Records from 2005 to 2007. Most recent: inspection, 6 December 2007.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Communications › Radio Communications › VHF Radiotelephone
Issued 18 May 2006
Resolved
Provide an FCC Small Passenger Vessel, Safety Radio Certificate per 46 CFR 80.59 (2) and bridge to bridge radio certificate.
Due 26 May 2006
Resolved 25 May 2006
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 May 2006
Resolved
Provide approved electrical plans for both the A/C and D/C systems and satifactorly address al comments.
Due 18 June 2006
Resolved 12 June 2006
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 7 February 2006
Resolved
Re-locate pressure activated switches outside the protected space per the manufacturer drawing and the installation manual. Prove proper operation of system when complete.
Action required: 705 - Other - as specified
Due 7 February 2006
Resolved 11 May 2006
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 2 February 2006
Resolved
Provide proper and approved plans for CO2 fire suppression system.
Due 2 February 2006
Resolved 8 May 2006
Documentation › Certificates/Documents › Certificate of Inspection
Issued 2 February 2006
Resolved
Provide approved plans as listed on plan submittal form.
Due 2 February 2006
Resolved 8 May 2006
Documentation › Certificates/Documents › Certificate of Inspection
Issued 2 February 2006
Resolved
Provide approved electrical plan for emergency lighting system for engine room and any other spaces served ( combination battery and DC -AC converter).
Action required: 705 - Other - as specified
Due 2 February 2006
Resolved 8 May 2006
Resolution: Converter was removed. Emergnecy lighting is battery only.
Personnel › Training › Familiarization Training
Issued 2 February 2006
Resolved
Perform drills in the presence of a Marine Inspector.
Action required: 705 - Other - as specified
Due 2 February 2006
Resolved 8 May 2006
Documentation › Certificates/Documents › Stability Letter
Issued 2 February 2006
Resolved
Provide a proper and approved stability letter.
Due 2 February 2006
Resolved 7 February 2006
Communications › Radio Communications › VHF Radiotelephone
Issued 2 February 2006
Resolved
Provide a FCC Small Passernger Vessel, Safety Radio certificate per 46 CFR 80.59 (2).
Action required: 705 - Other - as specified
Due 26 May 2006
Resolved 3 October 2006
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 2 February 2006
Resolved
Provide a copy of the service report on the CO2 system testing and repairs.
Due 2 February 2006
Resolved 7 February 2006
Fire Fighting › Fixed CO2 Fire Extinguishing System › Automatic Heat Detectors
Issued 1 February 2006
Resolved
Prove proper operation of CO2 heat activated dectectors.
Due 1 February 2006
Resolved 2 February 2006
Engineering › Diesel Engine (propulsion-reduction gear) › Air Cleaner
Issued 9 January 2006
Resolved
Install engine room ventilation system in accordance with approved plan or edit plan and resubmit for approval.
Action required: 705 - Other - as specified
Resolved 8 May 2006
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 January 2006
Resolved
Re-submit electrical plans for approval showing the as built condition of vessel ( Pilot House relocated).
Action required: 705 - Other - as specified
Resolved 8 May 2006
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 9 January 2006
Resolved
Re-locate mast head light or side lights to show mast head light forward of side lights per Navigation rules Annex 1 para 3 (b).
Action required: 705 - Other - as specified
Resolved 21 March 2006
Communications › Internal Communications System › Engine Order Telegraph System
Issued 9 January 2006
Resolved
Prove Micro Commander engine controls meet the requirements of 46 CFR 62 refenced by 46 CFR 121.620 (d). (operation, indicators, remote and local control, communication).
Action required: 705 - Other - as specified
Resolved 8 March 2006
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 9 January 2006
Resolved
Perform an underway sea trail of the vessel in the presents of a Marine Inspector to verify handling charatristics, bridge visibility, and systems function.
Action required: 705 - Other - as specified
Resolved 8 May 2006
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 January 2006
Resolved
Provide approved electrical plans for both the A/C and D/C systems and satisfactorly address all comments.
Action required: 705 - Other - as specified
Due 17 June 2006
Resolved 3 October 2006
Operations/Management › Drills/Instruction › Not Conducted
Issued 2 December 2005
Resolved
Provide onboard the required station bill. (46 CFR 122.514)
Action required: 705 - Other - as specified
Resolved 2 February 2006
Operations/Management › Drills/Instruction › Not Conducted
Issued 2 December 2005
Resolved
Provide onboard the Passenger Safety Bill. (46 CFR 122.515)
Action required: 705 - Other - as specified
Resolved 2 February 2006
Resolution: Not applicable, not more than 49 overnight.
Operations/Management › Pollution › Removal Methods/Procedures
Issued 2 December 2005
Resolved
Provide onboard waste management plan / instructions. (33 CFR 151.57)
Action required: 705 - Other - as specified
Resolved 9 January 2006
Operations/Management › Drills/Instruction › Not Conducted
Issued 2 December 2005
Resolved
Provide onboard the emergency instruction list. (46 CFR 122.510)
Action required: 705 - Other - as specified
Resolved 9 January 2006
Navigation › Piloting/Steering › Marine Charts
Issued 2 December 2005
Resolved
Provide onboard the required navigation publications. (46 CFR 121.420)
Action required: 705 - Other - as specified
Resolved 2 February 2006
Communications › Internal Communications System › Sound-powered Telephone
Issued 2 December 2005
Resolved
Conduct an operational test of the internal communications system. (46 CFR 121.602)
Action required: 705 - Other - as specified
Resolved 21 March 2006
Communications › Radio Communications › VHF Radiotelephone
Issued 2 December 2005
Resolved
Provide the emergency broadcast placard. (46 CFR 121.506)
Action required: 705 - Other - as specified
Resolved 9 January 2006
Operations/Management › Passenger Operations › Safety Orientation
Issued 2 December 2005
Resolved
Conduct an operational test of the public address system. (46 CFR 121.610)
Action required: 705 - Other - as specified
Resolved 9 January 2006
Stability › Intact Righting Energy › General
Issued 2 December 2005
Resolved
Mark the upper decks capacity per the stability letter. (46 CFR 122.602(g))
Action required: 705 - Other - as specified
Resolved 8 May 2006
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 2 December 2005
Resolved
Provide onboard the lifejacket donning placard. (46 CFR 122.516)
Action required: 705 - Other - as specified
Resolved 9 January 2006
Lifesaving › Lifebuoys › Quantity
Issued 2 December 2005
Resolved
Outfit the vessel with the required number and properly equipped ring life buoys. (46 CFR 117.70)
Action required: 705 - Other - as specified
Resolved 2 February 2006
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 2 December 2005
Resolved
Provide proper stowage for the lifejackets. (46 CFR 117.78)
Action required: 705 - Other - as specified
Resolved 2 February 2006
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 2 December 2005
Resolved
Provide onboard a first aid kit. (46 CFR 121.710)
Action required: 705 - Other - as specified
Resolved 2 February 2006
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 2 December 2005
Resolved
Submit for approval to the cognizant Officer in Charge, Marine Inspection (Miami) the fire control plan and post same.
(46 CFR 116.530)
Action required: 705 - Other - as specified
Resolved 2 February 2006
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 2 December 2005
Resolved
Conduct an operational installation test of the fire and smoke detection system after submission of the system plans.
(46 CFR 118.400(e)
Action required: 705 - Other - as specified
Resolved 2 February 2006
Fire Fighting › Fire Hoses › Connections
Issued 2 December 2005
Resolved
Provide for each fire hose station a suitable spanner wrench. (46 CFR 118.320)
Action required: 705 - Other - as specified
Resolved 9 January 2006
Resolution: Spanners onoboard, but not required, less than 600 pax, less than 49 overnight
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 2 December 2005
Resolved
Conduct an operational test of the wet exhaust system for the internal combustion engines loss of cooling water alarm. (46 CFR 119.425)
Action required: 705 - Other - as specified
Resolved 8 May 2006
Engineering › Bilge Water Management System › Piping
Issued 2 December 2005
Resolved
Conduct an operational test of the bilbe high level alarms. (46 CFR 119.530)
Action required: 705 - Other - as specified
Resolved 9 January 2006
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 2 December 2005
Resolved
Provide onboard portable lighting required by 46 CFR 120.430.
Action required: 705 - Other - as specified
Due 9 January 2006
Resolved 9 January 2006
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 2 December 2005
Resolved
Install automatic electric emergency lighting in way of the inclined stair to the aft staterooms and engine room. (46 CFR 120.432)
Action required: 705 - Other - as specified
Resolved 9 January 2006
Fire Fighting › Fixed Fire Detection System › Manually Operated Call Points
Issued 2 December 2005
Resolved
Conduct an operational test of all "FIRE" pull boxes.
Action required: 705 - Other - as specified
Resolved 1 February 2006
Documentation › Markings/Placards › Oil Discharge Placard
Issued 2 December 2005
Resolved
Post the pollution placard required by 33 CFR 155.450.
Action required: 705 - Other - as specified
Resolved 9 January 2006
Documentation › Markings/Placards › Garbage Placard
Issued 2 December 2005
Resolved
Post the MARPOL V placard required by 33 CFR 151.59.
Action required: 705 - Other - as specified
Resolved 9 January 2006
Electrical › Electric Supply System (service) › Cable
Issued 2 December 2005
Resolved
Pour / seal the deck MCT in the Pilot house, starboard side.
Action required: 705 - Other - as specified
Resolved 9 January 2006
Electrical › Electrical Distribution System (service) › Cable
Issued 2 December 2005
Resolved
In the pilot house properly band all electrical cables. (46 CFR 120.340(b)).
Action required: 705 - Other - as specified
Resolved 9 January 2006
Fire Fighting › Structural - Main Vertical Zones › General
Issued 2 December 2005
Resolved
Conduct an operational test of the fire screen door automatic hold back release and ensure proper closure of all fire screen doors.
Action required: 705 - Other - as specified
Resolved 9 January 2006
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 2 December 2005
Resolved
Conduct a weight test and operational test of all safety devices for the elevator.
Action required: 705 - Other - as specified
Resolved 2 February 2006
Electrical › Lighting (service) › Conductor
Issued 2 December 2005
Resolved
Properly band the electrical cable for the nav. lights on the upper deck.
Action required: 705 - Other - as specified
Resolved 9 January 2006
Electrical › Electrical Distribution System (service) › Cable
Issued 2 December 2005
Resolved
Properly band the electrical cables in all spud rooms / closets.
Action required: 705 - Other - as specified
Resolved 9 January 2006
Electrical › Electric Supply System (service) › Cable
Issued 2 December 2005
Resolved
Properly band the electrical cables behind the washer and dryer in the galley.
Action required: 705 - Other - as specified
Resolved 9 January 2006
Electrical › Electric Supply System (service) › Cable
Issued 2 December 2005
Resolved
Properly seal the electrical deck penetrations behind the washer and dryer in the galley.
Action required: 705 - Other - as specified
Resolved 9 January 2006
Electrical › Electrical Distribution System (service) › Junction Box
Issued 2 December 2005
Resolved
Provide the proper cover for the "wet" receptical box in the bow thruster room.
Action required: 705 - Other - as specified
Resolved 9 January 2006
Electrical › Electric Supply System (service) › Cable
Issued 2 December 2005
Resolved
Properly band the electrical cables in the bow thruster room.
Action required: 705 - Other - as specified
Resolved 21 March 2006
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 2 December 2005
Resolved
Install floor plates in the bow thruster room.
Action required: 705 - Other - as specified
Resolved 9 January 2006
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 2 December 2005
Resolved
Make properly operable the emergency light installed in way of the forward, below main deck storerooms.
Action required: 705 - Other - as specified
Resolved 2 February 2006
Electrical › Electric Supply System (service) › Cable
Issued 2 December 2005
Resolved
Properly band the electrical cables in the forward below main deck storerooms.
Action required: 705 - Other - as specified
Resolved 2 February 2006
Stability › Watertight Integrity › General
Issued 2 December 2005
Resolved
Install mounting brackets for the remote operation hand held levers for the sliding watertight door.
Action required: 705 - Other - as specified
Resolved 2 February 2006
Fire Fighting › Fire Pumps › Pressure
Issued 2 December 2005
Resolved
Install a suitable discharge pressure gauge for the fire pump.
Action required: 705 - Other - as specified
Resolved 9 January 2006
Electrical › Lighting (emergency) › Lighting Fixture
Issued 2 December 2005
Resolved
Mark the emergency lights installed in the engine room.
Action required: 705 - Other - as specified
Resolved 9 January 2006
Electrical › Electric Supply System (service) › Cable
Issued 2 December 2005
Resolved
Properly band all electrical cables in the engine room
Action required: 705 - Other - as specified
Resolved 2 February 2006
Documentation › Markings/Placards › Warning Signs
Issued 2 December 2005
Resolved
Provide all required markings in accordance with 46 CFR 122.602 through 122.614.
Action required: 705 - Other - as specified
Resolved 2 February 2006
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Number
Issued 2 December 2005
Resolved
Provide on board and properly mount the following hand portable fire extinguishers: Main Deck Aft - AII; 02 Deck Aft - AII;
Engine Room, Port Side - BII; Forward Store Rooms (outside space) - AII. (46 CFR 118.500(a))
Action required: 705 - Other - as specified
Resolved 2 February 2006