Records from 2006 to 2026. Most recent: inspection, 28 January 2026.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 13.0 ft
Registered tonnagegross 1,754 / net 1,754
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBOLLINGER MARINE FABRICATORS LLC · AMELIA, LA, UNITED STATES · built 2006
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 2 July 2026 · expires 31 July 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1754 - Simplified, Gross Ton
1754 - Simplified, Net Ton
5174 - Dead Weight, Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 32
28 January 2026
Periodic Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8302803
6 May 2025
Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 8136903
6 March 2025
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8089176
13 February 2025
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8079033
15 February 2024
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7860525
15 January 2023
Deficiency Check · MTSA Verification · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7621186
15 December 2022
Deficiency Check · Internal Structural Exam · Drydock Exam · Cargo Tank Internal
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7609415
28 September 2017
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6277437
17 May 2016
Internal Structural Exam · Drydock Exam · Cargo Tank Internal
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5879248
29 May 2015
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5138159
1 April 2015
Load Line/Change of Employment
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5094332
5 March 2015
Damage Survey
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 5079423
5 March 2015
Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 5094375
7 May 2014
Periodic Inspection · MTSA Verification · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4852885
10 July 2012
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4374033
21 June 2011
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4052505
13 February 2011
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3962006
17 May 2010
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3740490
22 April 2010
Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 3722009
4 February 2010
Load Line/Change of Employment
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3675557
13 January 2010
Load Line/Change of Employment
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 3663342
13 May 2009
Periodic Inspection · Examination of Repairs · MTSA Verification · Administrative Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3473784
16 June 2008
Annual Inspection · MARPOL Annex V Examination · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3239077
26 February 2008
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3155685
26 June 2007
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2974398
5 February 2007
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2867627
10 August 2006
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2742536
4 August 2006
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2735807
3 August 2006
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2735155
3 July 2006
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2700065
8 May 2006
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2643938
5 May 2006
Construction Oversight · MARPOL Annex I Examination · MTSA Verification · Initial Certification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2641452
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 15 January 2023
Resolved
46 CFR 36.10-1(a)Cargo pump relief valves and pressure gages may be omitted, however, a suitable device shall be fitted to stop the pumping before the designed pressure of the piping is exceeded. Vessel cargo discharge piping is not fitted with a relief valve and has no documentation stating that the pump discharge pressure will not exceed piping MAWP.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 30 March 2023
Resolved 16 February 2023
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 January 2023
Resolved
46 CFR 35.30-20(b)(c)One emergency outfit is required for all manned tank barges having cargo tanks which exceed 15 feet in depth, measured from the deck to the lowest point at which cargo is carried. Each emergency outfit shall be equipped as follows:(1) One pressure-demand, open-circuit, self-contained breathing apparatus, approved by the Mine Safety and Health Administration (MSHA) and by the National Institute for Occupational Safety and Health (NIOSH) and having at a minimum a 30-minute air supply, a full facepiece, and a spare charge. Vessel not equiped with self-contained breathing apparatus and a spare charge.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 March 2023
Resolved 21 February 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 15 January 2023
Resolved
46 CFR 56.50-25(b)(4)Nonmetallic flexible hose may be used in lube oil, fuel oil, and fluid power systems only where flexibility is required and in lengths not exceeding 30 inches. Vessel had two fuel return line hoses exceeding 30 in.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 March 2023
Resolved 17 February 2023
Engineering › Diesel Engine (auxiliary) › Turbocharger
Issued 5 March 2015
Resolved
Turbocharger on starboard side pump engine caught on fire and rendered engine inoperable. Make proper repairs to stbd. pump eingine.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 19 March 2015
Resolved 6 March 2015
Resolution: Stbd. pump engine was run and tested by inspectors from SEC NY; all sat.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 7 May 2014
Resolved
VCS connection flange did not have a permanently attached stud, port and starboard side. 46CFR39.20-3 (e).
Action required: 705 - Other - as specified
Due 8 June 2014
Resolved 12 May 2014
Resolution: Verified that the stud is permanently attached and meet requirements in 46CFR39.20-3 (e).
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 26 June 2007
Resolved
Secure microwave oven and water heater in accomodation space to prevent shifting.
Due 10 July 2007
Resolved 28 June 2007
Resolution: Metal straps and welding used to permanently secure objects.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 26 June 2007
Resolved
Replace stud on stbd vapor recovery flange.
Due 10 July 2007
Resolved 28 June 2007
Resolution: New stud installed.