Records from 2016 to 2021. Most recent: inspection, 10 February 2021.
Inspection history · 7
10 February 2021
PSC B · COC-TVE Annual
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7137459
30 March 2020
PSC B · COC-TVE Renew
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6929913
23 April 2018
COC-TVE Renew · ISPS II Exam · Ballast Water Examination · COE-Dockside
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6393567
16 March 2017
COE-Dockside · ISPS II Exam · Ballast Water Examination · COC-TVE Annual
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6095673
13 March 2017
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6137044
24 March 2016
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 5839888
14 March 2016
Ballast Water Examination · ISPS II Exam · COC-TVE Renew
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 5829967
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 23 April 2018
Resolved
1820- Cargo pump room- No electrical equipment shall be installed in any place where flammable mixtures are liable to collect including those on board tankers, unless the administration is satisfied that such equipment is essential for operational purposes of a typ which will not ignite the mixture concerned, appropriately certified for safe usage inthe dusts, vapors or gases likely to be encoutered. PSCO observed mulitple temperature sensing devices on all three cargo oil pumps and ballast water pumps to have loose fittings and exposed electrical connections. Prior to cargo discharge provide documentation from certificate issuing authority attesting to integrity of electrical connections on cargo pump sensing devices and ballast water pumps. 74 SOLAS (04) II-1/ 45.10 a
Action required: 705 - Other - as specified
Resolved 24 April 2018
Resolution: 24APR18: Received class report from LR stating deficiency has been rectified. The electrical connections repaired and made intrinsically safe.
Engineering › Diesel Engine (propulsion-direct drive) › Camshaft
Issued 23 April 2018
Resolved
1410- Propulsion main engine- The condition of the ship and its equipment shall be maintained to conform with present regulations to ensure vessel remains fit to proceed to sea without danger to the ship or persons on board. PSCO observed excessive lube oil leak on the main engine's cam shaft seal. 74 SOLAS (09) I-11 40a
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 24 April 2018
Resolution: 24APR18: Received class report from LR stating deficiency has been rectified. CE tightned camshaft aft housing seal, no leaks observed, order placed for new gasket.
Lifesaving › Launching Appliances › Davit
Issued 23 April 2018
Resolved
0635- launch arangt. for rescue boats- Before the ship leaves port, and at all times during the voyage, all life saving appliances shall be in working order and ready for immediate use. PSCO observed rescue boat davit unable to lower. 74 SOLAS (14) III/ 20 10c
Action required: 10 - Deficiency Rectified
Resolved 23 April 2018
Resolution: Davit was fixed while Coast Guard was onboard.
Pollution Prevention/Response › Prevention Equipment › Incinerator, Shipboard
Issued 14 March 2016
Resolved
After any survey of the ship under paragraph 1 of this regulation has been completed, no changes shall be made in the structure, equipment, system, fitting, arrangement or material covered by the survey, without the sanction of the Administration. The vessel is running more waste oil through the incinerator then the designed through put.
Condition: Placed in Improper Service
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 24 March 2016
Resolution: Received review and excepted class report stating that all the deficiencies were corrected.
Documentation › Logs/Records › Oil Record Book
Issued 14 March 2016
Resolved
The Oil Record Book Part 1 shall be completed on each occasion, on a tank-to-tank basis if appropriate whenever any of the following machinery space operation takes place. Collection and disposal of oil sludge. Vessel is transfering oil within the system and not recording it into the Oil Record Book. The missing entry is for the FO Drain, being transfered back into the fuel oil system.
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 24 March 2016
Resolution: Received review and excepted class report stating that all the deficiencies were corrected.