM Renew · ISPS II Exam
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2498121

Deficiency record · 28

Engineering › Diesel Engine (propulsion-direct drive) › Cylinder
Issued 1 April 2008 Resolved
#1 cylinder fuel pump not providing adequate pressure to injector
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 April 2008
Resolution: Sector Houston recvd class attestation to proper repairs and operation of ME
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 27 March 2008 Resolved
make permanent repairs and provide properly operating OWSsystem including oil content meter & alarm. Provide class or Flag surveyor report to Coast Guard. 70a/b (Vessel may proceed to NPOC - Houston)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 8 April 2008
Resolution: Recvd class report attesting to proper repairs and ops of OWS
Pollution Prevention/Response › Prevention Equipment › Oily Residue (sludge/slop) Tank
Issued 27 March 2008 Resolved
PRIOR TO DEPARTURE: Offload oily waste mixtures from bilge holding tank and sludge tank to approved reception facility. Current bilge holding tank content level is 10.4 cu. mtrs. make receipt of service available to Coast Guard. 17c
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 March 2008
Resolution: Pumped to shore reception (mobile) facility: AquaClean. Receipt for service on file at RIO Ponce.
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 27 March 2008 Resolved
Make permanent repairs and provide properly operating ODME system. Provide class or Flag surveyor report to Coast Guard. 70 a/b.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 8 April 2008
Resolution: Recvd class report attesting to proper repairs and ops of ODME
Construction/Loadline › Structures › Transverse Bulkhead
Issued 8 October 2007 Resolved
Transverse corrugated bulkhead fractured at tanktop, outboard most corrugation in way of cargo oil tanks no. 5 & 6. Correct to satisfaction of class and USCG Marine Inspector.
Condition: Unknown
Action required: 705 - Other - as specified
Due 15 October 2007
Resolved 12 October 2007
Resolution: Received ABS classification survey report attesting to satisfactory repairs.
Operations/Management › Vessel Safety Management › Company Responsibilities/Authority
Issued 7 October 2007 No resolution recorded
Failure to report major non-conformity to classification society. Vessel reported crack between cargo tanks 5S and 6S to operating operating company on September 22, 2007 prior to loading cargo. Operating company did not report non-conformity to classification society (ABS) until September 26, 2007, after cargo was discharged. Correct to the satisfaction of the administration.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolution: Flag and Lloyd''s (RO) issued letters acknowledging issue.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Manifold
Issued 7 October 2007 Resolved
Port center vapor manifold missing pin.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 7 October 2007
Resolution: Pin replaced during examination.
Fire Fighting › Automatic Sprinkler System › Sprinklers
Issued 7 October 2007 Resolved
Sprinkler system for deck system, discharge heads blocked.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 7 October 2007
Resolution: Corrected during exam.
Pollution Prevention/Response › Response Equipment › Sorbents
Issued 7 October 2007 Resolved
SMPEP inventory incomplete. 10 Boiler suits from box 1 and 300 sorbent pads from box 2 missing.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 7 October 2007
Resolution: COrrected during exam.
Lifesaving › Lifeboat Equipment › Oar
Issued 7 October 2007 Resolved
Conflicting vesel name on lifeboat oars.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 8 October 2007
Resolution: Vessel restenciled oars.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 7 October 2007 Resolved
Oily water separator's oil content meter was found not functioning in accordance with operating manual. Correct to the satisfaction of class and attending USCG Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 October 2007
Resolution: Vessel repaired OWS. Ran successfully to satisfaction of class and attending USCG Inspectors. Class issued requirement for technician to attend at next port.
Pollution Prevention/Response › Prevention Equipment › Incinerator, Shipboard
Issued 7 October 2007 Resolved
Incinerator found to be inoperable due to damaged nozzle. Correct to satisfaction of attending class and USCG Marine Inspector.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 October 2007
Resolution: Vessel repaired nozzle to satisfaction of class and attending USCG Inspectors.
Personnel › Certificates/Documents/Licenses › License, Chief Engineer
Issued 7 October 2007 Resolved
Original flag state endorsement for chief engineer's license not present on vessel.
Condition: Unknown
Action required: 705 - Other - as specified
Due 15 October 2007
Resolved 12 October 2007
Resolution: Original flag state endorsement is onboard.
Engineering › Diesel Engine (auxiliary) › Blower, Centrifugal
Issued 19 May 2007 Resolved
Vessel experienced a power irregularity.
Action required: 705 - Other - as specified
Due 19 May 2007
Resolved 19 May 2007
Resolution: Received class report/Tech report/proper documentation from ABS satisfying requirement.
Engineering › Bilge Water Management System › Piping
Issued 6 May 2007 Resolved
Vessel installed new OWS system during last dry dock 06Apr07. New piping is connected to sewage discharge pump. enabling vessel to take suction of the dirty oil tank with the sewage discharge pump. To the satisfaction of attending classification society surveyor.
Action required: 17 - Rectify deficiencies prior to departure
Due 8 May 2007
Resolved 9 May 2007
Resolution: Vessel removed piping and crew was interviewed by MSU & CGI.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 6 May 2007 Resolved
Vapor control lines on the vessel are not in accordance with 46 CFR 39.20-1
Action required: 705 - Other - as specified
Due 5 June 2007
Resolved 9 May 2007
Resolution: Crew painted piping nad labled correctly.
Documentation › Logs/Records › Cargo Record Book (NLS)
Issued 6 May 2007 Resolved
During review of vessel's cargo record book, it was determined that vessel is not complying with new MARPOL annex II regulations. Vessel is listing cargoes as A, B, C, D instead of X, Y, Z cargoes. Master was trained by Coast Guard on the new requirements for Annex II cargoes.
Action required: 705 - Other - as specified
Due 6 May 2007
Resolved 6 May 2007
Resolution: Informed Master and Chief Mate on recording new cargo designations in NLS cargo record book.
Pollution Prevention/Response › Prevention Equipment › Oily Residue (sludge/slop) Tank
Issued 6 May 2007 Resolved
Bilges in engine room had excessive amounts of oil, causing a potential fire hazard. Vessel must remove all oil from bilges. To satisfaction of attending classification society surveyor.
Action required: 17 - Rectify deficiencies prior to departure
Due 8 May 2007
Resolved 9 May 2007
Resolution: Company had bilges cleaned/high pressure washed and pumped to an enviromental company ashore.
Documentation › Certificates/Documents › IOPP Certificate
Issued 6 May 2007 Resolved
Vessel does not have IOPP certificate on board. Vessel must provide valid IOPP certificate prior to departing the Port of Savannah. To the satisfaction of attending classification society surveyor.
Action required: 17 - Rectify deficiencies prior to departure
Due 8 May 2007
Resolved 9 May 2007
Resolution: Class issued new IOPP after ODME was repaired.
Engineering › Diesel Engine (auxiliary) › Valve
Issued 6 May 2007 Resolved
Cooling water supply line to the #2 generator has excessive water leaks. To the satisfaction of attending classification society surveyor.
Action required: 705 - Other - as specified
Due 5 June 2007
Resolved 9 May 2007
Resolution: repaired
Fire Fighting › Fire Main › Material
Issued 6 May 2007 Resolved
Water supply line for emergency fire pump running through the engine room is not properly insulated for fire protection. To the satisfaction of attending classification society surveyor.
Action required: 17 - Rectify deficiencies prior to departure
Due 8 May 2007
Resolved 9 May 2007
Resolution: Section of piping insulated.
Documentation › Safety Management System › Reports and Analysis Procedures
Issued 6 May 2007 Resolved
Deficiencies noted with vessel's Safety Management System. Appears to be a failure in ISM procedures. Vessel is required to have an external audit, prior to departure.
Action required: 705 - Other - as specified
Due 10 May 2007
Resolved 10 May 2007
Resolution: Vessel had ISM audit on 9 May07. 03 non-conformities dated from company in 2005 and documented again in 2006 where never dealt with. LLoyds surveyor concluded that this constituted a major non-conformity that would have to be addressed by Flag.
Construction/Loadline › Markings › Load Line Assigning Authority Mark
Issued 6 May 2007 Resolved
Vessel's loadline does not reflect what is on certificate.
Condition: Unknown
Action required: 705 - Other - as specified
Due 14 May 2007
Resolved 7 October 2007
Resolution: Observed loadline matches loadline certificate.
Documentation › Safety Management System › Conformity Maintenance Procedures
Issued 6 May 2007 Resolved
Vessel to provide the Captain of the Port, a copy of the completed ISM report and any Flag recomendations prior to sailing.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 9 May 2007
Resolved 10 May 2007
Resolution: Rcvd report from Flag/Class. Vessel authorized to sail to Tampa to complete internal ISM audit.
Documentation › Logs/Records › Oil Record Book
Issued 6 May 2007 Resolved
Vessel only has machinery space oil record book (part 1) and cargo (part 2) for December 2006 thru present. Required to have oil record books going back three years, prior to return to US.
Condition: Unknown
Action required: 705 - Other - as specified
Due 11 May 2007
Resolved 8 October 2007
Resolution: Vessel is unable to provide oil record books going back three years due to ownership change. Item deleted for CG records. [name withheld]
Operations/Management › Cargo Transfer/Lightering › Use of Vapor Control System
Issued 22 September 2006 Resolved
Pressure indication for vapor control system varies from cargo tank pressure readings. No calibration on record. System to be calibrated.
Action required: 705 - Other - as specified
Due 22 October 2006
Resolved 10 October 2006
Resolution: Vessel satisfactorily calibrated pressure indication indicators for vapor control system.
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 22 September 2006 Resolved
Shipboard procedures do not include checking if required vapor detection equipment is on board.
Action required: 705 - Other - as specified
Due 22 October 2006
Resolved 10 October 2006
Resolution: Vessel adequately provided procedures for checking vapor detection equipment.
Lifesaving › Launching Appliances › Davit
Issued 22 September 2006 Resolved
Limit switch for starboard side davit system for lifeboat is not working. Switch was tested while lifeboat was being recovered after abandon ship drill.
Action required: 15 - Rectify deficiencies by next port
Resolved 10 October 2006
Resolution: Vessel replaced inop limit switch with new.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.