Records from 2005 to 2022. Most recent: inspection, 21 June 2022.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 6 July 2022
No resolution recorded
A vessel that is exposed to salt water more than three months in any 12 month period since the last examination must undergo a drydock examination and an internal structural exam at least once every two years. 46 CFR 176.600(c)(1)
Action required: 701 - Prior to carriage of passengers/cargo
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 22 September 2021
Resolved
A vessel must have two independent means of controlling each propulsion engine. Captain was unable to demonstrate secondary means of controlling the vessel's single engine.46 CFR 184.620(a) 16 c
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 October 2021
Resolution: Captain was able to demonstrate second means of propulsion by engaging fwd and astern solenoids located on the engine, all sat.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 22 September 2021
Resolved
A pre-engineered fixed gas fire extinguishing system must be installed in accordance with the manufacturer's instructions. The vessel's engine room space aft bulkhead has an approximate 3 inch diameter cutout with electrical cables passing into the lazarette. Make penetration in bulkhead vapor tight. 46 CFR 181.420(a)(4). 16 c
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 October 2021
Resolution: Vapor tight and fire retardent foam was used on the engine room aft bulkhead, all sat.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 22 September 2021
Resolved
A vessel must carry adequate and up-to-date U.S. Coast Pilot (or similar publication) and light list for the intended voyage. The Coast Pilot and light lists provided to Marine Inspectors on board were outdated. 46 CFR 184.420 (16 c)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 October 2021
Resolution: Coast Pilot and light lists had added updates, all sat.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 22 September 2021
Resolved
Each EPIRB must be tested monthly and logged or otherwise documented. Captain's logbook showed that the EPIRB had not been tested and logged since 01May2021. 46 CFR 185.728(a) (10 c)
Action required: 10 - Deficiency Rectified
Resolved 22 September 2021
Resolution: Captain logged EPIRB testing, all sat.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 10 September 2021
Resolved
To maintain a valid Certificate of Inspection (COI), vessel must undergo an inspection for certification as specified in 46CFR176.404. The vessel's COI expired on 27 JUN 2021. The vessel must receive a COI Renewal inspection prior to carrying passengers
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 September 2021
Resolution: COI was scheduled and conducted, all sat.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 16 September 2019
Resolved
Make permanent repairs to area with delamination in forward engine room, starboard side, in way of first stringer.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 October 2019
Resolved 4 November 2019
Resolution: Received pictures showing that proper repairs were made to the deck area in the engine room.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 24 September 2018
Resolved
Weak link on life float is sized incorrectly after replacement of life float. Install correct size weak link.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 October 2018
Resolution: Weak link was replaced with correct size (6-10 persons).
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 24 September 2018
Resolved
Battery expired in life float and ring buoy water lights. Replace batteries.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 October 2018
Resolution: New batteries purchased and installed for life float and life buoy.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 24 September 2018
Resolved
Batteries in 02 smoke detectors require replacement. Replace batteries.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 October 2018
Resolution: New batteries purchased and installed in smoke detectors.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 24 September 2018
Resolved
VHF-DSC radios do not have position data. Provide GPS input to VHF radios.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 October 2018
Resolved 4 October 2018
Resolution: Operater provided GPS input into VHF radio.
Construction/Loadline › Penetrations › Valve Flange
Issued 27 June 2016
Resolved
Vessels that have submersible electric bilge pumps shall have positive shutoff valve installed at the hull penatration. Install 03 positive shutoff balves in bilge system.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 27 July 2016
Resolved 20 October 2016
Resolution: Vessel installed postive closing valve for forward tow overboards. Will be giving special consideration for the aft valve due to the location.
Communications › Radio Communications › VHF Radiotelephone
Issued 27 June 2016
Resolved
Make VHF radio DSC capable
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 July 2016
Resolved 15 July 2016
Resolution: Vessel Made VHF radio DSC capable.
Navigation › Piloting/Steering › Marine Charts
Issued 20 June 2016
Resolved
Provide updated charts.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 July 2016
Resolved 15 July 2016
Resolution: Vessl bought new charts
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 18 June 2012
Resolved
PROVIDE VALID FCC SAFETY RADIO CERTIFICATE.
Action required: 705 - Other - as specified
Due 18 July 2012
Resolved 17 July 2012
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 18 June 2012
Resolved
PROVIDE VALID EYE WASH FOR FIRST AID KIT.
Due 2 July 2012
Resolved 18 July 2012
Lifesaving › Hand Flares › Storage
Issued 18 June 2012
Resolved
PROVIDE WATERTIGHT CONTAINER FOR DISTRESS SIGNALS.
Due 2 July 2012
Resolved 17 July 2012
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 4 June 2012
Resolved
REPLACE CUTLASS BEARING.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 June 2012
Pollution Prevention/Response › Prevention Equipment › Sewage System Valve
Issued 4 June 2012
Resolved
PROVE PROPER OPERATION OF MSD DISCHARGE VALVE.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 June 2012
Navigation › Piloting/Steering › Marine Charts
Issued 6 July 2011
Resolved
Provide current charts for AOR.
Due 13 July 2011
Resolved 14 July 2011
Resolution: Current charts on-board.
Lifesaving › Lifefloat › Serviceable
Issued 6 July 2011
Resolved
Make SAT repairs to L/F.
Due 13 July 2011
Resolved 14 July 2011
Resolution: SAT repairs made to L/F.
Communications › Alarms/Indicators › Bilge Alarm
Issued 6 July 2011
Resolved
Prove proper operation to high water alarm in #2 compartment.
Due 13 July 2011
Resolved 6 July 2011
Resolution: Alarm corrected on spot.
Lifesaving › Lifebuoys › Serviceable
Issued 6 July 2011
Resolved
Provide servicable life buoy.
Due 13 July 2011
Resolved 14 July 2011
Resolution: New life buoy on-board.
Engineering › Steering Gear System › Linkage
Issued 6 July 2011
Resolved
Prove proper operation of emergency steering.
Due 13 July 2011
Resolved 14 July 2011
Resolution: Emergenct steering proved.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 6 July 2011
Resolved
Prove proper operation of audible alarm on pre-engineered system.
Due 13 July 2011
Resolved 14 July 2011
Resolution: New alarm installed, tested SAT.
Electrical › Electrical Distribution System (service) › Wiring
Issued 12 July 2007
Resolved
missing metal brackets for engineroom wiring at least every 24 inches.
Condition: Improper Installation
Due 28 July 2007
Resolved 25 July 2007
Resolution: installed required brackets
Stability › Freeing Ports › General
Issued 11 August 2006
Resolved
Vessel must ad an additional 136 square inches or freeing port space for a total of 280 square inches prior to OCEANS route.
Action required: 705 - Other - as specified
Due 2 February 2009
Resolved 2 February 2009
Resolution: Vessels route ammended to reflect "Limited Coastwise".
Deck/Cargo › Holds/Tanks › Hatch
Issued 3 August 2006
Resolved
Make E/R hatch water tight.
Action required: 705 - Other - as specified
Resolved 19 October 2006
Resolution: hinges, a gasket and locking mechanisms were added to the engine cover.
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 26 July 2006
Resolved
Required to provide two portable flash lights for vessel
Due 2 August 2006
Resolved 3 August 2006
Communications › Alarms/Indicators › Bilge Alarm
Issued 26 July 2006
Resolved
provide visual indicators for auto bilge pumps.
Due 2 August 2006
Resolved 3 August 2006
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 26 July 2006
Resolved
Install approved retro tape on life buoy
Due 2 August 2006
Resolved 3 August 2006
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 26 July 2006
Resolved
Required to provide one additional type I life jacket.
Due 2 August 2006
Resolved 3 August 2006
Engineering › Fuel Oil Service System › Valve
Issued 26 July 2006
Resolved
Label direction of fuel valves. (open close)
Due 2 August 2006
Resolved 3 August 2006
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 7 June 2006
Resolved
Vessel is to provide a valid certificate of documentation prior to operating.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 3 July 2006
Documentation › Certificates/Documents › Letter of Substantial Compliance (DAPI)
Issued 7 June 2006
Resolved
Proof of enrollment in a CG approved drug testing program is to be provided prior to operating.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 26 July 2006
Operations/Management › Drills/Instruction › Abandon Ship
Issued 7 June 2006
Resolved
Crew drills shall be witnessed prior to operating.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 26 July 2006
Resolution: SAT fire and man ovbd drill witnessed.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 7 June 2006
Resolved
All lifesaving gear (ring bouys, lifejackets, primary lifesaving, etc) shall be installed properly onboard prior to the vessel operating.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 26 July 2006
Communications › Radio Communications › EPIRB
Issued 7 June 2006
Resolved
Vessel shall be provided with a properly installed and registered 406 MHZ EPIRB prior to operating.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 26 July 2006
Communications › Radio Communications › VHF Radiotelephone
Issued 7 June 2006
Resolved
Vessel shall be provided with an operational VHF radio prior to operating.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 26 July 2006
Lifesaving › Hand Flares › Not on Board
Issued 7 June 2006
Resolved
Vessel shall be outfitted with proper visual distress devices in a watertight container properly marked prior to operating.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 26 July 2006
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Number
Issued 7 June 2006
Resolved
Vessel shall be outfitted with the proper number of portable fire extinguishers and fire buckets prior to operating.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 26 July 2006
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 7 June 2006
Resolved
Vessel shall be outfitted with a proper first aid kit prior to operating.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 26 July 2006
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 7 June 2006
Resolved
Vessel shall be marked with the name and documentation number prior to operating.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 26 July 2006
Navigation › Piloting/Steering › Marine Charts
Issued 7 June 2006
Resolved
Vessel shall be outfitted with the proper publications and navigation equipment appropriate for it's route prior to operating.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 26 July 2006
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 7 June 2006
Resolved
Vessel shall be outfitted with the proper ground tackle appropriate for it's route prior to operating.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 26 July 2006
Documentation › Certificates/Documents › FCC SSL
Issued 7 June 2006
Resolved
Proper FCC certificates shall be provided prior to operating.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 26 July 2006
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 26 May 2006
Resolved
Vessel is constructed of general purpose resin and must install a fire detection system in all enclosed spaces IAW 46 CFR 177.410(c)(3) and MOC Policy letter 4-98 priot to a COI being issued.
Action required: 705 - Other - as specified
Due 26 May 2006
Resolved 26 July 2006
Construction/Loadline › Structures › Manhole
Issued 26 May 2006
Resolved
Retention cords for all watertight hatches are to be provided.
Action required: 705 - Other - as specified
Due 26 May 2006
Resolved 7 June 2006
Resolution: Cords provided.
Electrical › Electrical Distribution System (service) › Wiring
Issued 26 May 2006
Resolved
Proper size wire shall be installed for the anchor windlass, current wire is undersized.
Action required: 705 - Other - as specified
Due 26 May 2006
Resolved 7 June 2006
Resolution: Proper wire installed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 26 May 2006
Resolved
Wiring for the bow thruster was undersized - proper size wire (2 AWG) shall be installed.
Action required: 705 - Other - as specified
Due 26 May 2006
Resolved 7 June 2006
Resolution: Proper wire installed.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 26 May 2006
Resolved
Bilge pump and bilge light circuit breakers were undersized - proper sized breakers are to be installed.
Action required: 705 - Other - as specified
Due 26 May 2006
Resolved 7 June 2006
Resolution: Proper breakers installed.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 26 May 2006
Resolved
All bulkhead penetrations fore and aft of the engine compartment are to be sealed with a fire retardent foam.
Action required: 705 - Other - as specified
Due 26 May 2006
Resolved 7 June 2006
Resolution: Foam specs provided and penetrations installed.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 26 May 2006
Resolved
Proper rail courses shall be installed IWO passenger embarkation areas on main deck.
Action required: 705 - Other - as specified
Due 26 May 2006
Resolved 7 June 2006
Resolution: proper coures installed.
Electrical › Electrical Distribution System (service) › Conductor
Issued 26 May 2006
Resolved
Vessels electrical plans are to be amended to reflect actual onboard installation (changes to wire sizes and overcurrent protection).
Action required: 705 - Other - as specified
Due 26 May 2006
Resolved 26 July 2006
Personnel › Certificates/Documents/Licenses › License, Master
Issued 6 December 2005
Resolved
Valid master's license shall be provided prior to operating.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 26 July 2006
Documentation › Markings/Placards › Lifejacket Placard
Issued 6 December 2005
Resolved
The following placards/labels/instructions shall be posted onboard prior to operating: oil discharge, garbage discharge, lifejacket donning instructions, emergency checklist, emergency broadcast, bilge alarms, and ventilation shutdown locations.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 26 July 2006
Communications › Audible Communications › Horn/Whistle
Issued 6 December 2005
Resolved
Vessel shall be outfitted with the proper sound producing devices prior to operating.
Action required: 705 - Other - as specified
Due 7 June 2006
Resolved 26 July 2006