Records in 2007. Most recent: inspection, 15 October 2007.
A report is not offered for this hull: Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. Reports.
Construction/Loadline › Markings › Load Line Mark
Issued 15 October 2007
Resolved
Load line marking was not in contrasting color (white or yellow) to hull.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 November 2007
Resolution: Received Class report markings have been corrected to his satisfaction.
Operations/Management › Pollution › Control of Garbage
Issued 15 October 2007
Resolved
Mixed garbage found. C/O is responsible for garbage. He didn't know the incinerator was used to burn garbage, or the colors of cans for batteries, oily rags, or ash. Recommend translation of plan into English for PSC inspectors.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 November 2007
Resolution: Received Class report Garbage Plan has been translated into English and Garbage training and plan was updated to his satisfaction.
Documentation › Certificates/Documents › Certificate of Financial Responsibility
Issued 15 October 2007
Resolved
Original COFR is not on board.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 November 2007
Resolution: Received Class the Company was not aware that the original COFR had to be on board. Corrective action was taken by the Company to his satisfaction.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 15 October 2007
Resolved
Medicine chest had inaccurate account of syringes which were kept unlocked in a drawer. Expired medicine was kept unlocked in the "doctor" cabin which was inhabited by a cadet. Medical officer (C/O) must make and accurate account of all medical supplies and secure expired medicine.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 November 2007
Resolution: Received Class report accountability of medicines was taken by the Master [name withheld] was inspected by Class.
Lifesaving › Lifeboat › Hull
Issued 15 October 2007
Resolved
2 cracks found on port side totally enclosed lifeboat. 1 aft adjacent to shore tie. 1 forward on gunnels near release hook. 2 unsecured diesel Jerri cans found in port lifeboat. Jerri cans were not designed for fuel. Rectify to satisfaction of Class.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 November 2007
Resolution: Received Class report lifeboats have been corrected to his satisfaction.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 15 October 2007
Resolved
Port side pilot ladder has two broken steps (bottom and 3rd from bottom). The bottom rung on the starboard pilot ladder is too thin.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 November 2007
Resolution: Received Class report pilot ladder has been renewed.
Operations/Management › Cargo Transfer/Lightering › Vessel Transfer Procedures on Hand
Issued 15 October 2007
Resolved
Bunker/Cargo Transfer procedures are not written in accordance with 33CFR. Code 10
Due 15 October 2007
Resolved 15 October 2007
Resolution: Vessel provided with correct example.
Documentation › Logs/Records › Ballast Water Logs/Records
Issued 15 October 2007
Resolved
BWM Plan is not followed. No log is filled out for sediment conditions. C/O is recording ballast exchanges with a different form than specified in plan. Sampling points in plan are not clearly marked.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 November 2007
Resolution: Received Class report sampling points have been marked and the C/O is making remarks concerning sediment.
Engineering › Diesel Engine (propulsion-direct drive) › Block
Issued 15 October 2007
Resolved
Two cracks found on forward top bracing on main engine at the welds. Four patches found on main engine #1 cooler. C/E did not tell master about patches.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 15 November 2007
Resolution: Received Class report top bracing supports have been repaired and so has the air cooler under the direction of Class.