MAURY USCG vessel records Sign in
← All vessels

R/V TYNDALL POINTE

R/V TYNDALL POINTE is a 2006 passenger vessel (inspected). The Coast Guard has recorded 20 inspections since 2006, most recently in August 2025, along with 39 deficiencies and 2 casualty investigations between 2007 and 2011.

Records from 2006 to 2025. Most recent: inspection, 18 August 2025.

Built
2006
Last inspected
18 August 2025
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDN6131
800478
Flag
UNITED STATES
368296260
Maury page id
psix-800478

Inspections, by type

…with no type recorded1
Years with a record 13 calendar years (2006–2025)
The 20 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)35.7 ft × 14.0 ft × 6.0 ft
Registered tonnagegross 20 / net 16
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSEA HAWK INDUSTRIES INC · SEBRING, FL, UNITED STATES · built 2006
Hull materialFRP (Fiberglass)
PropulsionDiesel
Hull shapeShip
Hull configurationMonohull
Hailing portGLOUCESTER POINT, VA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 30 April 2026 · expires 31 May 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it20 - Simplified, Gross Ton
16 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDN6131MMSI 368296260 · active · compulsorily equipped · granted 10 February 2023, expires 10 February 2033 · licensed under a name not among this hull’s recorded names (not shown)
WDC8678MMSI 367091280 · expired · compulsorily equipped · granted 9 February 2016, cancelled 11 April 2026
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 20

18 August 2025 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8212600
8 July 2025 Drydock Exam · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8179328
18 July 2024 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7953112
20 July 2023 COI Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7744626
2 June 2021 Construction Oversight
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7249053
20 May 2021 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7202169
28 April 2017 In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6150073
1 August 2016 Deficiency Check · Administrative Inspection · DAPI Audit · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5959076
15 March 2016 Administrative Inspection · Internal Structural Exam · Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5833350
8 October 2015 Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5738229
30 October 2014 Annual Inspection · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5038330
13 March 2014 Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4833312
3 August 2011 COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4093561
17 March 2010 Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3700382
4 March 2008 Hull Examination · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3157978
20 June 2007 Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2966084
6 June 2007 Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2962426
31 May 2007 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2951512
6 July 2006 Initial Certification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2716791
2 June 2006 Simplified Stability Test · Construction Oversight
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2668292

Deficiency record · 39

11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 18 August 2025 Resolved
Each ring life buoy on a vessel must:(1) Be approved in accordance with § 160.050 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.150. Life ring Buoy grab line was deteriorated and had breaks in the line. 46 CFR 180.70 (b)
Action required: 705 - Other - as specified
Resolved 2 September 2025
Resolution: VSL replaced life buoy.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 18 August 2025 Resolved
Each item of survival craft equipment must be of good quality, and efficient for the purpose it is intended to serve. Lifeline and pendants: The lifeline and pendants must be as furnished by the manufacturer with the approved life float or buoyant apparatus. Replacement lifelines and pendants must meet the requirements in Subpart 160.010 of this chapter. Life float lifelines and pendants are deteriorated and not serviceable. 46 CFR 180.175 (a) & (f)
Action required: 705 - Other - as specified
Resolved 2 September 2025
Resolution: VSL replace life float grab lines
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 18 July 2024 Resolved
46 CFR 180.175(f)(4): The life float light must be a floating waterlight approved under approval series 161.010 or other standard specified by the Commandant. Waterlight did not have manufacture approved batteries installed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 August 2024
Resolved 1 August 2024
Resolution: Replaced batteries to be IAW manufacture instructions.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 18 July 2024 Resolved
46 CFR 180.70(d)(1): Each floating waterlight on a ring life buoy must be approved in accordance with § 161.010 in subchapter Q of this chapter. Waterlight did not have manufacture approved batteries installed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 August 2024
Resolved 1 August 2024
Resolution: Replaced batteries to be IAW manufacture instructions.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 20 July 2023 Resolved
The number and identification of the items stowed inside, and their sizes, must be marked in clearly legible letters and numbers on each container for life jackets and immersion suits. Vessel was missing appropriate marking of adult life jackets via stenciling.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 August 2023
Resolved 4 August 2023
Resolution: Vessel representative sent pictures as sufficient evidence of proper marking of adult life jacked stowage.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 20 July 2023 Resolved
The life float light must be a floating waterlight approved under approval series 161.010 or other standard specified by the Commandant. The floating waterlight must be attached around the body of the life float or buoyant apparatus by a 10 mm (3/8 inch) lanyard, resistant to deterioration from ultraviolet light, and at least 5.5 meters (18 feet) in length. Vessel was missing the waterlight and had the incorrect lanyard size for life float.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 August 2023
Resolved 19 September 2023
Resolution: MI verified presence and operation of waterlight for life float as well as the appropriate length and construction of lanyard.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 20 July 2023 Resolved
A vessel must carry one floating waterlight, unless it is limited to daytime operation, in which case no floating waterlight is required. It must be approved in accordance with § 161.010, have a lanyard of at least 910 millimeters (3 feet) in length, but not more than 1,830 millimeters (6 feet), securing the waterlight around the body of the ring life buoy, and must be attached to the lanyard with a corrosion-resistant clip. Vessel was missing a waterlight on the ring life buoy. Vessel limited to daytime operation only.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 August 2023
Resolved 19 September 2023
Resolution: MI verified presence and operation of waterlight for ring buoy as well as the appropriate length and construction of lanyard.
11 - Life Saving Appliances › N/A - No Subsystem › Radio life-saving appliances
Issued 20 July 2023 Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board an FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. Vessel was missing an EPIRB. Vessel limited to no more than 3NM from shore.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 August 2023
Resolved 19 September 2023
Resolution: Verified presence of EPIRB, mounted in a float free arrangent with approved hydrostatic release and NOAA registration.
04 - Emergency Systems › N/A - No Subsystem › Location of emergency installations
Issued 20 July 2023 Resolved
Remote fuel shutoff stations must be marked in clearly legible letters at least 25 millimeters (1 inch) high indicating purpose of the valve and direction of operation. Fuel shut off markings should be openly marked on the deck for easy visibility.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 August 2023
Resolved 19 September 2023
Resolution: Verified approved markings/instructions for emergency fuel shutoff.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 July 2023 Resolved
A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operating. Vessel was missing visual indicators for each automatic bilge pump.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 August 2023
Resolved 19 September 2023
Resolution: Verified the operation of the bilge pump indicator lights while bilge pumps were operational.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 20 July 2023 Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected. Vessel had 02 cableways between the machinery and accommodation spaces that must be sealed with fire retardant sealant.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 August 2023
Resolved 19 September 2023
Resolution: Verified cableways from fwd accom space to engine room were sealed using marine grade 3M sealant.
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 1 August 2016 Resolved
Provide updated charts for operating area.
Action required: 705 - Other - as specified
Due 15 August 2016
Resolved 20 September 2016
Resolution: Owner purchased Oceangraphix charts of appropriate area/scale.
Construction/Loadline › Structures › Door
Issued 1 August 2016 Resolved
Replace severed hatch drain on E/R after hatch.
Action required: 705 - Other - as specified
Due 15 August 2016
Resolved 20 September 2016
Resolution: Owner replaced flexible tubing on drain.
Engineering › Fuel Oil Service System › Piping
Issued 1 August 2016 Resolved
Add additional hose clamps on various piping systems on vessel (bilge, fuel).
Action required: 705 - Other - as specified
Due 15 August 2016
Resolved 20 September 2016
Resolution: Owner placed additional hose clamps on bilge system.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 1 August 2016 Resolved
Provide approved brackets for portable fire extinguishers.
Action required: 705 - Other - as specified
Due 15 August 2016
Resolved 20 September 2016
Resolution: Owner installed manufacturer approved fire extinguisher brackets on all fire extinguishers.
Communications › Radio Communications › Radiotelephone Transceiver (2-27.5 MHz)
Issued 1 August 2016 Resolved
Prove proper operation of single side band radio.
Action required: 705 - Other - as specified
Due 15 August 2016
Resolved 20 September 2016
Resolution: Single side band radio is operational.
Communications › Radio Communications › VHF Radiotelephone
Issued 1 August 2016 Resolved
Prove operation of DSC capability of VHF radio.
Action required: 705 - Other - as specified
Due 15 August 2016
Resolved 20 September 2016
Resolution: Saw owner program radio with MMSI number according to manufacturer instructions. GPS is also connected.
Stability › Unintentional Flooding › General
Issued 1 August 2016 Resolved
Install coamings on engine room downflooding points. Provide list of materials and layup procedure.
Action required: 705 - Other - as specified
Due 1 September 2016
Resolved 20 September 2016
Resolution: Completed all requirements; installed coamings along E/R natural vents.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 30 October 2014 Resolved
Replace/fix all around white mast head light. Restricted from operating in reduced visibility and nighttime.
Action required: 705 - Other - as specified
Resolved 3 April 2015
Resolution: Owner sent photo showing proper operation of white mast head light.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 30 October 2014 Resolved
Replace expired alcohol test strips restricted to no more than two hours from the dock.
Action required: 705 - Other - as specified
Resolved 3 April 2015
Resolution: Owner sent photo of (02) new alcohol test kits.
Engineering › Fuel Oil Service System › Vent Pipe
Issued 13 March 2014 Resolved
Repair fuel tank vent located starboard aft on vsl
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 March 2014
Resolved 26 March 2014
Resolution: Vent replaced. ALL SAT
Construction/Loadline › Hull › Hull Plating
Issued 13 March 2014 Resolved
1. Repair hole in hull located in forepeak. 2. Address chipping/FRP Damage located along starboard bow.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 March 2014
Resolved 26 March 2014
Resolution: Damages repaired to the satisfaction of Attending MI.
Construction/Loadline › Penetrations › Pipe Flange
Issued 13 March 2014 Resolved
Remove 05 sea valve covers/vents for inspection of ball valves.
Action required: 705 - Other - as specified
Due 30 March 2014
Resolved 26 March 2014
Resolution: Vents removed and 05 ball sea valves inspected. All Sat.
Construction/Loadline › Penetrations › Weld
Issued 13 March 2014 Resolved
Address pitting/ cracks and wastage located on propeller.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 March 2014
Resolved 26 March 2014
Resolution: Prop was reconditioned. Inspected prop and installation All Sat.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 3 August 2011 Resolved
Provide an adequate approved first aid kit for the vessel.
Due 10 August 2011
Resolved 8 August 2011
Resolution: Talked to vsl owner, he purchased a new first aid kit.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 3 August 2011 Resolved
Provide current light list for AOR on COI.
Due 10 August 2011
Resolved 8 August 2011
Resolution: Talked to vsl owner, he printed out most up-to date light list for AOR on COI.
Navigation › Piloting/Steering › Marine Charts
Issued 3 August 2011 Resolved
Provide most current charts for AOR identified on COI.
Due 10 August 2011
Resolved 8 August 2011
Resolution: Talked to vsl owner, he purchased most up-to date charts for AOR on COI.
Engineering › Steering Gear System › Rudder
Issued 11 August 2006 Resolved
Install suitable rudder stops for steering system.
Due 25 August 2006
Resolved 23 August 2006
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 11 August 2006 Resolved
Mahe hatchewater tight.
Due 25 August 2006
Resolved 23 August 2006
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 6 July 2006 Resolved
Prove proper operation of generator included on fire system shut down.
Action required: 705 - Other - as specified
Resolved 23 August 2006
Stability › Freeing Ports › General
Issued 2 June 2006 Resolved
Freeing port calculations do not include the operators station deck area. MSC has determined that both decks must be used in claculating correct deck area for freeing port calculations.
Action required: 705 - Other - as specified
Resolved 23 August 2006
Resolution: 462 square inches cut open.
Stability › Watertight Integrity › Coaming
Issued 2 June 2006 Resolved
Combing going into forward cabin is required to be 6" in height for a weather tight door on a vessel on an exposed route.
Action required: 705 - Other - as specified
Resolved 11 August 2006
Resolution: Combing is 4.5 inches on top of the 6 inch step built into the vessel.
Stability › Water on Deck › General
Issued 2 June 2006 Resolved
Prove all deck hatches are water tight.
Action required: 705 - Other - as specified
Resolved 23 August 2006
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 2 June 2006 Resolved
Provide shaft calculations. Proving shaft is appropriate for rated horsepower and vessel length.
Action required: 705 - Other - as specified
Resolved 11 August 2006
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 2 June 2006 Resolved
Make proper repairs to Main Engine Exhaust piping. Vessels Exhaust piping was damaged and leaking water into steering gear compartment during stability test. Piping was leaking in the area of the forward bulkhead of the steering gear compartment.
Action required: 705 - Other - as specified
Resolved 11 August 2006
Electrical › Lighting (emergency) › Lighting Fixture
Issued 2 June 2006 Resolved
Provide emergency lighting in forward accommodation area. IAW 46 CFR 183.432
Action required: 705 - Other - as specified
Resolved 11 August 2006
Resolution: This is not a normaly manned space.
Accommodation/Occupational Safety › Occupational Safety › Smoking
Issued 2 June 2006 Resolved
Provide smoke activated heat detection system IAW 46 CFR 177.410 (3)
Action required: 705 - Other - as specified
Resolved 11 August 2006
Construction/Loadline › Structures › Superstructure
Issued 2 June 2006 Resolved
Complete structural plan review on cabin attachment. Approved plans show cabin attachment using fasteners, however manufacturer is now fiber glassing the cabin to the hull.
Action required: 705 - Other - as specified
Resolved 8 August 2006
Electrical › Electric Generation Source (service) › Generator
Issued 2 June 2006 Resolved
Complete electrical plan review. Vessel's approved plans do not show a A/C Generator, however this vessel has added a 5.5KW Electrical Generator. Generator has been drawn into approved plan, however cable sizes, current ratings, and installation have not been verified. Generator line drawing needs additional information and specification sheet for Generator Sheet is needed.
Action required: 705 - Other - as specified
Resolved 11 August 2006

Casualty record · 2

31 May 2007Routine · role: Involved in a Marine Casualty · activity 2951512
18 June 2011Routine · role: Involved in a Marine Casualty · activity 4054166
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

FINS & GRINS (2007–2011). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.