← All vessels
CS ZEPHYR
CS ZEPHYR is a 2006 tank ship. The Coast Guard has recorded 20 inspections since 2006, most recently in November 2019, along with 21 deficiencies and 5 operational controls.
Records from 2006 to 2019. Most recent: inspection, 17 November 2019.
- Built
- 2006
- Last inspected
- 17 November 2019
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 21 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9308819 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
D5LQ5
804181
Flag
LIBERIA
—
Maury page id
psix-804181
Inspections, by type
…with no type recorded6
Years with a record
7 calendar years (2006–2019)
The 20 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 7 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it58446 - Convention (Subpart B), Gross Ton
30901 - Convention (Subpart B), Net Ton
122569 - Displacement, Ton
104591 - Dead Weight, Ton
30901 - Convention (Subpart B), Net Ton
122569 - Displacement, Ton
104591 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 20
17 November 2019
In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6857048
2 October 2019
Ballast Water Examination · ISM Exam · COC-TVE Renew · PII Safety Exam · Deficiency Check · ISPS II Exam · In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6825802
8 December 2015
NPV Safety Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5777553
8 December 2015
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5779078
12 November 2015
Ballast Water Examination · ISPS II Exam · COC-TVE Renew
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5757211
23 January 2012
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4230110
23 January 2012
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4231506
23 January 2012
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4233028
20 January 2012
Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4228258
14 January 2012
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4224798
28 December 2011
Ballast Water Examination · ISPS II Exam · COC-TVE Renew
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4211382
27 December 2011
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4211381
5 February 2010
COE-Administrative
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3676178
1 February 2010
COE-Administrative
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3674014
25 January 2010
COE-Dockside
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3665571
17 April 2007
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2909275
2 February 2007
ISPS II Exam · COC-TVE Annual · Ballast Water Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2862947
18 October 2006
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2803096
1 February 2006
COC-TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2571779
1 February 2006
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2577716
Deficiency record · 21
14 - Pollution Prevention › 146 - MARPOL Annex VI › Quality of fuel oil
Issued 17 November 2019
Resolved
14607 - Pollution Prevention - While ships are operating within an emission control area (ECA), the sulfur content used on board ships shall not exceed 0.1%. Vessel completed the proper ECA changeover procedure prior to entering ECA zone near Houston, TX on 01NOV19. Vessel then transited to New Orleans area while continuing to operate on MGO. On 14NOV19, while at SW pass, Vessel depleted all stores of MGO and commenced burning HSFO while en route to Magnolia Anchorage. On 14NOV19, while at Magnolia Anchorage, vessel bunkered 484.22 MT of MGO and completed changeover procedures to MGO. PSCO attended and verified MARPOL compliance. MARPOL Annex VI/14.4 10c
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 October 2019
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. During PSC exam, PSCOs observed fuel oil leaking out of the main propulsion engine’s #6 high pressure fuel line at the cylinder head while the engine was not running. Under normal conditions none should be seen leaking.
SOLAS 74 (14 Cons)
I/11(a)
30 A/C
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 October 2019
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. During PSC exam, PSCOs observed excessive amounts of jacket water pouring out from the ship’s main propulsion engine’s #1 and #6 cylinder seals.
SOLAS 74 (14 Cons)
I/11(a)
30 A/C
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019
Resolved
Cables and wiring shall be installed and supported in such a manner as to avoid chaffing or other damage. During PSC exam, PSCOs observed numerous electrical hazards including but not limited to chaffed and cut electrical cable insulation on the middle SSDG exhaust temperature RTD, purifier room motor controller cabling, multiple purifier room electrical valve controller wires were pulled out of the packing, sludge tank remote level indicator wires in the purifier room were pulled out of the packing, the oxygen analyzer transmitter box cables were pulled out of the packing, the emergency alarm annunciator's electrical wires were pulled out of the packing, wires to the ventilation damper motor controller were twisted and pulled out of the electrical box, a fire detector in the engine room was found with a cut cable going into the packing, exposed wiring was found near the steam heater for the fuel oil booster skid in the purifier room, and all three SSDG main electrical distribution lines at the generator boxes appeared to be cracked and deteriorated.
SOLAS 74 (04 Cons)
II-1/40.2
30 A/C
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019
Resolved
All electrical apparatus shall be constructed and installed as not to cause injury when handled or touched in the normal manner. PSCOs observed that the means to secure power to the motor controllers for the #1 and #2 HFO purifiers and fuel oil supply and circulation pumps were broken, which would expose the crew to live electrical hazards in order to secure power at the motor controllers locally.
SOLAS 74 (04 Cons)
II-1/45.1.3
30 A/C
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2019
Resolved
Where cables which are installed in hazardous areas introduce risk of fire or explosion in the event of an electrical fault, special precautions against such risk shall be taken. During PSC exam, PSCOs observed fuel oil on and inside the motor controllers for the fuel oil pump motors.
SOLAS 74 (04 Cons) II-1/45.5.4
30 A/C
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 2 October 2019
Resolved
Purpose of this regulation is to prevent the ignition of combustible materials. Ignition sources shall be separated from combustible materials. PSCO observed main engine cylinder #6 was leaking fuel oil from the high-pressure fuel injector. Evidence of excessive leaking was found in the engine room. Diesel-soaked rags were found around the cylinders, unapproved plastic collection buckets full of oil mixtures were located in two separate areas in the engine room, creating a fire hazard. The oil purifier room was found in disrepair with extensive oil accumulation.
SOLAS 74 (14 Cons) II-2/4.1.5
30 A/C
99 - Other › N/A - No Subsystem › Other (SOLAS operational)
Issued 2 October 2019
Resolved
When a defect is discovered, which affects the safety of the ship or the efficiency or completeness of its equipment, the master or vessel's representative shall report at the earliest opportunity to the Administration or the RO responsible for issuing the relevant certificate as well as the authorities of the port State in which the vessel is in. PSCOs conducted Port State Control Exam and observed numerous conditions which affected the safety of the ship and the completeness of its equipment and were not made aware to the USCG by the vessel's master nor the RO responsible for issuing the relevant certificates.
SOLAS 74 (14 Cons) I/11(c)
30 A/C
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 2 October 2019
Resolved
The Company should ensure that inspections are held at appropriate intervals, any non-conformity is reported, and appropriate corrective action is taken. The vessel's safety management system required weekly, monthly, and annual inspection of the marine sanitation device. Records show that the weekly, monthly, and annual inspections were not conducted as often as required by the ship's safety management system. PSCOs identified a crack on the marine sanitation tank as well as human feces covering the tank, both of which were not reported by the vessel, nor was there evidence of any corrective action being taken except for a bucket placed beneath the tank to collect the leaking contents.
SOLAS 74 (14 Cons) IX/3.1
ISM Code 10.2
30 A/C
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company responsibility and authority
Issued 2 October 2019
Resolved
Every company should develop, implement and maintain a safety management system which include instructions and procedures to ensure safe operation of ships and protection of the environment in compliance with relevant international and flag State legislation. During the expanded ISM exam PSCOs received verbal statements from the crew that the vessel had not prioritized the implementation of ISM procedures prior to entry into US water. The lack of implementation became further evident during the examination of records for parts requisition by the crew to the company. It was found that the vessel had requested parts for various systems including vital equipment as early as January of 2019 which weren’t received until September of 2019. The crew informed PSCOs that this was when the vessel was scheduled to operate in US waters after a 4 year gap from the previous US port state control exam. Records showed a total of 106 parts were request for the vessel since January and 44 of these parts were received on September 14, two weeks prior to the vessel arrival in US waters. 146 maintenance items were discovered to be overdue across systems which encompass machinery, lifesaving, firefighting, accommodations, cargo, ballast, and navigation. Evidence indicated that some of these items were overdue as a result of the need for parts which were not readily provided to the vessel.
SOLAS 74 (14 Cons) IX/3.1
ISM Code 1.4.2
30 A/C
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company responsibility and authority
Issued 2 October 2019
Resolved
Objective evidence discovered during an expanded ISM examination revealed the following major non-conformity; the vessel failed to fully implement the requirements of the SMS as evident by deficiency #1-9. An external audit is required.
SOLAS 74 (14 Cons) IX/3.1
ISM Code 9
30 A/C
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 2 October 2019
Resolved
Vessel’s load lines shall be painted in white or yellow on a dark ground or in black on a light ground. Vessel’s load line on both the port and starboard sides was severely faded and illegible.
ILLC (88 Prot.) Reg. 8
17 A/C
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 October 2019
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCOs observed an excessive amount of cooling water leaking from the plate-type heat exchanger serving the vessel's main engine.
SOLAS 74 (14 Cons) I/11(a)
40 A
Engineering › Diesel Engine (propulsion-direct drive) › Distributor (air start)
Issued 8 December 2015
Resolved
The vessel lost propulsion enroute from [name withheld] Anchorage to Del City. Cause of failure, still undetermined.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Governor
Issued 23 January 2012
Resolved
The vessel experienced a power loss while in the Mississippi River.
Construction/Loadline › Hull › Bottom Plating
Issued 23 January 2012
Resolved
The vessel experienced a grounding while in the Mississippi River.
Engineering › Freshwater System (jacketwater cooling) › Fitting
Issued 28 December 2011
Resolved
1410-Propulsion main engine-The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure the ship in all respects will remain fit to proceed to sea. PSCO observed the #6 cylinder liner was leaking jacket water excessively through the lower sealing O ring-SOLAS 74a, Reg. I/11
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Flame Screens
Issued 28 December 2011
Resolved
1850-Fire protection cargo deck area-The arrangements for the venting of vapors displaced during loading and ballasting shall prevent the passage of flame into the tank. PSCO observed numerous ballast tanks had 1/4" mesh rather than flame screens. Provide clarification from certificate issuing authority attesting to acceptability of installed mesh vice flame screens-SOLAS 74a, Reg. II-2/4.5.3
Deck/Cargo › Holds/Tanks › Portable Gas Measuring Equipment
Issued 28 December 2011
Resolved
1840-Instrumentation-Tankers shall be equipped with at least one portable instrument for measuring flammable vapor concentrations, together with a sufficient set of spares. Vessels crew could not turn on second flammable vapor meter. Vessels crew placed meter on charger for one hour, and still could not turn on meter to demonstrate proper operation-SOLAS 74a, Reg. II-2/4.5.7.1
Electrical › Electric Generation Source (emergency) › Power Requirement
Issued 28 December 2011
Resolved
1430-Auxiliary engines-A 2nd source of energy shall be provided for an additional 3 starts of the EDG within 30 mins unless manual starting can be demonstrated to be effective. Vsl had 1 battery bank for EDG, but was unable to start EDG using the manual start. Reservoir for the hydraulic system was empty, and crew could achieve 6 mpa when 21 mpa was necessary per instruction-SOLAS 74a, Reg II-1/44
Engineering › Diesel Engine (propulsion-reduction gear) › Valve
Issued 17 April 2007
Resolved
Vessel has notified a problem with the vessel's main engine control system while the vessel was attempted to get underway from the dock. Prior to departure, the Classification Society is to submit a report attesting to the nature fo the problem, corrective action taken and proper operation of the propulsion system.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.