Records from 2016 to 2019. Most recent: inspection, 19 August 2019.
Inspection history · 14
19 August 2019
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6788192
25 April 2019
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6670261
8 February 2019
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6622683
9 January 2019
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6607872
24 September 2018
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6570360
22 August 2018
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6519647
21 March 2018
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6388152
19 December 2017
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6326671
12 October 2017
Administrative Inspection · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6286215
6 July 2017
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6208242
6 July 2017
Administrative Inspection · Deficiency Check
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6208818
13 April 2017
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6129570
13 September 2016
Administrative Inspection · Hull Examination · COI Inspection · Internal Structural Exam
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5999951
23 February 2016
Administrative Inspection · Plan Review "T" Boat
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 5820385
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 21 February 2019
No resolution recorded
Demonstrate compliance with new Conditions of Operation listed on amended COI.
Action required: 17 - Rectify deficiencies prior to departure
Engineering › Bilge Water Management System › Piping
Issued 21 March 2018
No resolution recorded
Bilge piping and GPM rate is not in compliance with MSC Letter E1-0504811. Vessel to operate with 2 total hand bilge pumps and will require manning as appropriate. This is to be corrected by 2019 operating season.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 20 April 2018 — due date passed with no resolution recorded
Engineering › Shafting/Propeller Arrangements › Coupling Bolt
Issued 6 July 2017
Resolved
Identify source of loss of propulsion, make appropriate repairs, test propulsion and provide report to Coast Guard marine inspector prior to putting vessel back into passenger service.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 July 2017
Resolution: The lever on the prop engager was replaced with an upgraded version that has much stronger pins.
Electrical › Electrical Distribution System (service) › Wiring
Issued 12 October 2016
Resolved
Ensure proximity sensors are installed to the CG approved plans. Rear & both side sensors failed to deactivate when the prop is engaged.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 12 November 2016
Resolved 25 October 2016
Engineering › Lubricating Oil Service System › Piping
Issued 12 October 2016
Resolved
Determine cause & make repairs to fluid leak observed at the operating station.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 October 2016
Resolved 25 October 2016
Stability › Incline Test › General
Issued 12 October 2016
Resolved
Provide weigh ticket to demonstrate compliance with the vsl's approved stability letter.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 November 2016
Resolved 25 October 2016
Construction/Loadline › Structures › Deck Plating
Issued 12 October 2016
Resolved
Provide a list of plans to which SD-56 is constructed.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 12 November 2016
Resolved 25 October 2016