Records from 2016 to 2025. Most recent: inspection, 10 September 2025.
Documentation record
Registered dimensions (L × B × D)82.2 ft × 20.0 ft × 6.0 ft
Registered tonnagegross 73 / net 49
ITC dimensions (L × B × D)82.2 ft × 20.0 ft × 6.0 ft
ITC tonnagegross 178 / net 63
BuilderMID-CITY STEEL FABRICATING INC · LA CROSSE, WI, UNITED STATES · built 2006
Hull materialSteel
PropulsionDiesel Direct
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationCase Pending · issued 15 January 2026 · expires 28 February 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it178 - Convention (Subpart B), Gross Ton
73 - Regulatory (Subpart C or D), Gross Ton
63 - Convention (Subpart B), Net Ton
49 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 20
10 September 2025
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8226491
15 January 2025
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8063581
2 October 2024
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8012572
5 July 2024
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7950033
23 May 2024
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7918097
26 April 2024
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7902292
28 July 2023
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7754861
27 January 2023
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7616517
11 October 2022
Internal Structural Exam · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7570707
18 May 2022
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7453611
17 November 2021
Annual Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7352777
21 January 2021
Internal Structural Exam · Administrative Inspection · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7128024
1 December 2020
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7103763
1 November 2019
Deficiency Check · Administrative Inspection · DAPI Audit · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6846989
20 February 2019
Internal Structural Exam · Drydock Exam · Examination of Repairs
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6628103
21 August 2018
COI Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6518068
3 January 2018
Deficiency Check · Administrative Inspection
Physical examination · Navigation Center · Activity 6332046
3 November 2017
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6300015
9 January 2017
Hull Examination · Internal Structural Exam · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6068152
6 October 2016
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6017266
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 September 2025
Resolved
Electrical equipment must be installed to protect passengers crew, and other persons, including fire. Electrical outlet was not secured to bulkhead on STBD site lazarette. Permanently install outlet.
46 CFR 183.200, 50 c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 October 2025
Resolved 3 October 2025
Resolution: Electrical outlet secured to bulkhead.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 2 October 2024
Resolved
Where ridgid nonmetalic material (Plastic) is permitted for use in piing systems. One or more metalic shutoff valves must be installed. several penetrations were identified without required metalic shutoff valve. HVAC condensate drain line is PVC with no metalic valve in way of penetration in hull above the waterline. Seachest vent and other penetrations observed thoughout the vessel in same condition. Install proper metalic shutoff valves. 46 CFR 182.720 - 705 (c) Prior to next Annual Inspection.
Action required: 705 - Other - as specified
Resolved 13 February 2025
Resolution: 705 (c) Prior to next Annual Inspection.
Verified repair while onboard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 July 2024
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at a constant marine load. Furthermore, repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. Proposed alterations must be approved by the OCMI before work is started. The OCMI may require an inspection and testing whenever a repair or alteration is undertaken.
Vessel reported inability to start the Port Main Diesel Engine (MDE), while pier-side. Prior to Carriage of Passengers, submit Causal Analysis report re: failure to start MDE and repair proposal for OCMI review & approval. Upon repair plan approval, complete repairs and testing / verification to satisfaction of MI's.
46 CFR 182.200(b)
46 CFR 176.700
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 July 2024
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 28 July 2023
Resolved
Portable fire extinguisher installation and location must be to satisfaction of [name withheld] fire extinguisher must be mounted in proper bracket in the 2nd deck bar area.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 August 2023
Resolved 30 August 2023
Resolution: SEC NY received documentation from vessel indicating the deficiency has been rectified.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 July 2023
Resolved
The initial inspection is conducted to determine that the vessel and its equipment comply with applicable regulations and sanitation conditions. The ice machine on the second deck in the bar area has mold.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 August 2023
Resolved 30 August 2023
Resolution: SEC NY received documentation from vessel indicating the deficiency has been rectified.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 28 July 2023
Resolved
Each entrance to a space storing Carbon Dioxide cylinders, a space protected by Carbon Dioxide system must have proper marking,. The space where Carbon Dioxide is stored, protected and might migrate is missing proper marking.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 16 August 2023
Resolved 30 August 2023
Resolution: SEC NY received documentation from vessel indicating the deficiency has been rectified.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 1 November 2019
Resolved
Dampers - provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge opening for a space protected by a fixed gas extinguishing system. Dampers are broken and do not shut.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 1 November 2019
Resolved 8 November 2019
Resolution: Port engineer for vessel replaced damper actuators.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 1 November 2019
Resolved
Tubular gauge glasses, if fitted to diesel fuel tanks, must be of heat resistant materials, adequately protected from mechanical damage, and provided at the tank connections with devices that will automatically close in the event of rupture of the gauge or gauge lines. Gauge glass was made of a non-heat resistant material.
46 cfr 182.440 (a)(v)(7)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 1 November 2019
Resolved 8 November 2019
Resolution: Operator installed proper gauge glass which was made of proper materials.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 1 November 2019
Resolved
Tubular gauge glasses, if fitted to diesel fuel tanks, must be of heat resistant materials, adequately protected from mechanical damage, and provided at the tank connections with devices that will automatically close in the event of rupture of the gauge or gauge lines. Gauge was fitted with non-automatic closing valves.
46 cfr 182.440 (a)(v)(7)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 1 November 2019
Resolved 8 November 2019
Resolution: Operator installed proper valve for gauge glass assembly which included a spring loaded self closing valve.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 1 November 2019
Resolved
electrical equipment and installation must be suitable for the roll, pitch, and vibration of the vessel underway. Electrical equipment found in child life jacket stowage not mounted posing possible fire hazard to the children's lifejackets inside.
46 cfr 183.220
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 1 November 2019
Resolved 8 November 2019
Resolution: Operator removed electrical equipment in that space and plugged all through points created for the equipment.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 21 August 2018
Resolved
46 CFR 181.410(b)(10) - A device must be provided to automatically shutdown power ventilation servicing the protected space and engines that draw intake air from the protected space prior to release of extinguishing agent. No auto shutdown arrangement in place. Install automatic ventilation shutdown pressure switch.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 September 2018
Resolved 18 September 2018
Resolution: Installed automatic ventilation shutdown tie-in to pressure switch.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 21 August 2018
Resolved
46 CFR 176.830(a) - Protective device must be in satisfactory condition. Bilge pumps adjacent t o stuffing boxes not hard wired and bundled with dead-ends. Install junction boxes and secure wires.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 September 2018
Resolved 18 September 2018
Resolution: Installed junction boxes and secure wires in engine room.
Fire Fighting › Fire Pumps › Pressure
Issued 3 November 2017
Resolved
Prove proper operation of installed fire pump.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 November 2017
Resolution: Observed satisfactory operation fire pump at required 60psi.
Engineering › Bilge Water Management System › Pump
Issued 3 November 2017
Resolved
Prove proper operation of installed bilge system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 November 2017
Resolution: Observed satisfactory operation of fixed bilge system.
Lifesaving › Lifefloat › Serviceable
Issued 3 November 2017
Resolved
Repair/Replace all life floats to be in good working order. If purchasing new life floats, notify USCG prior to replacement.
Due 1 December 2017
Resolved 8 January 2018
Resolution: Removed life floats from vessel. Submitted weight change calculations to MSC. The reply letter from MSC is in Vessel documents.