Records from 2006 to 2023. Most recent: inspection, 3 November 2023.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 23
3 November 2023
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7817943
26 July 2018
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6483436
20 July 2017
ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6215062
5 July 2016
Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 5914790
18 April 2016
NPV Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5856508
24 March 2014
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4818600
4 February 2012
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4233460
25 January 2011
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3927511
19 December 2009
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3652690
8 April 2009
Type not recorded
No type recorded · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3450228
7 January 2009
Random ISPS/MTSA/PSC · Ballast Water Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3390171
19 July 2008
Administrative Inspection
Administrative · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3272639
16 June 2008
Random ISPS/MTSA/PSC
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3238722
11 February 2008
Administrative Inspection
Administrative · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3145638
2 February 2007
ISPS II Exam · MARPOL Annex I Examination · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2863368
22 September 2006
Administrative Inspection
Administrative · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2784689
10 August 2006
Type not recorded
No type recorded · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2742863
10 July 2006
Type not recorded
No type recorded · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2708554
23 May 2006
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2656656
19 April 2006
Administrative Inspection
Administrative · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2628678
7 March 2006
Type not recorded
No type recorded · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2598678
24 January 2006
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2572302
23 January 2006
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2572053
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 November 2023
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to persons onboard, due regard being paid to moving parts, hot surfaces and other hazards. The design shall have regard to materials used in construction, the purpose for watch the equipment is intended, the working conditions to watch it will be subjected and the enviromental conditions on board.
PSCO observed leak alarm on generator No. 1 was being bypassed using a hose system was put back into normal operational conditions resulting leakage and triggering leak alarm. Reccomend repair of leak on generator No. 1 prior to movement. 74SOLAS(2009)II-1/26.1
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 6 November 2023
Resolution: Vessel/vessel agents submitted class dispensation from Lloyd's Register for an onboard inspection. Inspection satisfies requirements of prior to movement deficiency. Cleared from deficiency.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 18 April 2016
Resolved
2550: After any survey of the ship has been completed, no change shall be made in the machinery without the sanction of the administration. A hard patch was applied to the fresh water cooler for the #1 generator without sanction from the administration. 74 SOLAS (14) I/11(6); 40ac
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 19 April 2016
Resolved 5 July 2016
Resolution: Verified proper piping was installed on fresh water cooelr for the #1 generator.
Fire Fighting › Fixed Fire Detection System › Flame Detectors
Issued 18 April 2016
Resolved
0715: The function of fixed fire detection shall be periodically tested by means of equipment producing phenomena associated with incipient fires to which the detector is designed to respond. Flame detectors were being tested improperly. Crew is not using appropriate equipment required by the manufacturer. 74 SOLAS (04) II-2/7.3.2; 40ac
Condition: Placed in Improper Service
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 19 April 2016
Resolved 5 July 2016
Resolution: Verified flame detectors were properly tested and crew used appropriate equipment required by the manufacturer.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 18 April 2016
Resolved
0999: Cylinders that are used for containing compressed gases must be stowed in a rack in an upright position. Oxygen and acetalyne cylinders do not have proper brackets. 46 CFR 147.60(b)(1); 10c
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 18 April 2016
Resolved 18 April 2016
Resolution: Crew has a certified fitter onboard and will fabricate appropriate brackets for the cylinders.
Pollution Prevention/Response › Prevention Equipment › Drains/Scuppers (means of closure)
Issued 18 April 2016
Resolved
1720: Each drain for discharge containment must be closed by the mechanical means required by 155.310. The means being used to close the deck small containment drains is insufficient to prevent the discharge of oil or oily water. 33 CFR 156.120(o); 10c
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 18 April 2016
Resolved 18 April 2016
Resolution: Crew replaced mechanical closure devices.
Documentation › Logs/Records › Ballast Water Reporting Form
Issued 19 December 2009
Resolved
Vessel required to submit ballast water form to National Ballast Information Clearinghouse (NBIC). Vessel had not sent report to NBIC for this port call or for any previous U.S. port call. Master submitted proper report for this port call during exam. 33 CFR 151.2041
Condition: Unknown
Due 19 December 2009
Resolved 19 December 2009
Resolution: [name withheld] reporting form submitted to NBIC to the satisfaction of the USCG.