MAURY USCG vessel records
← All vessels

GOOD HOPE MAX

GOOD HOPE MAX is a 2005 freight ship. The Coast Guard has recorded 21 inspections since 2016, most recently in January 2026, along with 41 deficiencies and 5 operational controls.

Records from 2016 to 2026. Most recent: operational control imposed, 8 January 2026.

Built
2005
Last inspected
8 January 2026
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls and the documentation record — is Professional, $39 a month. Sign in.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.

Inspection record

Last inspected 8 January 2026
…with no type recorded3
Operational controls None recorded without a removal date
Years with a record 8 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9304241
813334
Flag
ISLE OF MAN
Maury page id
psix-813334

Documentation record

Tonnage as PSIX records it25318 - Convention (Subpart B), Net Ton
76739 - Dead Weight, Metric Ton
87409 - Displacement, Metric Ton
40039 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
Detail on this page

21 inspections, each with its date, unit and type; 41 deficiencies with the resolution recorded against each; 5 operational controls with the dates imposed and removed; the documentation record, as PSIX holds it. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 21

8 January 2026 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 8291867
7 January 2026 PSC A · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8288775
29 September 2025 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8243621
29 September 2025 PSC B · Administrative Inspection · Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8243681
24 September 2025 PSC A
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8234972
10 September 2025 PSC A · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8229647
7 September 2025 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8228745
3 July 2025 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8173842
23 May 2025 PSC B · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8142132
31 March 2025 PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8102286
2 June 2024 Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7925388
22 March 2024 PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7875405
28 February 2022 PSC B
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 7398398
3 February 2020 Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6901457
31 January 2020 PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6893900
23 January 2020 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6895064
1 May 2018 ISPS II Exam · Ballast Water Examination · NPV Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6382563
18 December 2017 PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6317029
5 December 2017 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6319271
13 December 2016 Deficiency Check · PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6053976
10 January 2016 ISPS II Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5791092

Deficiency record · 41

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 January 2026 Resolved
The machinery associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed to reduce to a minimum any danger to persons on board. PSCO observed jacket cooling water leaking from M/E cylinder #7 head gasket 74SOLAS (04) II-1/26.1
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 10 January 2026
Resolution: Cylinder cover replaced, exhaust valve o-rings replaced, fuel injector and starting air valve reconditioned, cylinder cover gasket replaced, and o-ring replaced on connecting pipe. Engine operated t0 surveyor's satisfaction and no further leakage.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 7 January 2026 Resolved
Fire fighting systems and appliances shall be kept in good working order and readily available for immediate use. PSCO observed excessive leakage from emergency fire pump packing gland and smoke after crew made adjustments 74SOLAS(24) II-2/14.2.1.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 January 2026
Resolution: Emergency Fire pump packing replaced and weeping: for cooling minimized
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 7 January 2026 Resolved
Guard rails fitted on superstructure and freeboard decks shall have at least three courses. The opening below the lowest course of the guard rail shall not exceed 230mm. The other courses shall not be more than 380mm apart. PSCO observed broken sections of guard railing on deck near cargo hold 2 and 4 portside and near cargo hold 4 on starboard side ICLL (88 prof) Reg.25(3)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 31 January 2026
Resolution: Guard rails permanently repaired
14 - Pollution Prevention › 145 - MARPOL Annex V › Garbage
Issued 7 January 2026 Resolved
Every ship of 100 gt and above... shall carry a garbage management plan which the crew shall follow. PSCO observed crew storing garbage in upper deck escape route with no intention to remove garbage at the berth/ terminal. MARPOL V/10.2
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 January 2026
Resolved 31 January 2026
Resolution: garbage discharged to shore with receipt
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 7 January 2026 Resolved
Escape routes shall be maintained in a safe condition, clear of obstacles. PSCO observed escape route on upper deck obstructed by excessive garbage. 74SOLAS(09) II-2/13.1.2
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 7 January 2026
Resolved 7 January 2026
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 7 January 2026 Resolved
Electrical installations shall be such that electrical services essential for safety will be ensured under various emergency conditions. PSCO observed 02 inoperable emergency lights around superstructure 74SOLA(04) II-1/ 40.1.2
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 7 January 2026
Resolved 7 January 2026
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 30 September 2025 Resolved
The purpose of this regulation is to maintain and monitor the effectiveness of the fire safety measures the ship is provided with. For this purpose, the following functional requirements shall be met: Fire protection systems and firefighting systems and appliances shall be maintained and ready for use. PSCO observed the quick closing valve on the # 2 generator is missing a nut and the plunger was had excessive vibration. When addressing the Chief Engineer about testing the #2 quick closing valve, the Chief Engineer disassembled the air supply line to the #2 quick closing valve in order to test. No maintenance procedures or records could be provided to any of the generators quick closing valves. 74 Solas (2020) II-2/14.1.1 60ac
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 October 2025
Resolved 7 November 2025
Resolution: PSC NOLA received a internal audit from [name withheld] satisfying the requirement.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 September 2025 Resolved
The arrangements for the storage distribution and utilization of oil used in pressure lubrication systems shall be such as to ensure that safety of the ship and persons onboard. PSCO observed the engineer cleaning the deck below the pneumatic directional control valve for the main engine where it was found leaking. 74 SOLAS (2020) II-2/4.2.3.1 60ac
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 October 2025
Resolution: Reviewed and accepted class report from BV. The report stated nut has been replaced and tightened Test satisfactory.
99 - Other › N/A - No Subsystem › Other (SOLAS operational)
Issued 30 September 2025 Resolved
The conditions of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. PSCO observed approximately two feet of water in the bilge pockets. It was found that multiple packing glands on pumps and valves were leaking excessively. 74 SOLAS (2020) I/11(a) 60ac
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 October 2025
Resolution: Reviewed and accepted class report from BV. The report stated water was removed and leaking packing glands have been replaced. No leakage observed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 30 September 2025 Resolved
The conditions of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. PSCO observed the bosun hole had excessive gear adrift. 74 SOLAS (2020) I/11(a) 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 October 2025
Resolution: Reviewed and accepted class report from BV. The report stated that Bosun store has been cleaned and secured.
14 - Pollution Prevention › 145 - MARPOL Annex V › Garbage management plan
Issued 30 September 2025 Resolved
Every ship of 100 Gross tonnage and above and every hip which is certified to carry 15 or more persons and fixed and floating platforms shall carry a garbage management plan which the crew shall follow. The plan shall provide written procedures for minimizing, collecting, storing, processing, and disposing of garbage including the use of equipment on board. It shall also designate the person or persons in charge of carrying out the plan such a plan shall be based on the guidelines developed by the organization and written in the working language of the crew. PSCO observed bags of oily rags and paint on the outboard side of the cylinder oil settling tank and the lube oil settling tank. Additionally, there were buckets of oil in containment on the port side bunkerline containment. Garbage was notable all throughout the deck walk ranging from stern, cargo deck, and bosun hole. MARPOL V/10.3 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 October 2025
Resolution: Reviewed and accepted class report from BV. The report stated trash has been removed and cleaned of cargo residues.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 30 September 2025 Resolved
Doors required to be self-closing shall not be fitted with hold back hooks. However, hold back arrangements fitted with remote release devices of the fail safe type may be utilized. PSCO observed the two A-60 boundaries to the steering gear compartment lodged open with a pole and the other was tied open with a line. Additionally, on the third deck port side door was found with a line tied to it. 74 SOLAS (2020) II-2 9/4.2.2 10 c
Action required: 10 - Deficiency Rectified
Resolved 30 September 2025
Resolution: PSCO observed the deficiency corrected while onboard.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 24 September 2025 Resolved
Fire fighting systems and appliances shall be kept in good working order and readily available for immediate use. PSCO observed inadequate pressure from forward fire hose as well as an excessive leak and smoke when testing the emergency fire pump. 72 SOLAS (cons) ||-2/14.2.1.2, 60ac
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 26 September 2025
Resolution: Received, reviewed and accepted class report from BV. Emergency fire pump tested to the satisfaction of attending surveyor.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 24 September 2025 Resolved
Every inflatable life raft...shall be serviced at intervals not exceeding 12 months, provided where is any case this is impracticable, the administration may extend this period to 10 months. PSCO observed that documentation could not be produced showing that an annual life raft inspection was completed as well as the chief officer stating they do not have the testing kit available on board. 72 SOLAS (cons) |||/20.8.1.1, 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 September 2025
Resolution: Received, reviewed and accepted class report from BV. Provided all servicing documentation to the satisfaction of attending surveyor.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 24 September 2025 Resolved
Every steam pipe and every fitting connected thereto through which steam may pass shall be so designed, constructed, and installed as to withstand the maximum working stresses. PSCO observed water/steam leaking from the water fill valve running down insulation and steaming off. 72 SOLAS (cons) ||-1/33.1, 50ac
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 October 2025
Resolved 26 September 2025
Resolution: Received, reviewed and accepted class report from BV. Steam valve replaced to the satisfaction of attending surveyor.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 24 September 2025 Resolved
The company should establish procedures to ensure the ship is maintained in accordance with the provisions of the relevant rules and regulations established by the company. The technical and operational nature of deficiency 01, 02, and 03, issued on 24 September 2025, provide objective evidence of a failure, or lack of effectiveness, of the implementation of the ISM case. An internal safety management audit shall be carried out within 90 days. 74 SOLAS (cons) |X/X, ISM Code 10.1, ac
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 December 2025
Resolved 7 January 2026
Resolution: ISM audit report completed and received
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 10 September 2025 Resolved
The arrangements for the utilization of oil used in pressure lubrication systems shall be such as to ensure safety of the ship and persons on board. PSCO observed excessive oil leak from turbo oil discharge line on #2 generator. 74 SOLAS (04) II-2/4.2.3.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 September 2025
Resolution: Received class report attesting to proper repair of leaking oil pipe. Attended vessel and confirmed no leaks detected. Repair and reports are sufficient; vessel is clear to depart.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company responsibility and authority
Issued 23 May 2025 Resolved
The company and the ship shall comply with the requirements of the ISM Code. The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations. The company should ensure: appropriate corrective action is taken. PSCO observed, during an expanded exam, the following: failure of the company and the ship to properly manage failing equipment, to include: INMARSAT-C, emergency fire pump, sanitary accommodations, and maintain proper security records. An external ISM audit is required prior to release from the detention. 74SOLAS(24) IX/3.1 ISM Code 10 30abc
Action required: 30 - Ship detained
Resolved 25 May 2025
Resolution: Vessels class surveyor provided external audit report completed on 24MAY25.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 23 May 2025 Resolved
The company should ensure that all personnel involved in the company's safety management system have an adequate understanding of relevant rules, regulations, codes and guidelines. PSCO observed that the Master and [name withheld] (the designated Ship Security Officer) were not familiar with proper security exercise and drill record keeping. 74SOLAS(24) IX/3.1 ISM Code 6.4 17abc
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 May 2025
Resolution: C/O and Master were interviwed concerning security log and record keeping. They were able to produce records with satisfactory understanding.
11 - Life Saving Appliances › N/A - No Subsystem › Evaluation, testing and approval
Issued 23 May 2025 Resolved
Every inflatable life raft… shall be serviced: at intervals not exceeding 12 months… PSCO observed that for the port, starboard, and forward life rafts, which were of the extended servicing type, the ship did not have any record of shipboard servicing at the 12 month interval. 74SOLAS(24) III/20.8.1 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 May 2025
Resolution: Servicing records were provided for all life rafts
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 23 May 2025 Resolved
The machinery… and associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended… PSCO observed a significant leak from an expansion joint in the fire main in the BOSN store. 74SOLAS(04) II-1/26.1 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 May 2025
Resolution: valve bolt connections were found loose and retighten. Fire main run and eductor valve opened and no leaks were observed.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 23 May 2025 Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. PSCO observed that the emergency fire pump was mis-configured, resulting in damage to the packing gland which burned and caused the space to fill with smoke. Once the packing gland had been loosened, the emergency fire pump leaked excessively. 74SOLAS(09) II-2/14.2.1.2 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 May 2025
Resolution: new packing gland was installed too tight on 17MAY25 and was never loosened. Packing gland was adjusted and no leaks were observed.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 23 May 2025 Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. PSCO observed that the control for the fixed-foam extinguishing system was set to manual operation, which was contrary to ship’s procedures, and was not available for immediate use. 74SOLAS(09) II-2/14.2.1.2 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 May 2025
Resolution: Foam control unit was set back to remote and attending surveyor verified there were no issues with the system.
09 - Working and Living Conditions › 091 - Living Conditions › Sanitary Facilities
Issued 23 May 2025 Resolved
Sanitary accommodation shall comply with the following requirements: water closets provided with an ample flush of water, available at all times and independently controlled. PSCO observed that three toilets in the B Deck lavatory that did not flush. PWSA 46 U.S.C. 70002 ILO 147, pg. 37 / 21(f) 50ac
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 25 June 2025
Resolution: Surveyor checked and found all toilets to be in satisfactory condition.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 23 May 2025 Resolved
The machinery, boilers, and other pressure vessels and associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces and other hazards. PSCO observed open tank top to cascade tank, exposing hot surfaces and steam, and presenting a danger to persons on board. 74SOLAS(04) II-1/26.1 50ac
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 25 June 2025
Resolution: securing devices on the top plate had been renewed and covers and moving parts on top were properly secured.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 May 2025 Resolved
The master, owner, operator, agent, or person in charge of any vessel equipped with ballast water tanks that operates in the waters of the United States must follow these practices: Maintain a ballast water management (BWM) plan that has been developed specifically for the vessel and that will allow those responsible for the pan's implementation to understand and follow the vessel's BWM strategy and comply with the requirements of this subpart. The plan must include - actions for implementing the mandatory BWM requirements and practices. PSCO observed that procedures for using the installed BWM system were not implemented in the vessel's BWM plan. 33 C.F.R. 151.2050(g)(2) 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 June 2025
Resolution: All mandatory BWM requirements and practices have been compiled into a single plan. BV approved new plan
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 23 May 2025 Resolved
Each operation described in paragraph 2 of this regulation shall be fully recorded without delay in the Oil Record Book Part I, so that all entries in the book appropriate to that operation are completed. PSCO observed that the Chief Engineer had not completed an internal tank transfer entry in the Oil Record Book without delay, as required. Chief Engineer made corrections to Oil Record Book during exam. MARPOL I/17.4 10c
Action required: 10 - Deficiency Rectified
Resolved 23 May 2025
Resolution: C/E made missed entry in ORB.
09 - Working and Living Conditions › 091 - Living Conditions › Water, pipes, tanks
Issued 23 May 2025 Resolved
Sanitary accommodation shall comply with the following requirements: cold fresh water and hot fresh water available in all wash spaces. PSCO observed that no wash spaces onboard the vessel had hot fresh water available. Hot water was restored during exam. PWSA 46 U.S.C. 70002 ILO 147, pg. 37 / 21(c) 10c
Action required: 10 - Deficiency Rectified
Resolved 23 May 2025
Resolution: Hot water was restored during exam.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 31 March 2025 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed twisting movement of the steering ram while conducting steering test locally and control from the bridge. 74SOLAS(24)I/11(a) 60ac
Action required: 60 - Rectify deficiencies prior to movement
Resolved 2 April 2025
Resolution: Recieved class report attesting to satisfactory opperation of the steering gear equipment. CoC issued requiring additional replacement of parts at next port.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 31 March 2025 Resolved
Bilge wells in periodically unattended machinery spaces shall be located and monitored in such a way that the accumulation of liquids is detected at normal angles of trim and heel, and shall be large enough to accommodate easily the normal drainage during the unattended period. PSCO observed forward port bilge alarm in engine room inoperable.74SOLAS(04)II-1/ 48.1 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 April 2025
Resolution: Received class report attesting to satisfactory repairs. See documents.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 31 March 2025 Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. PSCO observed excessive water leakage from emergency fire pump packing gland during operational test. 74SOLAS(24)II-2/ 14.2.1.2 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 April 2025
Resolution: Received class report attesting to satisfactory repairs. See documents.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 31 March 2025 Resolved
Each operation described in paragraph 2 of this regulation shall be fully recorded without delay in the Oil Record Book Part 1, so that all entries in the book appropriate to that operation are completed. PSCO observed that OWS overboard discharge recordings that were completed between 15MAR25 and 29MAR25 in the ORB did not match specifications of the OWS maximum throughput in the IOPP Supplement, and several entries had incorrect usage of codes. MARPOL I/17.4 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 April 2025
Resolution: Received class report attesting to satisfactory repairs. See documents.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 31 March 2025 Resolved
The company and the ship shall comply with the requirements of the International Safety Management Code. The company should establish and maintain procedures for identifying any training which may be required in support of the safety management system and ensure that such training is provided for all personnel concerned. PSCO observed during an expanded exam the following; failure of the crew to properly operate the OWS within the required maximum throughput amount due to lack of familiarity with equipment on board, and lack of operational readiness following testing of the watermist system in the purifier space. An internal ISM audit is required within 3 months of the date of the exam. 74SOLAS(24)IX/3.1 ISM Code 6.5
Action required: 705 - Other - as specified
Due 1 July 2025
Resolved 1 July 2025
Resolution: vessel completed internal ISM audit.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 31 March 2025 Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. PSCO observed plastic bags covering watermist nozzles in purifier space over fuel oil purifiers that were not removed after previous system tests. 74SOLAS(24)II-2/ 14.2.1.2 10c
Action required: 10 - Deficiency Rectified
Resolved 31 March 2025
Resolution: crew removed plastic bags from nozzles
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 22 March 2024 Resolved
Doors fitted in boundary bulkheads of machinery spaces of category "A" shall be reasonably gas tight and self-closing. PSCO observed that the fire doors in the boundary bulkhead and in the escape trunk in the engine room did not self-close and latch shut. 74SOLAS(09) II-2/9.4.2.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 March 2024
Resolution: Received class report attesting to proper repair.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 22 March 2024 Resolved
General arrangement plans shall be permanently exhibited for the guidance of the ship's officers, showing clearly for each deck the control stations, the various fire stations enclosed by "A" class divisions, and sections enclosed by "B" class divisions. PSCO observed that doors to the fire locker and to the galley were not self-closing A-60 boundary doors as required by the fire control plan. 74SOLAS(09) II-2/15.2.4.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 May 2024
Resolution: Recieved class report from vessel master via email, attesting to the required repairs.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 22 March 2024 Resolved
Means for controlling flammable liquids in a space shall be provided. PSCO observed excessive pooling of flammable liquids at F.O. circulation pumps #1 and #2. 74SOLAS(09) II-2/5.1.2
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 May 2024
Resolution: Recieved class report from vessel master via email, attesting to the required repairs.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 22 March 2024 Resolved
The boilers, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are inteded and shall be so installed and protected as to reduce to a minimum the danger to personnel on board. PSCO observed steam leaks at two locations on the boiler. 74SOLAS(09) II-2/26.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 May 2024
Resolution: Recieved class report from vessel master via email, attesting to the required repairs.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 22 March 2024 Resolved
Surfaces with temperatures above 220 degrees C which may be impinged as a result of a fuel system failure shall be properly insulated. PSCO observed damaged lagging on the F.O. return lines from each cyliner of the Main Engine. 74SOLAS(09) II-2/4.2.2.6.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 May 2024
Resolution: Recieved class report from vessel master via email, attesting to the required repairs.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 31 January 2020 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present convention to ensure that the ship in all respects will remain fit to proceed to sea without presenting an unreasonable harm to the marine environment. PSCOs noted that the vessel's incinerator is inoperable. MARPOL Annex I Reg. 6.4.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 February 2020
Resolution: PSCO witnessed sat repair of incinerator and verified unit was operational.
Operations/Management › Ballast Water Managment › Mandatory Practices
Issued 13 December 2016 Resolved
The master, owner or operator is responsible for removing fouling organisms from the vessel's hull on a regular basis. PSCOs observed significant marine growth on hull near and below the waterline. 40c
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 13 December 2016
Resolved 26 February 2017
Resolution: 2/26/17- Recieved Hull Cleaning report from vessel. Cleared def. Report can be found in documents.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.