Records from 2017 to 2023. Most recent: inspection, 21 February 2023.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 21 February 2023
Resolved
Each operation described in paragraph 2 of this regulation shall be fully recorded without delay in the Oil Record Book Part 1. PSCO observed one bunkering operation with the fuel amounts blank and another in which the total fuel amount did not equal the sum received by individual fuel tanks. Proper bunker delivery notes were referenced for rectification.
MARPOL I/17.4 - 10c
Action required: 10 - Deficiency Rectified
Resolved 21 February 2023
Resolution: Chief Engineer corrected the Oil Record Book before the PSC Team disembarked.
Documentation › Safety Management System › Conformity Maintenance Procedures
Issued 27 November 2017
Resolved
1400: Machinery, Boilers, other pressure vessel associated piping and fittings shall be of a design and a construction adequate for the service for which they are intended. During the PSC exam the following items were found patched: Cooling pipe for A/C, Oily bilge tank, cement box patch was found on sounding pipe, heating supply and return lines, air pipe and supply line has been modified to include drains from main air compressors. Cement box patch was found on Cool S.W Pump. Patch was found on main engine air cooler outlet line and patch was found on intermediate shaft bearing outlet pipe, SOLAS 74 (14 con) II-1/26, 17ac.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 30 November 2017
Resolved 29 November 2017
Resolution: Addressed by the attending Classification Representative.
Construction/Loadline › Hull › Stiffener
Issued 27 November 2017
Resolved
1230: Guard rails shall be fitted to all exposed parts. Cracks were found on bulwark starboard side forward of C/H #3, ICLL Reg 25, 17ac. .
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 30 November 2017
Resolved 29 November 2017
Resolution: Addressed by the attending Classification Representative.
Lifesaving › Lifeboat Equipment › Tools (engine)
Issued 27 November 2017
Resolved
0371: Each enclosed space entry and rescue drill shall include, Checking and use of rescue equipment and procedures. Enclosed space stretcher has grommets missing. Use in current condition could cause physical injury, SOLAS 74 (14 con) III 19.3.6.2.4, 17ac.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 30 November 2017
Resolved 29 November 2017
Resolution: Addressed by the attending Classification Representative.
Operations/Management › Drills/Instruction › Safety Orientation
Issued 27 November 2017
Resolved
0371: Each enclosed space entry and rescue drill shall include, Checking and use of rescue equipment and procedures. Enclosed space stretcher has grommets missing. Use in current condition could cause physical injury, SOLAS III 19.3.6.2.4, 17ac.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 30 November 2017
Resolved 29 November 2017
Resolution: A new stretcher was purchased and placed on board.
Documentation › Logs/Records › Garbage Recordkeeping
Issued 27 November 2017
Resolved
2120: Every ship shall carry a Garbage Management Plan. Vessel has a plan but the [name withheld] is not recording all discharges for cargo residues, MARPOL V/10, 10c.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 November 2017
Resolved 27 November 2017
Resolution: Discussed recording procedures with the Captain and [name withheld].
Documentation › Logs/Records › Ballast Water Logs/Records
Issued 27 November 2017
Resolved
2510: Vessel must maintain a Ballast Water Management Plan that will allow those responsible for the plan to understand and follow it. Crew is not recording sediment disposal or items outlined in the Bio-Fouling Plan, 33CFR151.2050(g), 10c.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 November 2017
Resolved 27 November 2017
Resolution: Discussed recording procedures with the [name withheld] and Chief Engineer.