MAURY USCG vessel records
← All vessels

MSC MARINA

MSC MARINA is a 2003 freight ship. The Coast Guard has recorded 28 inspections since 2016, most recently in May 2026, along with 24 deficiencies and 4 operational controls, 1 with no removal date recorded.

Records from 2016 to 2026. Most recent: inspection, 5 May 2026.

Built
2003
Last inspected
5 May 2026
Documentation
Not in the documentation file of 10 August 2026
Controls
1 with no removal date recorded

Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls and the documentation record — is Professional, $39 a month. Sign in.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 5 May 2026
…with no type recorded3
Operational controls 1 with no removal date recorded
Years with a record 9 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9275971
816342
Flag
PANAMA
Maury page id
psix-816342

Documentation record

Tonnage as PSIX records it73819 - Convention (Subpart B), Gross Ton
47138 - Convention (Subpart B), Net Ton
85806 - Dead Weight, Metric Ton
112636 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
Detail on this page

28 inspections, each with its date, unit and type; 24 deficiencies with the resolution recorded against each; 4 operational controls with the dates imposed and removed; the documentation record, as PSIX holds it. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 28

5 May 2026 In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8361670
30 April 2026 Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8358553
30 April 2026 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8358680
22 April 2026 PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8346942
20 September 2025 PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8237582
25 August 2024 PSC B
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7980301
26 September 2023 PSC A
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7798990
17 July 2023 Appeal
Administrative · Commandant (CG-CVC) · Activity 7744426
29 April 2023 PSC A
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7676861
24 April 2023 PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7674865
22 April 2023 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7673304
21 April 2023 PSC B · MARPOL Annex I Examination · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7672805
14 April 2023 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7668670
13 February 2023 Deficiency Check · PSC B
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7635903
10 September 2022 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7555731
29 July 2022 PSC B · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7516335
23 January 2022 PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7383053
23 August 2021 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7293312
18 June 2021 PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7229141
8 November 2018 ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6577091
9 September 2018 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6550670
26 December 2017 Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6328888
8 November 2017 Random ISPS/MTSA/PSC · Ballast Water Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6303102
1 November 2017 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6298995
5 September 2017 Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6259571
1 July 2017 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6192540
12 June 2016 Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5904741
1 June 2016 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 5887167

Deficiency record · 24

07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 22 April 2026 Resolved
The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. PSCO observed fuel leaking from M/E cylinders #2,3,4,5,and 6. SOLAS(24) II-2/45.1.1 Code 16ac
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 May 2026
Resolved 30 April 2026
Resolution: Gaskets were replaced to address the fuel leaks. (See RO Report)
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 22 April 2026 Resolved
The machinery....associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts. PSCO observed all purifiers missing belt access covers. SOLAS(04) II-1/26.1 Code: 10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 22 April 2026
Resolved 22 April 2026
Resolution: Crew corrected on spot.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 24 April 2023 Resolved
Means shall be provided to control leaks of flammable liquids. PSCO observed excessive F/O leaks from the MGO transfer pump and VLSFO transfer pump and oil soaked lagging
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 May 2023
Resolution: Received class report attesting to repairs and cleaning of the transfer pumps.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 24 April 2023 Resolved
The arrangements for the storage, distribution and utilization of oil in pressure lubrication system shall be such as to ensure the safety of the ship and persons onboard. PSCO observed excessive L/O leaks from the No: 3 and 4 air compressor motors.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 May 2023
Resolved 10 May 2023
Resolution: Air compressors were maintained/overhauled, oil leakages eliminated. No objection from Class.
14 - Pollution Prevention › 141 - MARPOL Annex I › 15 PPM Alarm arrangements
Issued 24 April 2023 Resolved
In considering the design of such equipment and approvals, the administration shall have regard to the specification recommended by the organization. MEPC.107(49)/1.1.5 requires ship. Staff training should include familiarization in the operation and maintenance of the equipment.
Action required: 10 - Deficiency Rectified
Resolved 27 April 2023
Resolution: Chief Engineer was trained on the differences between the maintenance procedures and test procedures that were to be conducted at the time of the exam.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 21 April 2023 Resolved
The company should establish procedures, plans and instructions, including checklists as appropriate. PSCO's identified multiple areas of oil accumulation around the engine room. Standing oil was observed on main engine and in the purifier room. Several plastic buckets cut to fit under machinery are in use to collect dripping oil, and several metal deflecting plates are in place to deflect spraying oil. These deflection plates are located on the main engine and in the purifier space. Oil-soaked lagging was also discovered in these areas. After reviewing the vessel's "[name withheld]", Line item 6 refers to addressing excessive oil accumulation and line item 11 refers to keeping the engine room in an excellent condition. Additionally, the injectors and fuel pumps have exceeded their maximum running hours per the vessels SMS: fuel injectors to cylinders 1, 4 and 8; fuel pump to cylinder 1. An external SMS audit is required.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 24 April 2023
Resolution: See audit/survey report in documents.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 21 April 2023 Resolved
Means shall be provided to control leaks of flammable liquids. PSCO’s identified multiple areas of oil accumulation around the engine room. Standing oil was observed on main engine an in the purifier room. Several plastic buckets cut to fit under machinery are in use to collect dripping oil. Additionally, several metal deflection plates were put in place by the crew to deflect spraying oil into buckets. These deflection plates are located on the main engine and in the purifier space. Oil soaked lagging was also discovered in these areas.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 24 April 2023
Resolution: See audit/survey report in documents.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 21 April 2023 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the relevant regulations. PSCO’s observed significant leakage of the jacket water main engine cylinder number 5.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 April 2023
Resolution: See audit/survey report in documents.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 21 April 2023 Resolved
Every steam pipe and every fitting connected there to … shall be so designed, constructed and installed as to withstand the maximum working stress … PSCO’s observed active steam leak from piping in vicinity od diesel engines number 3 and 4.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 April 2023
Resolution: See audit/survey report in documents.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 21 April 2023 Resolved
In considering the design of such equipment and approvals the administration shall have regard to the specifications recommended by the organization. MEPC .107(49) / 4.2.10.1 requires the presence of a seal to avoid willful manipulation of the system. There is no seal present.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 April 2023
Resolution: DEFICIENCY REISSUED IN NEW TAB WITH REQUIREMENT OF 14 DAYS AT THE DIRECTION OF SSO [name withheld].
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 21 April 2023 Resolved
Doors required to be self-closing shall not be fitted with hold back hooks. Both fire screen doors to purifier space are identified as self-closing on the FCP. Both were found tied open. Purifier space was found to have excessive leaks and accumulation of flammable liquids.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 April 2023
Resolution: See audit/survey report in documents.
02 - Structural Conditions › N/A - No Subsystem › Safe access to tanker bows
Issued 21 April 2023 Resolved
Oil fuel pipes … shall be fitted with a cock or valve directly on the tank capable of being closed from a safe position outside of the space concerned. Valve from HFO tank to boiler found to have its quick closing valve disconnected. Crew states that the tank is no longer in service.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 24 April 2023
Resolution: See audit/survey report in documents.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 21 April 2023 Resolved
In considering the design of such equipment and approvals the administration shall have regard to the specifications recommended by the organization. MEPC .107(49) / 4.2.10.1 requires the presence of a seal to avoid willful manipulation of the system. There is no seal present.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 May 2023
Resolved 17 September 2023
Resolution: TPO report received cert that it's repaired.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 13 February 2023 Resolved
EACH EMERGENCY GENERATING SET ARRANGED TO BE AUTOMATICALLY STARTED SHALL BE EQUIPPED WITH STARTING DEVICES APPROVED BY THE ADMINISTRATION WITH A STORED ENERGY CAPABILITY OF AT LEAST THREE CONSECUTIVE STARTS. A SECOND SOURCE OF ENERGY SHALL BE PROVIDED FOR AN ADDITIONAL THREE STARTS WITHIN 30 MIN UNLESS MANUAL STARTING CAN BE DEMONSTRATED TO BE EFFECTIVE. PSCO OBSERVED EMERGENCY GENERATOR WAS UNABLE TO START BY PRIMARY AND SECONDARY MEANS.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 February 2023
Resolution: Diaphram on starting air system and batteries of secondary starting system replaced. DNV Surveyor observed Emergency generator start by both means and run in good working order
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 29 July 2022 Resolved
The main inlets and outlets of all ventilation systems shall be capable of being closed from outside the spaces being ventilated. PSCO observed the natural ventilation closure on bay 22 starboard side is bent and will not close properly.
Action required: 10 - Deficiency Rectified
Due 12 August 2022
Resolved 18 August 2022
Resolution: Repairs were completed to cargo hatch ventilation cover. Closure now opens, closes, and seals properly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 29 July 2022 Resolved
Ships shall be maintained in compliance with the mechanical requirements of a classification society which is recognized by the Administration in accordance with the provisions of regulation XI-1/1, or with applicable national standards of the Administration which provide an equivalent level of safety. PSCO observed oil leak originating from #3 generator casing.
Action required: 10 - Deficiency Rectified
Due 28 August 2022
Resolved 18 August 2022
Resolution: Generator was cleaned, sealed, and repainted and no longer leaks from the casing.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil discharge monitoring and control system
Issued 8 November 2018 Resolved
2110- EACH OPERATION DESCRIBED IN PARAGRAPH 2 OF THIS REGULATION SHALL BE FULLY RECORDED WITHOUT DELAY IN THE OIL RECORD BOOK PART I. THROUGHPUT VALVE WAS EXCEEDED AUG 02, 2018 AND SEP 29, 2018 ON OWS. MARPOL I/17.4, 40abc.
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 November 2018
Resolved 18 June 2021
Resolution: Verified proper recording of the OWS in the ORB.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil discharge monitoring and control system
Issued 8 November 2018 Resolved
2110 THE 15 PPM BILGE ALARM SHOULD RECORD DATE, TIME, AND ALARM STATUS, AND OPERATIONS STATUS OF THE 15 PPM BILGE SEPARATOR. OIL CONTENT METER IS NOT RECORDING AS STATED. MARPOL I/14.6, MEPC.107(49)/4.2.9. 40ac
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 November 2018
Resolved 18 June 2021
Resolution: Vessel had OCM calibrated. See documents.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 8 November 2018 Resolved
1599- THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DAMAGE TO THE SHIP OR PERSONS ON BOARD. PSCO OBSERVED RUDDER DRIFTING THREE DEGREES PORT DURING EMERGENCY STEERING TEST ON #2 PUMP. 74SOLAS(14)I/11(a). 40ac
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 November 2018
Resolved 18 June 2021
Resolution: PSCDO conducted emergency steering test no discrepancies noted.
01 - Certificates & Documentation › 011 - Ships Certificates › International Oil Pollution Prevention (IOPP)
Issued 8 November 2018 Resolved
2110 - IOPP SHALL BE DRAWN UP IN THE FORM CORRESPONDING TO MODEL IN APPENDIX II. IOPP FORM A LISTS OWS AS MEPC.107. OWS INSTALLED IS MEPC.60 PER PLAQUE AND MANUFACTURER DOCUMENTATION. MARPOL I/9. 40ac
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 November 2018
Resolved 18 June 2021
Resolution: Vessel ammended IOPP. See documents.
Fire Fighting › Automatic Sprinkler System › Connection to Fire Main
Issued 8 November 2017 Resolved
SOLAS 74 (2014 CONS.) II-2/10.6.2: AN AUTOMATIC SPRINKLER SYSTEM SHALL BE SO INSTALLED AS TO PROTECT SERVICE SPACES. THE WATER MIST SYSTEM FOR THE ENGINE ROOM WAS SET IN MANUAL POSITION. 10c
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 8 November 2017
Resolved 8 November 2017
Resolution: Crew switched pump from HAND back to AUTO function.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 8 November 2017 Resolved
SOLAS 74 (2014 CONS.) II-2/4.1.1: MEANS SHALL BE PROVIDED TO CONTROL LEAKS OF FLAMMABLE LIQUIDS. BENEATH THE MAIN ENGINE AND EMERGENCY GENERATOR THERE WAS EXCESSIVE OIL AS WELL AS OIL SOAKED LAGGING ON THE MAIN ENGINE. 16c
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 November 2017
Resolved 26 December 2017
Resolution: Recieved and reviewed Class report attesting to the correction of deficiency.
Fire Fighting › Fixed Fire Detection System › Flame Detectors
Issued 8 November 2017 Resolved
SOLAS 74 (2014 CONS) IX/3.1; ISM CODE 10.3: THE SAFETY MANAGEMENT SYSTEM SHOULD PROVIDE FOR SPECIFIC MEASURES AIMED AT PROMOTING THE RELIABILITY OF EQUIPMENT. FLAME DETECTORS WERE BEING TESTED WITH OPEN FLAME.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 December 2017
Resolved 26 December 2017
Resolution: Recieved and reviewed Class report attesting to the correction of deficiency.
Lifesaving › Rocket Parachute Flares › General
Issued 1 June 2016 Resolved
Not less than 12 rocket parachute flares shall be stowed on or near the navigational bridge. Vessel only had 11. The Second Mate found an expired flare two months ago, that was over 12 months out of date. SOLAS 14 Ch. III Reg. 6.3 40(c)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 June 2016
Resolved 12 June 2016
Resolution: PSC NOLA recieved the technician report from Panama PSC satisfying the requirment.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.