Records from 2006 to 2022. Most recent: inspection, 7 February 2022.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderWEST GULF MARINE · GALVESTON, TX, UNITED STATES · built 2006
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portWILMINGTON, DE
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 21 October 2025 · expires 30 November 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Gross Ton
1619 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 23
7 February 2022
MTSA Verification · COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7388488
15 January 2019
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6646752
18 January 2018
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6357094
4 January 2018
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6334251
27 March 2017
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6112170
13 December 2016
Damage Survey · MTSA Verification · COI Inspection · Internal Structural Exam · Cargo Tank Internal · Drydock Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6057348
1 March 2016
Administrative Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5824973
3 February 2016
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5868203
5 October 2015
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5869043
3 October 2014
MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5058351
22 October 2013
Periodic Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4738344
20 December 2012
Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4504984
18 December 2012
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4563940
9 November 2012
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4481332
22 November 2011
MTSA Verification · COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4190528
3 September 2010
Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3868503
12 February 2010
Examination of Repairs
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3681022
14 January 2010
Periodic Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3662138
16 April 2008
Damage Survey
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3191058
2 December 2007
Administrative Inspection
Administrative · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3108215
10 September 2007
Annual Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3071892
25 September 2006
Cargo Tank Internal · Hull Examination · Construction Oversight · COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2793140
24 May 2006
Security Plan Amendment Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2657852
Construction/Loadline › Hull › Hull Plating
Issued 3 February 2016
Resolved
D8 TBSIP SELF-REPORTED DEFICIENCY. Make permanent repairs to transom, where deck and transom plate come together. Approx. 17 feet from port side of barge and 4 feet from water while loaded. Fracture measures approx. 4.5 inches long x .250 inches wide.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 19 March 2016
Resolved 1 March 2016
Resolution: Repairs completed to the satisfaction of the attending marine inspector.
Construction/Loadline › Hull › Bottom Plating
Issued 9 November 2012
Resolved
TBSIP self reported def. Make permenant repairs to 6"X1/8" FRACTURE IN THE PORT BOW CORNER WRAP ON BARGE AT THE TIMBERHEADS.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 21 December 2012
Resolved 18 December 2012
Resolution: Witnessed Air test of gouged and welded port bow corner wrap.
Construction/Loadline › Hull › Hull Plating
Issued 14 January 2010
Resolved
Inset located on deck gunwale of #4 port void, approximately 30 inches aft of bulkhead. Inset was approximately 4' x 24" x 4'.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 February 2010
Resolved 12 February 2010
Resolution: Visually examined and witnessed air test of 4'' gunwale insert in #4 port wing void. All tests sat.