Records from 2006 to 2008. Most recent: inspection, 15 September 2008.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Lifesaving › Launching Appliances › Davit
Issued 18 August 2008
Resolved
Have FRC Davit annual servicing performed iaw MSC Circular 1206
Due 18 September 2008
Resolved 21 August 2008
Resolution: Annual servicing performed.
Lifesaving › Launching Appliances › Falls
Issued 18 August 2008
Resolved
Perform 1.1 proof load test on FRC davit falls.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 August 2008
Resolution: Proof load test performed.
Electrical › Electrical Distribution System (emergency) › Outlet Box
Issued 18 August 2008
Resolved
Provide battery boxes for all spare batteries in generator room.
Due 18 September 2008
Resolved 21 August 2008
Resolution: Battery boxes provided.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 18 August 2008
Resolved
Prove proper operation of all fixed fire fighting system time delays.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 August 2008
Resolution: Proper operation of fixed fire system time delays proven.
Fire Fighting › Firemans Outfit › Quantity
Issued 18 August 2008
Resolved
Provide two complete firesuits for vessel.
Due 4 November 2008
Resolved 27 October 2009
Resolution: vessel has reflagged out of U.S. service.
Engineering › Sea-water System (primary cooling) › Piping
Issued 18 August 2008
Resolved
Properly repair salt water cooling piping for the starboard inboard engine.
Due 18 September 2008
Resolved 27 October 2009
Resolution: vessel has reflagged out of U.S. service.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 18 August 2008
Resolved
Perform man overboard drills for attending marine inspector.
Due 18 September 2008
Resolved 23 August 2008
Resolution: Man overboard drill performed.
Construction/Loadline › Structures › Door
Issued 18 August 2008
Resolved
Provide automatic door closures for all engine room doors.
Due 18 September 2008
Resolved 21 August 2008
Resolution: Automatic door closures installed.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 18 August 2008
Resolved
Properly repair the upper mount to the starboard generator.
Due 18 September 2008
Resolved 21 September 2008
Resolution: Upper mount repaired.
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 18 August 2008
Resolved
Conduct annual review of SOPEP with letter to COMDT, per the requirements of USCG letter 16460/D1187093 dated 08 Aug 2006.
Due 18 September 2008
Resolved 18 August 2008
Resolution: Annual review performed
Construction/Loadline › Markings › Load Line Mark
Issued 18 August 2008
Resolved
Paint draft marks and load line.
Due 18 September 2008
Resolved 21 August 2008
Resolution: Draft marks and load line painted.
Documentation › Manifests/Lists › Dangerous Goods Manifest/Stowage Plan
Issued 18 August 2008
Resolved
Demonstrate adherence/familiarity with hazardous materials requirements of 49CFR100-177/IMDG Code.
Due 18 September 2008
Resolved 27 October 2009
Resolution: vessel has reflagged out of U.S. service.
Lifesaving › Rescue Boat › Carriage Requirement
Issued 18 August 2008
Resolved
Renew/replace rescue boat equipment iaw 46 CFR 133/199.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 August 2008
Resolution: Rescue boat equipment renewed/replaced.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 18 August 2008
Resolved
Obtain blood alcohol content detection equipment for determination of intoxication iaw 46CFR4/33CFR95.
Due 18 September 2008
Resolved 27 October 2009
Resolution: vessel has reflagged out of U.S. service.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 18 August 2008
Resolved
Vessel response plan requires final approval iaw 33 CFR 155.
Due 18 September 2008
Resolved 21 August 2008
Resolution: Company has initiated action to obtain final approval of VRP.
Electrical › Lighting (service) › Conductor
Issued 18 August 2008
Resolved
Provide comprehensive lighting at emergency escape scuttles.
Due 18 September 2008
Resolved 21 August 2008
Resolution: Corrected.
Construction/Loadline › Structures › Scuttle
Issued 18 August 2008
Resolved
Provide lanyards for security locking pins at emergency escape scuttles.
Due 18 September 2008
Resolved 21 August 2008
Resolution: Lanyards provided.
Fire Fighting › International Shore Connection › Bolts
Issued 18 August 2008
Resolved
Provide bolts for international shore connection.
Due 18 August 2008
Resolved 18 August 2008
Resolution: Bolts provided.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 4 December 2007
Resolved
Replace the bellows on the outboard main engines. Recieved email 12/10/2007 stating item has been cleared. Extended due date to correspond with the end of annual window due date.
Due 25 December 2008
Resolved 27 October 2009
Resolution: vessel has reflagged out of U.S. service.
Engineering › Fuel Oil Storage/Transfer System › Filter/Strainer
Issued 4 December 2007
Resolved
Properly support fuel filter brackets on outboard main engines so that there is not excessive vibration. Recieved email 12/10/2007 stating item has been cleared. Extended due date to correspond with the end of annual window due date.
Due 25 December 2008
Resolved 18 August 2008
Resolution: Corrected.
Electrical › Electrical Distribution System (service) › Cable
Issued 4 December 2007
Resolved
Replace zip ties supporting wiring in the engine room with metal brackets.
Due 5 February 2008
Resolved 5 December 2007
Fire Fighting › Fixed CO2 Fire Extinguishing System › Location
Issued 4 December 2007
Resolved
Clean out all equipment from the CO2 locker for the Mud Pump Room. Remove all items hanging on the CO2 pull stations. Recieved email 12/10/2007 stating item has been cleared. Extended due date to correspond with the end of annual window due date.
Due 25 December 2008
Resolved 18 August 2008
Resolution: Corrected
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 4 December 2007
Resolved
Have transfer hoses hydraulically tested as per 33 CFR 154. Recieved email 12/10/2007 stating item has been cleared. Extended due date to correspond with the end of annual window due date.
Due 25 December 2008
Resolved 27 October 2009
Resolution: vessel has reflagged out of U.S. service.
Engineering › Steering Gear System › Pin
Issued 4 December 2007
Resolved
Provide and properly stow the key needed to operate emergency steering. Recieved email 12/10/2007 stating item has been cleared. Extended due date to correspond with the end of annual window due date.
Due 25 December 2008
Resolved 18 August 2008
Resolution: Corrected.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 4 December 2007
Resolved
Provide drug consortium paperwork. Recieved email 12/10/2007 stating item has been cleared. Extended due date to correspond with the end of annual window due date.
Due 25 December 2008
Resolved 27 October 2009
Resolution: vessel has reflagged out of U.S. service.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 25 September 2006
Resolved
Submit for review and approval a Nontank Vessel Response Plan to Commandant (PCV-1) as per 33 CFR U.S.C. 1321(j)(5) and NVIC 01-05 Change 1
Action required: 705 - Other - as specified
Due 25 November 2006
Resolved 4 December 2007
Documentation › Safety Management System › Reports and Analysis Procedures
Issued 25 September 2006
Resolved
Submit to MSC for review and approval the Periodic Automation Test Procedures as required by 46 CFR 130.480
Action required: 705 - Other - as specified
Due 25 November 2006
Resolved 4 December 2007