MAURY USCG vessel records Sign in
← All vessels

XIN FENG

XIN FENG is a 2004 freight ship. The Coast Guard has recorded 18 inspections since 2005, most recently in October 2021, along with 5 deficiencies and 4 operational controls.

Records from 2005 to 2021. Most recent: inspection, 18 October 2021.

Built
2004
Last inspected
18 October 2021
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9286920 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
796654
Flag
LIBERIA
—
Maury page id
psix-796654

Inspections, by type

…with no type recorded5
Years with a record 10 calendar years (2005–2021)
The 18 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 5 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it75776 - Dead Weight, Ton
85576 - Displacement, Ton
38849 - Convention (Subpart B), Gross Ton
25164 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 18

18 October 2021 PSC B
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7334621
30 September 2021 Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7323693
31 March 2021 PSC B
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7155529
9 November 2020 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7092241
6 May 2020 PSC B
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6946785
29 January 2018 ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6342763
20 April 2017 Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6128914
2 December 2016 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6047252
20 August 2015 PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5209012
21 May 2012 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4303327
1 August 2011 Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4105994
26 July 2011 Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4096198
25 July 2011 Deficiency Check
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4094162
3 February 2011 Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3937020
16 June 2006 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 2681812
3 November 2005 Type not recorded
No type recorded · Station Little Creek · USCG East District (CGD-E) · Activity 2536058
2 November 2005 ISPS II Exam · PII Safety Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2527031
30 October 2005 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 2524720

Deficiency record · 5

Operations/Management › Vessel Safety Management › Company Responsibilities/Authority
Issued 2 December 2016 Resolved
The Company should establish procedures and instructions for shipboard operations concerning safety of personnel and the ship. PSCOs observed what appeared to be a low level of foam concentrate on the sight glass of the high expansion foam storage tank. The tank doesn't proved tank level indications for the amount of foam required in the tank.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 20 April 2017
Resolution: Recieved class report clearing ff foam def.
Engineering › Bilge Water Management System › Piping
Issued 20 August 2015 Resolved
74 SOLAS (2009 CONS.) CH. I Regulation 11(b) After any survey of the ship under regulations 7,8,9 or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment & other items covered by the survey without the sanction of the administration. PSC team found modification to #. 1/#. 2 Waste Oil Service Tank - piping was found to not be approved. 40 ac
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 28 August 2015
Resolution: Received satisfactory Class report (C1-215202793) from Nippon Kaiji Kyokai approving piping arrangement. Deficiency cleared.
Fire Fighting › Combustible Materials › Linings
Issued 20 August 2015 Resolved
74 SOLAS (2009 CONS.) CH. II-2 Reg. 4.1.1 Purpose of this regulation is to prevent the ignition of combustible materials of flammable liquids. For this purpose the following functional requirements shall be met: means shall be provided to control leaks of flammable liquids. PSC team observed #5 M/E fuel pump leaking at seal. C/E indicated it was due to faulty gasket. 10 c.
Action required: 705 - Other - as specified
Due 20 August 2015
Resolved 20 August 2015
Resolution: C/E replaced gasket, no further leaking occurred.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 3 February 2011 Resolved
0830 - Pipes - Each transfer pipe system including each metallic hose must not leak under static liquid pressure at least 1.5 times the MAWP. It was found that the ship's transfer piping system was tested using air as the medium. Provide documentation attesting that the transfer piping system was tested under static liquid pressure prior to bunkering in the U. S. - 33 CFR 156.170
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 February 2011
Resolved 25 July 2011
Resolution: Invalid deficiency as per chain of command (ACID).
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 3 February 2011 Resolved
0899 - Other - Transfer procedures must meet the requirements of 33 CFR 155.750. The ship's transfer procedures are not in accordance with 33 CFR 155.750. Rectify prior to bunkering in the U. S. - 33 CFR 155.750
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 February 2011
Resolved 28 July 2011
Resolution: Received copy of vessels transfer procedures that meet the requirements of 33 cfr 155.750.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.