MAURY USCG vessel records
← All vessels

CHALLENGE PASSAGE

CHALLENGE PASSAGE is a 2005 tank ship. The Coast Guard has recorded 18 inspections since 2018, most recently in September 2022, along with 11 deficiencies and 3 operational controls.

Records from 2018 to 2022. Most recent: inspection, 12 September 2022.

Built
2005
Last inspected
12 September 2022
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Identity

9310707
798051
Flag
PANAMA
Maury page id
psix-798051

This record may be incomplete: the most recent inspection recorded for this vessel was 4 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspections, by type

…with no type recorded2
Years with a record 5 calendar years (2018–2022)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. The counts in the strip above are the same counts; this table splits the inspections by the kind of activity recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Documentation record

Tonnage as PSIX records it13234 - Convention (Subpart B), Net Ton
58000 - Displacement, Metric Ton
48658 - Dead Weight, Metric Ton
28823 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

What it gives that this page does not: the whole record in one dated, citable document — every line with its Coast Guard activity id, the retrieval date on the cover, built to print to PDF with its page breaks — that a surveyor can attach and a lender can file. The same facts as this page, complete and in one file.

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

A request, not a checkout: leave an email and Maury replies once, with the dated document for this hull and a Stripe invoice for $299. Nothing is charged before the document is in your hands.

Inspection history · 18

12 September 2022 PSC B · COC-TVE Renew
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 7556126
3 September 2022 PSC B
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7548660
28 May 2022 Deficiency Check
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7460977
24 May 2022 PSC B
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7457201
11 January 2022 Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7378725
27 November 2021 COC-TVE Annual · PSC B · Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7357647
13 November 2021 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7350095
13 November 2021 Bulk Liquid Transfer Monitor
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7353398
10 November 2021 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7349008
20 August 2021 Administrative Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7292009
18 May 2021 Ballast Water Examination · PSC B · Administrative Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7200109
29 December 2020 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7117478
2 October 2020 Ballast Water Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7070306
1 October 2020 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7071715
10 September 2020 COC-TVE Renew · PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7055035
26 October 2019 Ballast Water Examination · ISPS II Exam · COC-TVE Annual
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6842150
17 September 2018 Deficiency Check · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6542601
4 September 2018 COC-TVE Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6531335

Deficiency record · 11

01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 3 September 2022 Resolved
Each operation described in paragraph 2 of this regulation shall be fully recorded without delay in the oil record book part 1. PSCO found an entry dated 04AUG2022 that stated the ows exceeded the maximum throughput of the system. After review of the ORB part 1, IOPP, Engineering and sounding logs, and OWS records, PSCO was able to determine the entry was improperly recorded in the ORB part 1.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 3 September 2022
Resolution: After review of the ORB part 1, IOPP, Engineering and sounding logs, and OWS records, PSCO was able to determine the entry was improperly recorded in the ORB part 1.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 24 May 2022 Resolved
Food rations shall be vacuum packed in a flexible packaging material. 20 10,000Kj food packages in the port side lifeboat and 16 10,000Kj food packages in the stbd side lifeboat had compromised vacuum packaging. Cite: LSA code 4.1.5.18 Action taken: 15a and c
Condition: Damaged By Earlier Event
Action required: 15 - Rectify deficiencies by next port
Due 27 May 2022
Resolved 28 May 2022
Resolution: Vessel added new rations to the lifeboats.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 24 May 2022 Resolved
All the steering gear components and the rudder stock shall be of a sound and reliable construction to the satisfaction of the administration. The crew has previously identified and requested parts for the #1 steering gear solenoid, which is leaking at a rate of one drop per second. Cite: 74SOLAS(04)II-1/29.2.1 Action taken:16 a and c
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 June 2022
Resolved 28 May 2022
Resolution: Vessel's crew replaced the #1 steering gear solenoid
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 May 2022 Resolved
Machinery, boilers, and other pressure vessels, associated piping systems, and fittings shall be of a design and construction adequate for the service for which they are intended. Starboard seawater pump that services the cargo oil pumps was found leaking water from the packing gland, creating a large collection of water below the pump. crew attemped to tighten packing, and overheated gland, to the point where steam was observed. PSCO is unable to verify adequate cooling can be provided to the cargo oil pumps, and the flow rate from leak from this pump. Vessel is able to provide adequate cooling to the condenser from two other pumps of adequate capacity. Cite: 74SOLAS(04)II-1/26.1 action taken: 16 a and c
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 June 2022
Resolved 28 May 2022
Resolution: Vessel's crew overhauled the pump and renewed packing glands.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 15 November 2021 Resolved
The means of embarkation and disembarkation required in paragraph 1 shall be constructed and installed based on the guidelines developed by the organization. Embarkation ladder is beyond safe limitations and exceeds design standards. 74SOLAS(20)II-1/3-9.2
Action required: 15 - Rectify deficiencies by next port
Due 15 November 2021
Resolved 27 November 2021
Resolution: Embarkation ladder was able to be accessed.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 25 May 2021 Resolved
To prevent the ignition of combustible materials of flammable liquids, means shall be provided to control leaks of flammable liquids. Oil was found leaking from valve one pipe coming from the Filter Drain Tank and fuel oil supply valve for #3 generator, overflowing makeshift collection containers, and draining down into the bilge.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 20 August 2021
Resolution: Action Taken: It was confirmed that the leakage valves were overhauled, maintenenced and renewed and confirmed there are no more leakage.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 May 2021 Resolved
After any survey of the ship has been completed, no change shall be made to equipment or other items covered by the survey, without the sanction of the administration. Engine control room air conditioner seawater discharge had makeshift flexible hose (designed for use in air systems) running to the inert gas scrubber seawater discharge.
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 20 August 2021
Resolution: Action Taken: It was confirmed that the flexible hose was replaced as steel pipe.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 10 September 2020 Resolved
Special Consideration shall be given to the design and locatin of scrubber and blowers with relevant piping and fittings in order to prevent flue gas leakages into enclosed spaces. Bearing seal on #2 inert gas blower was found to be leaking (i.e. not creating a gas tight seal).
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 11 September 2020
Resolution: PSC has received a satisfactory class report from [name withheld] attesting to the repair and successful operation of the number 2 inert gas system blower's leaking seal.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Reports of non-conf., accidents & hazardous occur.
Issued 26 October 2019 Resolved
The company and the ship shall comply with the requirements of the international safety management code. The company should establish procedures to ensure that the ship is maintained in conformity. Leak on the water supply to the scrubber was not reported to the Master and the ships company. 74 SOLAS (04) IX reg 3 ISM 10.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 26 October 2019
Resolved 29 October 2019
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 4 September 2018 Resolved
The inert gas system shall be designed, constructed and tested to the satisfaction of the administration. It shall be designed to be capable of rendering and maintaining the atmosphere of the relevant cargo tanks non-flammable. Span gas for IGS calibration is not certified. 74 SOLAS(04)II-2/4.5.5.3.2 FSS Code Ch. 15 2.2.1.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 4 September 2018
Resolved 6 September 2018
Resolution: Recieved class report. Correct span gas onboard and system properly calibrated.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil discharge monitoring and control system
Issued 4 September 2018 Resolved
The system shall be fitted with a recording device to provide a continuous record of the discharge in the liters per nautical mile and total quantity discharged of the oil content and rate of discharge. ODME is inoperable. MARPOL ANNEX I Reg 31.2
Action required: 17 - Rectify deficiencies prior to departure
Due 4 September 2018
Resolved 17 September 2018
Resolution: Deficiency rectified through sufficient class documentation.

Ownership record