Records from 2016 to 2026. Most recent: inspection, 6 April 2026.
Documentation record
Registered dimensions (L × B × D)34.0 ft × 11.0 ft × 3.7 ft
Registered tonnagegross 9 / net 7
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCUSTOM WELD BOATS INC · LEWISTON, ID, UNITED STATES · built 2006
Hull materialAluminum
PropulsionJet Drive
Hull shapeShip
Hull configurationMonohull
Hailing portCLARKSTON, WA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 25 February 2026 · expires 31 March 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it9 - Simplified, Gross Ton
7 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 13
6 April 2026
COI Inspection · Hull Examination
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8343864
21 April 2025
Deficiency Check · Annual Inspection · DAPI Audit
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8109561
23 April 2024
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7903956
26 April 2023
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7716034
22 April 2022
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7447762
14 March 2022
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7490904
16 March 2021
Deficiency Check · Hull Examination · COI Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7152077
31 July 2020
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7021316
7 May 2020
Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6949882
20 March 2019
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6643417
6 March 2018
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6362151
8 March 2017
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6098687
21 April 2016
COI Inspection · Hull Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 5851516
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 April 2026
No resolution recorded
The indicator light required by 46CFR182.530(c) for the auto bilge pump for he engine room does not work/indicate the pump is operating. Owner to make it function properly and provide proof to the MI.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 April 2026 — due date passed with no resolution recorded
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 6 April 2026
No resolution recorded
Vessel name was missing from the port side bow. The name of the vessel must be marked on some clearly visible exterior part of the port and starboard bow and the stern of the vessel. Owner to ensure name is placed on the vessels exterior and provide proof to the MI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2026 — due date passed with no resolution recorded
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 April 2025
Resolved
The marine employer must have a sufficient number of alcohol testing devices readily accessible on board the vessel to determine the presence of alcohol in the system of each individual who was directly involved in the SMI.
Vessel did not have alcohol test strips on board.
Obtain proper testing device or stay within 2 hrs of testing facility in case of testing need.
46 CFR 4.06-15(a)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2025
Resolved 22 May 2025
Resolution: Test strips were placed on board.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 April 2021
Resolved
A drip pan fitted with flame screen must be installed under gasoline strainers. No flame screens were identified during exam. Prior to the carriage of passengers, to the satisfaction of the USCG the vessel must install flame screens under the strainers.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 May 2021
Resolved 19 April 2021
Resolution: Vessel rep Clayton provided email with pictures of strainers bowls fitted with appropriate screens.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 15 April 2021
Resolved
Each ring life buoy must be marked in clearly legible block capital letters with the vessel's name & Type II retroreflective material. The ring buoy onboard was not marked. Within thirty days and to the satisfaction of the USCG mark onboard ring buoy.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 May 2021
Resolved 19 April 2021
Resolution: Received picture of the vessel's Ring buoy properly marked.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 March 2018
Resolved
Install drip pans with flame screens under fuel strainers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 April 2018
Resolution: Owner installed new drip pans with corrosion resistant flame screens of 30x30 mesh.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 6 March 2018
Resolved
Prove proper operation of the float switch for the bilge pump located in the engine compartment.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 6 April 2018
Resolution: Owner replaced the float switch used to automatically energize the bilge pump in the engine compartment.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 March 2018
Resolved
Install an SAE J1223 approved back-fire preventer on the centerline engine.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 April 2018
Resolution: Owner installed a SAE approved back-fire preventer on the centerline engine's throttle body.