Records from 2006 to 2012. Most recent: inspection, 27 July 2012.
Inspection history · 35
27 July 2012
COE-Dockside
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4360108
3 June 2012
COE-Dockside
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4322610
3 May 2012
Ballast Water Examination · ISPS III Exam · COC-TVE Renew
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 4301025
14 September 2011
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4145150
14 September 2011
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4145689
14 September 2011
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4146962
26 July 2011
COE-Dockside
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 4095147
27 February 2011
COE-Dockside
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3948503
25 January 2011
COE-Administrative
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3930459
14 October 2010
COE-Dockside
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3869962
11 December 2009
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3648803
17 July 2009
COE-Administrative
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3537308
1 May 2009
COE-Administrative
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3465200
21 March 2009
COE-Dockside
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3437030
17 March 2009
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3435085
25 February 2009
COE-Administrative
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3423599
25 October 2008
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3351257
25 August 2008
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3308345
20 August 2008
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3304325
11 August 2008
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3295802
28 April 2008
COC-TVE Renew · MARPOL Annex V Examination · ISPS II Exam · Ballast Water Examination · MARPOL Annex I Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3190416
5 April 2008
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3177967
6 December 2007
Type not recorded
No type recorded · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3110853
12 September 2007
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3055917
1 June 2007
Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2948925
27 May 2007
Ballast Water Examination · COC-TVE Annual · ISPS II Exam · MARPOL Annex I Examination · MARPOL Annex V Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2937378
26 May 2007
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2934487
2 March 2007
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2880536
23 September 2006
Type not recorded
No type recorded · USCGC TAHOMA (WMEC 908) · Activity 2785304
21 June 2006
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 2687412
10 June 2006
Random ISPS/MTSA/PSC
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2677471
24 May 2006
COC-TVE Renew · MARPOL Annex I Examination · MARPOL Annex V Examination · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2656703
20 May 2006
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2655805
17 May 2006
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2652181
17 May 2006
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2652188
Engineering › Fuel Oil Service System › Pump
Issued 14 September 2011
Resolved
The vessel experienced a propulsion loss while in the Mississippi River.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 September 2011
Resolved 16 September 2011
Resolution: Received, reviewed and accepted class report from [name withheld] stating the two-position three way valves and the fuel pump were repaired, tested and found satisfactory.
Engineering › Sea-water System (primary cooling) › Piping
Issued 11 December 2009
Resolved
-1410 Propulsion Main Engine- The Machinery and associated piping systems and fittings shall be of a design and construction adequate for the service for which they were intended. Jacket water collar on cylinder #4 on the Main Engine had a leak due to a crack in the Jacket water collar leading to a reduction of RPM's. Corrected on the spot. SOLAS 2004 cons. ed. Ch II-1/REG 26.1.
Condition: Unknown
Due 12 December 2009
Resolved 12 December 2009
Resolution: Received class report attesting that no leaks were present in the jacket cooling line for the #4 cylinder. Sector Delaware Bay conducted an inspection of the Engine room and found the Jacket cooling line for the #4 cylinder to be repaired properly.
Navigation › Collision/Grounding Avoidance › Radar
Issued 25 August 2008
Resolved
1530 - Radar - Ship and its equipment shall be maintained fit to proceed to sea without danger to ship or persons on board. Vessel's x band radar inoperable. Solas 74 Con Ed. CH1 Reg 11.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 25 August 2008
Resolved 25 August 2008
Resolution: Recieved tech report stating radar has been repaired.
Navigation › Collision/Grounding Avoidance › Radar
Issued 20 August 2008
Resolved
X-Band Radar INOP.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 August 2008
Resolution: Received TECH report that radar is fully operational.
Navigation › Collision/Grounding Avoidance › Radar
Issued 11 August 2008
Resolved
INOPERABLE SECONDARY RADAR
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 August 2008
Resolution: Report received by SecDelBay PSC office attesting to radar repairs completed.
Navigation › Collision/Grounding Avoidance › Echo-sounding Device
Issued 5 April 2008
Resolved
Vessel requested LOD for inop Echo Depth sounder.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 April 2008
Resolution: Telemar tech replaced Depth sounder and Recorder. Both tested and found to be in working order.
Navigation › Collision/Grounding Avoidance › Radar
Issued 5 April 2008
Resolved
Radar runs for a few hours then shuts off for no known resin
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 April 2008
Resolution: Checked Transceiver power unit. All voltages are normal. Found burned smell caused by shorted by shorted modulator overswing unit. Replaced Modulator PCB. Applied power. Checked High Voltage, +350V. Radar now transmitting normally.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 27 May 2007
Resolved
Upon testing the emergency shut down for the cargo pumps, a leak was discovered at the cargo pump #3 seal. Over 50 gallons of product leaked out and was recovered. Require class surveyor to attest to condition of cargo pump #3.
Rectify deficiencies prior to next US port after sailing foreign to the satisfaction of Class.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 31 May 2007
Resolution: Report was recieved from class surveyor [name withheld] with RINA USA Inc. attesting to the repairs on cargo pump #3''s gland seal. Pump was tested with the valves opened under operational condition. No leakage was observed during operation and shut down.