MAURY USCG vessel records Sign in
← All vessels

ACTIVE (EX. DELTA MONARCH)

ACTIVE (EX. DELTA MONARCH) is a 2006 offshore supply vessel. The Coast Guard has recorded 1 inspection in 2005, along with 34 deficiencies — 2 with no resolution recorded —.

Records in 2005. Most recent: inspection, 21 September 2005.

Built
2006
Last inspected
21 September 2005
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDC9249
804835
Flag
UNITED STATES
367099540 (licence lapsed)
Maury page id
psix-804835

Inspections, by type

…past their stated due date2
Years with a record 1 calendar year (2005)
The 1 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 21 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records it54 - Regulatory (Subpart C or D), Net Ton
149 - Convention (Subpart B), Net Ton
80 - Regulatory (Subpart C or D), Gross Ton
498 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WDC9249MMSI 367099540 · expired · voluntarily equipped · granted 15 March 2006, cancelled 21 May 2016 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

A report is not offered for this hull: Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. Reports.

Inspection history · 1

21 September 2005 COI Inspection · Initial Construction-Excluding Oversight · Cargo Tank Internal · Initial Certification · Construction Oversight · Hull Examination · Internal Structural Exam · Welding Related Inspections Qualification Testing · Plan Review (Other than "T") · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2604191

Deficiency record · 34

Electrical › Electrical Distribution System (service) › Switchboard
Issued 17 March 2006 Resolved
Provide Di-Electric matting for Main Switchboard
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2006
Resolved 17 March 2006
Resolution: installed
Construction/Loadline › Markings › Load Line Mark
Issued 17 March 2006 Resolved
Permanently apply the load line marks on the port side of the hull.
Action required: 17 - Rectify deficiencies prior to departure
Due 31 March 2006
Resolved 17 March 2006
Resolution: Marked
Documentation › Markings/Placards › Official Number (US)
Issued 17 March 2006 Resolved
Permanently mark the vessel offical number and hailing port on the vessel.
Action required: 17 - Rectify deficiencies prior to departure
Due 31 March 2006
Resolved 17 March 2006
Resolution: Marked
Lifesaving › Inflatable Liferafts › Not on Board
Issued 17 March 2006 Resolved
Install liferafts.
Action required: 17 - Rectify deficiencies prior to departure
Due 31 March 2006
Resolved 17 March 2006
Resolution: Installed
Engineering › Compressed Air System (control) › Valve
Issued 17 March 2006 Resolved
Install missing valve handles on the following compressed air piping. Port air receiver inlet valve, Starboard air receiver inlet valve, and the liquid mud control valve air regulator.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2006
Resolved 17 March 2006
Resolution: Installed
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 17 March 2006 Resolved
Permanently mark all cargo tanks hatch covers with "CC"
Action required: 705 - Other - as specified
Due 31 March 2006
Resolved 17 March 2006
Resolution: Marked
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pumproom Ventilation
Issued 17 March 2006 Resolved
Prior to operation of the deck mounted methanol pump. install ventilation ports in the pump enclosure or install an approved fixed firefighting system.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2006
Resolved 17 March 2006
Resolution: Installed
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 17 March 2006 Resolved
Move or install tripping prevention guards on the port outboard,forward and aft liquid mud piping manifold valves.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2006
Resolved 17 March 2006
Resolution: Handles moved
Engineering › Fuel Oil Service System › Piping
Issued 17 March 2006 Resolved
Install chafing gear on the following fuel oil and lube oil piping systems; port main engine reduction gear lube oil hose, starboard generator fuel oil hose, and the bow thruster fuel oil hose.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2006
Resolved 17 March 2006
Resolution: Added
Communications › Radio Communications › Radiotelephone Transceiver (2-4 MHz)
Issued 17 March 2006 Resolved
Complete installation of the GMDSS radio system.
Action required: 705 - Other - as specified
Due 31 March 2006
Resolved 17 March 2006
Resolution: Completed
Communications › Internal Communications System › Sound-powered Telephone
Issued 17 March 2006 Resolved
Repair sound powered phone system engine room handset.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 31 March 2006
Resolved 17 March 2006
Resolution: Handset replaced
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 17 March 2006 Resolved
Complete installation and marking of all lifesaving equipment.
Action required: 17 - Rectify deficiencies prior to departure
Due 31 March 2006
Resolved 17 March 2006
Resolution: Installed
Fire Fighting › Fire Hoses › Condition
Issued 17 March 2006 Resolved
Properly label all fire hoses with the vessel name.
Action required: 705 - Other - as specified
Due 31 March 2006
Resolved 17 March 2006
Resolution: Marked
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 17 March 2006 Resolved
Install lifelines on 2 liferings and attach self igniting lights with line on 4 liferings.
Action required: 17 - Rectify deficiencies prior to departure
Due 31 March 2006
Resolved 17 March 2006
Resolution: Installed
Electrical › Electrical Distribution System (service) › Cable
Issued 17 March 2006 Resolved
Install proper metallic cable retaining devices on the mast cables and under the GMDSS console.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2006
Resolved 17 March 2006
Resolution: Installed
Fire Fighting › Combustible Materials › Linings
Issued 17 March 2006 Resolved
Remove all debris, trash and saw dust from under the pilot house forward, aft, and GMDSS consoles.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2006
Resolved 17 March 2006
Resolution: Cleaned
Navigation › Piloting/Steering › Magnetic Compass
Issued 17 March 2006 Resolved
Provide and install the light for the magnetic compass.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 31 March 2006
Resolved 17 March 2006
Resolution: Installed
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 17 March 2006 Resolved
Install life lines or grab rails at the port and starboard liferaft deck rail openings.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 31 March 2006
Resolved 17 March 2006
Resolution: Not required. Liferaft prevents step through
Construction/Loadline › Structures › Door
Issued 17 March 2006 Resolved
Remove all paint from door, ventilator, and scuttle lips and gaskets.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 March 2006
Resolved 17 March 2006
Resolution: Done
Fire Fighting › Semiportable Chemical-Foam Fire Extinguishers › Securing Means
Issued 17 March 2006 Resolved
Properly install the retaining bar and platform for the B-V fire extinguisher.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 31 March 2006
Resolved 17 March 2006
Resolution: Corrected
Navigation › Collision/Grounding Avoidance › Echo-sounding Device
Issued 17 March 2006 Resolved
Install or repair the transducer for the depth sounder.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 31 March 2006
Resolved 20 March 2006
Resolution: Repaired
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 17 March 2006 Resolved
Install missing mattresses in the 01 level aft starboard side accommodations.
Action required: 705 - Other - as specified
Due 31 March 2006
Resolved 17 March 2006
Resolution: Installed
Electrical › Electrical Distribution System (service) › Cable
Issued 17 March 2006 Resolved
Properly secure or remove the dead end cables at the following locations: Port generator, Starboard generator, Bow thruster engine, shaft tach processing unit, and the port steering controls.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2006
Resolved 17 March 2006
Resolution: Secured
Electrical › Electrical Distribution System (service) › Cable
Issued 17 March 2006 Resolved
Properly secure the cable transits for electrical cables at the fire monitor pump, port L1 panel, Engine room DC breaker panel, and the anchor capstain hydraulic power unit.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2006
Resolved 17 March 2006
Resolution: Secured
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 17 March 2006 Resolved
Provide and mount the operating instructions for the fixed CO2 system.
Action required: 17 - Rectify deficiencies prior to departure
Due 31 March 2006
Resolved 17 March 2006
Resolution: Done
Engineering › Freshwater System (jacketwater cooling) › Containment
Issued 17 March 2006 Resolved
Provide and install sight glasses on all jacket water expansion tanks.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2006
Resolved 17 March 2006
Resolution: Done
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 17 March 2006 Resolved
Provide and install a safety catch on the engine room emergency escape hatch, to ensure the hatch remains in the open position while personnel are transitting it.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2006
Resolved 17 March 2006
Resolution: Installed
Construction/Loadline › Structures › Machinery Space Opening
Issued 17 March 2006 Resolved
Install the exhaust trunk cover for the starboard exhaust trunk.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2006
Resolved 17 March 2006
Resolution: Installed
Communications › Radio Communications › Radiotelephone Transceiver (2-27.5 MHz)
Issued 17 March 2006 Resolved
Provide an operable handset for the single side band radio.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 31 March 2006
Resolved 17 March 2006
Resolution: Installed
Documentation › Certificates/Documents › International Load Line Certificate
Issued 17 March 2006 Resolved
Provide the following documents: International Load Line, LL-11D, and Freeboard Assignment,
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 31 March 2006
Resolved 17 March 2006
Resolution: Provided
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 17 March 2006 No resolution recorded
Provide a vessel specific response plan for approval.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2006 — due date passed with no resolution recorded
Operations/Management › Drills/Instruction › Abandon Ship
Issued 17 March 2006 No resolution recorded
Demonstrate ability to conduct the following drills: Fire fighting, Abandon ship, and Man overboard.
Condition: Unknown
Action required: 705 - Other - as specified
Due 31 March 2006 — due date passed with no resolution recorded
Communications › Radio Communications › EPIRB
Issued 17 March 2006 Resolved
Provide copy of EPIRB registration
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 31 March 2006
Resolved 17 March 2006
Resolution: Provided
Communications › Radio Communications › VHF Radiotelephone
Issued 17 March 2006 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 31 March 2006
Resolved 17 March 2006
Resolution: Provided.