Records from 2016 to 2026. Most recent: inspection, 28 May 2026.
Inspection history · 32
28 May 2026
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8382865
11 May 2026
COC-CVE Annual · PSC A
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8369216
15 November 2025
COC-CVE Quarterly · PSC B
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8267934
16 May 2025
Deficiency Check · PSC A · COC-CVE Annual
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8136433
13 May 2025
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8134860
17 November 2024
COC-CVE Quarterly · PSC B
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8035758
17 May 2024
PSC A · COC-CVE Annual
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7913549
9 April 2024
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7892272
28 December 2023
MARPOL Annex I Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7843214
7 November 2023
COC-CVE Quarterly · PSC B
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7821459
5 June 2023
PSC A · COC-CVE Annual
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7702981
9 January 2023
COC-CVE Quarterly · PSC B
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7616258
14 August 2022
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7533092
13 June 2022
Ballast Water Examination · Deficiency Check · PSC A · COC-CVE Annual
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7472651
13 December 2021
COC-CVE Quarterly · Ballast Water Examination · PSC B
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7364721
18 June 2021
ISPS Exam · COC-CVE Annual · Ballast Water Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7231664
16 April 2021
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7176708
6 April 2020
In-Service Inspection
Physical examination · USCG Southeast District (dpw) · USCG Southeast District (CGD-SE) · Activity 6936068
20 March 2020
In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6926014
8 September 2019
Ballast Water Examination · COC-CVE Quarterly · ISPS II Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6805326
10 July 2019
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6744568
10 March 2019
ISPS III Exam · COC-CVE Annual · Ballast Water Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6637014
10 December 2018
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6595058
17 November 2018
In-Service Inspection
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6582441
15 September 2018
Ballast Water Examination · COC-CVE Quarterly · ISPS III Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6540264
17 March 2018
ISPS III Exam · Deficiency Check · COC-CVE Annual · Ballast Water Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6372569
6 December 2017
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6319384
9 November 2017
COC-CVE Quarterly · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6304322
14 March 2017
ISPS II Exam · COC-CVE Annual · Ballast Water Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6104637
21 September 2016
COC-CVE Quarterly · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 6006250
2 May 2016
Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 5867210
17 March 2016
COC-CVE Annual · ISPS III Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 5835130
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 11 May 2026
Resolved
The following functional requirements shall be met escape routes shall be maintained in a safe condition, clear of obstacles. Automatic door on starboard forward to embarkation deck was set local mode and did not open not allowing passengers to reach the lifeboats.
74 SOLAS 20 II-2/13.1.2
17ac
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 May 2026
Resolution: Crew electrician placed door in automatic mode to ensure safe evacuation through automatic door. Stated that it was place in local to be cleaned so it would open. Discuss with housekeeping procedures to ensure it gets changed back to automatic mode.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 11 May 2026
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. The helm steering did not work on Lifeboat 11. The hydraulic steering ram was leaking hydraulic oil.
74 SOLAS 20 III/20.2
17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 May 2026
Resolution: Crew replaced hydraulic ram seals and conducted steering test under USCG supervision to ensure fully functionalilty and effectiveness of repair.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 11 May 2026
Resolved
Fire protection systems and fire-fighting systems and appliances shall be maintained ready for use. Two CO2 bottles in CO2 room had pins installed rendering those bottles inoperable.
74 SOLAS 20 II-2/14.1.1
17ac
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 May 2026
Resolution: Crew removed pin from (02) CO2 bottles.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 11 May 2026
Resolved
Every crew member with assigned emergency duties shall be familiar with these duties before the voyage begins. Multiple lifeboat crews were unfamiliar with process to access fuel shutoff in event of fire.
74 SOLAS 20 III/19.2.1
17ac
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 May 2026
Resolved 25 May 2026
Resolution: Class Report attached.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 16 May 2025
Resolved
Means shall be provided to control leaks of flammable liquids. PSCOs observed the emergency diesel generator had a fuel leak from a cracked racor filter.
74 SOLAS 04 II-2/4.1.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 16 May 2025
Resolved 16 May 2025
Resolution: Replaced racor.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 16 May 2025
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces and other hazards. PSCOs observed previous nonconformity identified on port scrubber overboard discharge connection with excessive leak.
74 SOLAS 20 III/13.1.1
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 19 May 2025
Resolved 23 May 2025
Resolution: Repaired to the satisfaction of class and approved by PDH (Acting) to get underway. Permanent repairs scheduled to be complete on 19May25. (See narrative and documents)
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 16 May 2025
Resolved
Each survival craft shall be stowed so that neither the survival craft nor its storage arrangements will interfere with the operation of any other survival craft or rescue boat at any other launching station. PSCOs observed the forward davit launched liferaft stations were obstructed by the support bracket, catching the release hook on the liferaft davit hook which prematurely released the liferaft.
74 SOLAS 20 III 13.1.1
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2025
Resolved 19 May 2025
Resolution: Liferaft rails were cropped and welded at a higher angle to prevent hook from coming in contact while operating davit.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 16 May 2025
Resolved
Fire doors in main vertical zone bulkheads, galley boundaries and stairway enclosures, the approximate time of closure for hinged fire doors shall be no more than 40s and no less than 10s from the beginning of their movement. PSCOs observed fire doors 1.3.03, 1.3.28, 1.5.02, 2.5.01, and 4.8.10 did not meet closure time requirements.
74 SOLAS 20 II-2/9.4.1.1.5.2
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 May 2025
Resolved 19 May 2025
Resolution: All fire doors listed have been adjusted to meet the time requirements.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 13 June 2022
Resolved
An independent power pump shall be provided solely for the purpose of continuing automatically the discharge of water from the sprinklers. The pump shall be brought into action automatically by the pressure drop of the system. PSCOs witnessed pressure gauged in section valve drop to zero without activation of sprinkler pump.
SOLAS 20 II-2/10.4.1.1.3
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 June 2022
Resolution: Pump was replaced and was tested satisfactorily
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 13 June 2022
Resolved
Safe escape routes shall be provided. PSCOs observed one location in which there were room in room arrangements lacking immediate notification of a fire in the surrounding spaces to crew or passengers inside. Spaces included the gym.
SOLAS 20 II-2/13.1.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 July 2022
Resolved 28 July 2022
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 13 June 2022
Resolved
Escape doors from public spaces that are normally latched shall be fitted with a means of quick release..., in particular...not be equipped with any locking device, set screw, or other arrangement that prevents the release of the latch when pressure is applied... PSCOs observed locking devices in the escape routes from the Suite Lounge Deck 14 and Teen Center Deck 12.
SOLAS 20 II-2/13.3.2.6.2.3
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 July 2022
Resolved 28 July 2022
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 April 2021
Resolved
9101- Safety In General- Times for submitted NOAs are as follows: if your voyage time is less than 96 hours then you must submit a NOA before departure but at least 24 hours before arriving at the port or place of destination. On 16APR21 it was discovered that the vessel arrived into Port of Miami on 08APR21, but had failed to submit a NOA -33CFR160.212(a)(4)(ii)
Action required: 10 - Deficiency Rectified
Resolved 16 April 2021
Resolution: Vessel was notified of NOA requirements and given the MSIB 20-024.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 10 March 2019
Resolved
All survival craft required to provide for the abandonment by the total number of persons onboard shall be capable of being launched with their full complement of persons and equipment within a period of 30 minutes from the time the abandon ship signal is given. The crew was unable to bowse the aft station life raft for 7 minutes. The life raft launching station serves 4 life rafts. The second deployment of the forward station was 3 minutes and 20 seconds. 74 SOLAS (04) III/ Regulation 21 Chapter 1.1.4.
Action required: 10 - Deficiency Rectified
Resolved 10 March 2019
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 10 March 2019
Resolved
All engines in lifeboat and rescue boats shall be run for a total period of not less than 3 minutes provided the ambient temperature is above the minimum temperature required for stating and running the engine. Lifeboats 28 and 29 did not start at first attempt. 74 SOLAS (04) III/ Regulation 20 Chapter 6.2.
Action required: 10 - Deficiency Rectified
Resolved 10 March 2019
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 10 March 2019
Resolved
Doors shall be self-closing and be capable of closing with an angle of inclination of up to 3.5 degrees opposing closure. Fire Doors 11.7.12, 11.4.06, 9.4.07, and 9.8.02 need to be adjusted and 9.4.12. 74 SOLAS (74) II-2/Regulation 9 Chapter 4.1.1.4.1.
Action required: 10 - Deficiency Rectified
Resolved 10 March 2019
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 10 March 2019
Resolved
Escape routes shall be maintained in a safe condition, clear of obstacles. Plants blocked the exit on both sides of the Crown and Anchor Cloud 9 Bar. 74 SOLAS (04) II-2 Regulation 13 Chapter 1.2.
Action required: 10 - Deficiency Rectified
Resolved 10 March 2019
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 10 March 2019
Resolved
Hoses specified in this chapter as fire hoses shall together with any necessary fittings and tools be kept ready for use in conspicuous positions near the water service hydrants or connections. Additionally in interior locations in passenger ships carrying more than 36 passengers, fire hoses shall be connected to the hydrants at all times. Two hoses in the engine room and one in I-95 were not connected. 74 SOLAS (04) II-2/ Regulation 10 Chapter 2.3.1.1.
Action required: 10 - Deficiency Rectified
Resolved 10 March 2019
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 10 March 2019
Resolved
Escape routes be maintained in a safe condition, clear of obstacles. The arcade games were unsecured and could create a blocking hazard. 74 SOLAS (04) II-2/Regulation 13 Chapter 1.2.
Action required: 10 - Deficiency Rectified
Resolved 10 March 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 November 2018
Resolved
After any survey of the ship under regulations 7, 8, 9, or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment and other items covered by the survey, without the sanction of the administration. One of the four bow thrusters has been damaged by line/rope and is not operable. Temporary modifications/repairs to inoperable bow thruster planned for 18NOV2018.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 December 2018
Resolved 10 December 2018
Resolution: See attached survey report.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 17 March 2018
Resolved
0925 - Every crew member with assigned duties shall be familiar with these duties before the voyage begins. During USCG annual COC exam life-raft station #37 personnel failed to effectively deploy a 35 person life-raft during abandon ship drill - 74 SOLAS(2014) CH III/19.2.1 - 16C
Action required: 705 - Other - as specified
Due 31 March 2018
Resolved 25 March 2018
Resolution: PSC Miami attended vessel and witnessed a satisfactory davit launched life-raft deployment from station 37. All crewmembers with life-raft deployment assigned emergency duties conducted training and were present to witness life-raft deployment
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 18 March 2017
Resolved
0750-Category 10 spaces are prohibited from the stowage of combustibles. Pump room #2 port side contained 27 55 gallon drums of oil and chemicals. 74SOLAS(14) Reg.9.2.2.3.2.2
Action required: 705 - Other - as specified
Resolved 18 March 2017
Resolution: Drums were moved prior to Coast Guard inspectors departing the vessel.
Communications › Alarms/Indicators › Fire Alarm
Issued 20 March 2016
Resolved
0720 - FIRE FIGHTING EQUIPMENT - FIRE SAFETY SYSTEMS SHALL BE INSTALLED TO PROTECT SPACES COMPLYING WITH THE FSS CODE. HEAT DECTOR G0005 IN THE WINDJAMMER GALLEY DID NOT OPERATE.
Action required: 705 - Other - as specified
Due 3 April 2016
Resolved 28 April 2016
Resolution: Inoperable heat detector was replaced
Fire Fighting › Fire Pumps › Arrangement
Issued 20 March 2016
Resolved
0720 - FIRE FIGHTING EQUIPMENT - SHIPS SHALL BE PROVIDED WITH FIRE PUMPS COMPLYING WITH THE APPLICABLE REQUIREMENTS OF THIS REGULATION. FIRE PUMP THREE IS FITTED WITH A DOUBLER ON THE SPOOL PEICE ON THE DISCHARGE OF THE PUMP.
Action required: 705 - Other - as specified
Due 19 April 2016
Resolved 28 April 2016
Resolution: Vessel provided Class Report and pictures attesting to replacement of fire pump spool piece
Fire Fighting › Fire Hydrants › Condition
Issued 20 March 2016
Resolved
0720 - FIRE FIGHTING EQUIPMENT - SHIPS SHALL BE PROVIDED WITH FIRE HYDRANTS COMPLYING WITH THE APPLICABLE REQUIREMENTS OF THIS REGULATION. FIRE STATION VALVES NEED PREVENTATIVE MAINTENANCE.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 April 2016
Resolved 28 April 2016
Resolution: Master provided statement documenting new company procedures for monthly inspections of fire hydrants
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 20 March 2016
Resolved
0900 - SAFETY IN GENERAL - VENTS MUST BE DESIGNED AND CONSTRUCTED TO MINIMIZE CLOGGING BY EITHER THE CONTENTS OF TANK. NUMBER ONE PORT SEWAGE HOLDING TANK VENT IS LEAKING.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 19 April 2016
Resolved 28 April 2016
Resolution: Master provided statement and pictures attesting to replacement of overflow pipe gasket and drain valve.