MAURY USCG vessel records
← All vessels

NASSAUBORG

NASSAUBORG is a 2005 public freight. The Coast Guard has recorded 10 inspections since 2019, most recently in June 2024, along with 5 deficiencies and 5 operational controls, 1 with no removal date recorded.

Records from 2019 to 2024. Most recent: inspection, 17 June 2024.

Built
2005
Last inspected
17 June 2024
Documentation
Not in the documentation file of 10 August 2026
Controls
1 with no removal date recorded

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 17 June 2024
…with no type recorded2
Operational controls 1 with no removal date recorded
Years with a record 4 calendar years (2019–2024)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9248564
809754
Flag
NETHERLANDS
Maury page id
psix-809754

Documentation record

Tonnage as PSIX records it28828 - Displacement, Metric Ton
20530 - Dead Weight, Metric Ton
16037 - Convention (Subpart B), Gross Ton
6827 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 10

17 June 2024 PSC B
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7937005
7 June 2024 Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7930137
20 July 2023 Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7746804
19 July 2023 PSC A
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7742674
7 July 2023 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7736144
6 July 2023 Administrative Inspection
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7737212
12 November 2022 Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7593276
6 November 2022 PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7589843
26 March 2019 Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6649370
21 March 2019 PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6646453

Deficiency record · 5

07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 19 July 2023 Resolved
07115 The following arrangements shall be tested IAW the fire test procedurs code: fire dampers, including theri relevent means of operation. Fire damper to engine room could not be closed manually. 74SOLAS(04)II-2/9.7.1.2.1 16ac
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 August 2023
Resolved 7 June 2024
Resolution: Received report from class attesting to damper repair. (Report Attached)
10 - Safety of Navigation › N/A - No Subsystem › Echo sounder
Issued 19 July 2023 Resolved
10117 All ships of 300Gt and upwards shall be fitted with: an echosoumding device, or other electronic means, to measure and display the available depth of water. Vessels echo-sounding device was inoperable. 74SOLAS(20)V/19.2.3.1 40ac
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 8 June 2024
Resolution: Recieved tech report attesting to echo depth sounder repair. (report attached)
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 21 March 2019 Resolved
07126 - In a ship in which oil fuel is used the arrangements for the storage distribution and utilization of the oil fuel shall be such as to ensure the safety of the ship and persons onboard. PSCO discovered excessive oil in drip pan on top of cylinder heads and oil soaked lagging around main engine. 74SOLAS2001/11-2/15.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 March 2019
Resolution: Received, reviewed and accepted LR class report stating the deficiency was rectified. Gaskets and O-rings were replaced and lagging was cleaned/replaced as needed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 21 March 2019 Resolved
07199 - The machinery associated piping systems and fittings shall be of a design and construction adequate or the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons onboard, due regard being paid to hot surfaces and other hazards. PSCO witnessed excessive deterioration of lagging on exhaust and boiler pipes. 74SOLAS2004/11-1/26.1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 26 March 2019
Resolution: Received, reviewed and accepted LR class report stating the deficiency was rectified. Lagging around exhaust and boiler pipes were renewed/repaired.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 March 2019 Resolved
01305 - The master, owner, operator, agent, or person in charge of any vessel equipped with ballast water tanks that operate in the waters of the U.S. must follow these practices: actions for implementing the mandatory BWM requirements and practices. PSCO discovered multiple flow through exchanges in December of 2018. Flow through is not authorized in approved BWM plan. 33CFR151.2050(g)(2)
Action required: 10 - Deficiency Rectified
Resolved 21 March 2019

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.