MAURY USCG vessel records
← All vessels

STAR ANGELINA

STAR ANGELINA is a 2006 freight ship. The Coast Guard has recorded 11 inspections since 2016, most recently in September 2025, along with 15 deficiencies and 1 operational control.

Records from 2016 to 2025. Most recent: inspection, 30 September 2025.

Built
2006
Last inspected
30 September 2025
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls and the documentation record — is Professional, $39 a month. Sign in.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.

Inspection record

Last inspected 30 September 2025
…with no type recorded3
Operational controls None recorded without a removal date
Years with a record 6 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9310630
820241
Flag
MARSHALL ISLANDS
Maury page id
psix-820241

Documentation record

Tonnage as PSIX records it42909 - Convention (Subpart B), Gross Ton
27547 - Convention (Subpart B), Net Ton
93768 - Displacement, Metric Ton
82953 - Dead Weight, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
Detail on this page

11 inspections, each with its date, unit and type; 15 deficiencies with the resolution recorded against each; 1 operational control with the dates imposed and removed; the documentation record, as PSIX holds it. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 11

30 September 2025 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8237283
10 August 2025 PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8205830
14 June 2024 In-Service Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7927582
5 June 2024 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7927763
19 September 2023 PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7788594
6 November 2021 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7346569
31 October 2021 COE-Administrative
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7342794
12 June 2018 Ballast Water Examination · NPV Safety Exam · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6378623
6 December 2016 ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6047985
3 December 2016 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6051894
3 December 2016 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6051918

Deficiency record · 15

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 August 2025 Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board. PSCO observed major jacket water leak on M/E cylinder #1. 74SOLAS(04)II-1/ 26.1 60abc
Action required: 60 - Rectify deficiencies prior to movement
Resolved 11 August 2025
Resolution: REMOVED CYLINDER HEAD AND CLEANED, DISMANTLED THE SHORT JACKET, REPLACED WITH NEW GASKET AND O-RING, ASSEMBLED, INSTALLED BACK AND TESTED IN THE PRESENCE OF ATTENDING CLASS SURVEYOR, CONFIRMED NO MORE LEAKAGE.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 August 2025 Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board. PSCO observed jacket water leak on M/E cylinder #4. 74SOLAS(04)II-1/ 26.1 60abc
Action required: 60 - Rectify deficiencies prior to movement
Resolved 11 August 2025
Resolution: REMOVED CYLINDER HEAD AND CLEANED, DISMANTLED THE SHORT JACKET, REPLACED WITH NEW GASKET AND O-RING, ASSEMBLED, INSTALLED BACK AND TESTED IN THE PRESENCE OF ATTENDING CLASS SURVEYOR, CONFIRMED NO MORE LEAKAGE.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 10 August 2025 Resolved
All the steering gear components and the rudder stock shall be of sound and reliable construction to the satisfaction of the Administration. Special consideration shall be given to the suitability of any essential component which is not duplicated. PSCO observed excessive leakage of hydraulic oil from ram seal for steering gear pump #2. 74SOLAS(04)II-1/ 29.2.1 60abc
Action required: 60 - Rectify deficiencies prior to movement
Resolved 11 August 2025
Resolution: OIL SEAL REPLACED AND RE-TIGHTENED NUTS, AREA CLEANED AND TESTED IN THE PRESENCE OF ATTENDING CLASS SURVEYOR, CONFIRMED NO MORE LEAKAGE
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 10 August 2025 Resolved
Every steam pipe and every fitting connected thereto through which steam may pass shall be so designed, constructed and installed as to withstand the maximum working stresses to which it may be subjected. PSCO observed steam leak on the M/E jacket water cooler. 74SOLAS(04)II-1/ 33.1 17abc
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 August 2025
Resolution: DISMANTLED M/E JACKET WATER COOLER, CLEANED AND REPLACED WITH NEW GASKET, ASSEMBLED AND TESTED IN THE PRESENCE OF ATTENDING CLASS SURVEYOR, CONFIRMED NO MORE LEAKAGE.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 10 August 2025 Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board. PSCO observed leakage from the M/E lube oil cooler heat exchanger plates. 74SOLAS(04)II-1/ 26.1 17abc
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 August 2025
Resolution: Crew made temporary repairs. Cleared deficiency and amended as new deficiency #15
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 10 August 2025 Resolved
In a ship in which oil fuel is used, the arrangements for the storage, distribution and utilization of the oil fuel shall be such as to ensure the safety of the ship and persons on board. PSCO observed fuel oil leak on the A/E #1 cylinder #5 F/O pump. 74SOLAS(09)II-2/ 4.2.2 17abc
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 August 2025
Resolution: REMOVED FUEL OIL PUMP DISCHARGE HEAD AND REPLACED WITH NEW O-RING AND ASSEMBLED, INSTALLED BACK AND TESTED IN THE PRESENCE OF ATTENDING CLASS SURVEYOR, CONFIRMED NO MORE LEAKAGE.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 10 August 2025 Resolved
In a ship in which oil fuel is used, the arrangements for the storage distribution and utilization of the oil fuel shall be such as to ensure the safety of the ship and persons on board. PSCO observed fuel oil leak on the A/E #2 cylinder #4 F/O pump. 74SOLAS(09)II-2/ 4.2.2 17abc
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 August 2025
Resolution: REMOVED FUEL OIL PUMP DISCHARGE HEAD AND REPLACED WITH NEW O-RING AND ASSEMBLED, INSTALLED BACK AND TESTED IN THE PRESENCE OF ATTENDING CLASS SURVEYOR CONFIRMED NO MORE LEAKAGE.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 10 August 2025 Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board. PSCO observed excessive leakage from A/E #2 cooling water thermostat. 74SOLAS(04)II-1/ 26.1 17abc
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 August 2025
Resolution: DISMANTLED THERMOSTAT, CLEANED AND REPLACED PISTON WITH NEW O-RING, ASSEMBLED, INSTALLED BACK AND TESTED IN THE PRESENCE OP ATTENDING CLASS SURVEYOR CONFIRMED NO MORE LEAKAGE
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 10 August 2025 Resolved
Every steam pipe and every fitting connected thereto through which steam may pass shall be so designed, constructed and installed as to withstand the maximum working stresses to which it may be subjected. PSCO observed steam leak on the A/E #3 steam supply line. 74SOLAS(04)II-1/ 33.1 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 11 August 2025
Resolution: REMOVED PIPE AND REPLACED GASKET WITH NEW ONE, TESTED IN THE PRESENCE OF ATTENDING CLASS SURVEYOR AND CONFIRMED NO MORE LEAKAGE.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 10 August 2025 Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board. PSCO observed leakage from boiler feed pump #2. 74SOLAS(04)II-1/ 26.1 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 30 September 2025
Resolution: pump had been dismantled, the shaft sleeve and gland packing renewed. No abnormalities were observed and found satisfactory
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 10 August 2025 Resolved
In a ship in which oil fuel is used, the arrangements for the storage, distribution and utilization of the oil fuel shall be such as to ensure the safety of the ship and persons on board. PSCO observed fuel oil leak on the M/E cylinder #4 fuel oil return line. 74SOLAS(09)II-2/ 4.2.2 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 30 September 2025
Resolution: Bolts were dismantled and cleaned. It was observed that the leakage occurred due to insufficient tightening. Bolts were properly tightened, leakage rectified, and found satisfactory.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 10 August 2025 Resolved
Ventilation ducts shall be of non-combustible material. PSCO observed crew using two separate flexible non-approved ducting tubes connected to fixed duct outlet proving direct ventilation to air compressor. 74SOLAS(09)II-2/ 9.7.1.1 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 30 September 2025
Resolution: Radiator was replaced with a spare part and found satisfactory.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 10 August 2025 Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board. PSCO observed leakage and unapproved temporary patch on A/E freshwater cooler pipe. 74SOLAS(04)II-1/ 26.1 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 30 September 2025
Resolution: The pipe which had a temporary repair was renewed by the crew. No abnormalities were observed and found satisfactory.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 10 August 2025 Resolved
Provisions shall be made to reduce to a minimum the entry of oil into the air pressure systems and to drain these systems. PSCO observed crew using cookie tin lid to blank off air receiver drain. 74SOLAS(04)II-1/34.4 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 11 August 2025
Resolution: COOKIE TIN LID WAS REMOVED AND REPLACED WITH PYREX GLASS MATERIAL, TO MAKE THE DRAIN, INSTALLATION CONFIRMED BY THE ATTENDING CLASS SURVEYOR.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 10 August 2025 Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board. PSCO observed minor leakage from the M/E lube oil cooler heat exchanger plates. Leakage has been temporarily stopped. 74SOLAS(04)II-1/ 26.1 50ac
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 September 2025
Resolution: A temporary repair was carried out by the crew, and it was observed during inspections that no leakage was present. As a result, a two-month extension was granted.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.