Records from 2005 to 2009. Most recent: inspection, 26 February 2009.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 7
26 February 2009
In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3424638
17 February 2009
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3418984
6 February 2009
ISPS II Exam · PII Safety Exam · COC-CHEM Renew · Ballast Water Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3413261
11 November 2005
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2532958
4 November 2005
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2534528
2 November 2005
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2526819
2 November 2005
ISPS II Exam · COC-CVE Initial
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2527708
Engineering › Sea-water System (primary cooling) › Piping
Issued 6 February 2009
Resolved
Raw water cooling delivery piping on generator #1 is wasted at flex-coupling due to leaks. Make permanent repairs no later than 13 FEB 09 to the satisfaction of class/RO/RSO. 04 SOLAS (Ammend) II-1/41.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 February 2009
Resolved 17 February 2009
Resolution: BV Declares That They Surveyed The Ship And Found The Deficiency Corrected
Engineering › Sea-water System (primary cooling) › Piping
Issued 6 February 2009
Resolved
Raw water cooling delivery and return lines (Piping) on generator #3 are wasted due to leaks at flex coupling. Make permanent repairs to the satisfaction of class/RO/RSO no later than 13 FEB 2009. 04 SOLAS (Amend) II-1/41.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 February 2009
Resolved 17 February 2009
Resolution: BV Declares That They Surveyed The Ship And Found The Deficiency Corrected
Fire Fighting › Means of Escape › Doorways
Issued 6 February 2009
Resolved
Self closing door at emergency fire escape trunk in lowest level of engine room sticks open, make proper repairs to ensure door is able to self close. No later than 13 FEB 2009 to the satisfaction of Class/RO/RSO.
Condition: Unknown
Action required: 705 - Other - as specified
Due 13 February 2009
Resolved 17 February 2009
Resolution: BV Declares That They Surveyed The Ship And Found The Deficiency Corrected
Fire Fighting › Fixed Fire Detection System › Alarms
Issued 6 February 2009
Resolved
When fire alarm in engine room is activated both the fire and CO2 lights on the signal panel in the space illuminate, separate alarm indicators to reflect appropriate alarms no later than 05 MAR 2009 to satisfaction of Class/RO/RSO. 04 SOLAS II-1/7.4.2
Action required: 705 - Other - as specified
Due 5 March 2009
Resolved 17 February 2009
Resolution: BV Declares That They Surveyed The Ship And Found The Deficiency Corrected
Pollution Prevention/Response › Response Equipment › Protective Clothing
Issued 6 February 2009
Resolved
Vessel is required to have 04 chemical safety suits onboard. Vessel currently has 03 chemical safety suits onboard. Provide 01 additional chemical suit onboard vessel no later than 20 FEB 2009 to satisfaction of Class/RO/RSO. 04 SOLAS II-2/19
Action required: 705 - Other - as specified
Due 20 February 2009
Resolved 17 February 2009
Resolution: Received Class report stating deficiency cleared.
Fire Fighting › Fixed Fire Detection System › Control Panel
Issued 6 February 2009
Resolved
Gas sampling panel in cargo control room is showing a "flow error" for all tanks sampled. Make proper repairs to cargo sampling system no later than 05 MAR 2009 to Class/RO/RSO. Prior to completion of repairs conduct ballast tank sampling LEL levels prior to and following all loading and unloading cargo operations using vessels portable gas detectors. 04 SOLAS
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 March 2009
Resolved 27 February 2009
Resolution: Received fax from Class stating that the gas sampling panel has been repaired and satisfactorily tested.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 6 February 2009
No resolution recorded
Hand rails on deck at port side forward and on starboard forward are broken. Make the permanent arrangement to fix it no later than APR 2009 to the satisfaction of Class/RO/RSO.
Requirement due date extended until vessel drydock in JAN 2010.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 January 2010 — due date passed with no resolution recorded
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 6 February 2009
Resolved
MSD is not properly placarded in accordance with 33 CFR 159.7. Device should be properly placard by 20 FEB 2009 to the satisfaction of Class/RO/RSO.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 20 February 2009
Resolved 17 February 2009
Resolution: ABS quality assessment certificate received VIA E-MAIL attesting to system approval.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 2 November 2005
Resolved
OWS oil content meter needs new dessicator and needs to be calibrated. Vessel to have oily waste retained onboard or sent to reception facility. Rectify to Class.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 11 November 2005
Resolution: Received satisfactory class report.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 2 November 2005
Resolved
MSD has missing placard.
Action required: 705 - Other - as specified
Due 2 November 2005
Resolved 2 November 2005
Resolution: Vessel placed placard on MSD.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 2 November 2005
Resolved
#2P cargo pump is inoperable. Vessel may not load in #2P cargo tank until cargo pump and emergency stop is tested to satisfaction of Class.
Action required: 15 - Rectify deficiencies by next port
Resolved 11 November 2005
Resolution: Recieved satisfactory class report.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 2 November 2005
Resolved
Vessels fire control plan states that the bridge and separator room in E/R have gas tight doors. Both doors are not gas tight. Class must address this issue,
Action required: 15 - Rectify deficiencies by next port
Resolved 11 November 2005
Resolution: Recieved satisfactory class report.
Deck/Cargo › Vapor Control Systems › Remotely Operated Cargo Vapor Shutoff Valve
Issued 2 November 2005
Resolved
Vessel vapor piping flange at manifold is not approved by class and is missing stud. System is not to be used in U.S. waters until inspected by class.
Action required: 705 - Other - as specified
Due 2 December 2005
Resolved 2 February 2009
Resolution: AGENT FAXED TO SECTOR SAN JUAN PREVENTION DEPARTMENT A BV CERTIFICATION FOR THE VAPORS CONTROL SYSTEMS ON M/T YM VENUS
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Combustible Gas Indicator
Issued 2 November 2005
Resolved
Vessel to prove proper calibration and operation of fixed gas detection system to the satisfaction of class.
Action required: 15 - Rectify deficiencies by next port
Resolved 11 November 2005
Resolution: Received satisfactory class report.