Records from 2006 to 2017. Most recent: inspection, 19 October 2017.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Operations/Management › Drills/Instruction › Not Conducted
Issued 25 January 2017
No resolution recorded
Vessel must conduct fire, abandon ship, person in the water drills, prior to getting underway, and to the satisfaction of attending CG Marine Inspector. 46CFR 131.535, 46 CFR 133.135, 46 CFR 131.530 Prior To Sail
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Engineering › Fuel Oil Service System › Piping
Issued 24 January 2017
Resolved
Marine Inspectors found several missing and loose support brackets on fuel rail for both main engines, bow thruster, and generators. Renew/replace all fuel rail brackets. In addition, remove all brackets on all prime movers to inspect fuel rail and report findings to attending USCG Marine inspectors or ABS Surveyor. 46 CFR 56.50-70(b)(1)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 January 2017
Resolution: ABS Surveyor [name withheld] accepted as Condition of Class, see email confirmation in documents.
Electrical › Electrical Distribution System (service) › Grounding Conductor
Issued 24 January 2017
Resolved
Marine Inspectors identified a "ground fault" on both main engines and centerline generator. Upon further inspection, MI's found welding cables being used as a ground and showed excessive wastage. replace with suitable material to the satisfaction of attending USCG Marine Inspector or ABS Surveyor. 46 CFR 111.60
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 January 2017
Resolution: ABS Surveyor [name withheld] accepted as Condition of Class, see email confirmation in documents.
Fire Fighting › Fire Main › Valves
Issued 24 January 2017
Resolved
Marine Inspector found a wasted butterfly valve handle on the fire main for the international shore connection. Replace to the satisfaction of the attending Marine Inspector or ABS Surveyor. 46 CFR 132.110
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 January 2017
Resolution: ABS Surveyor [name withheld] accepted as Condition of Class, see email confirmation in documents.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 24 January 2017
Resolved
Marine Inspectors found several fire doors throughout the vessel that would not close completely (self closing). Adjust to the satisfaction of attending USCG Marine inspector or ABS Surveyor. 46 CFR 127.220, 46 CFR 72.05-10
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 January 2017
Resolution: ABS Surveyor [name withheld] accepted as Condition of Class, see email confirmation in documents.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 24 January 2017
Resolved
Marine Inspectors saw no visible egress sinage or IMO symbols in the tank farm. Place appropriate symbols ot the satisfaction of the attending USCG Marine Inspector or ABS Surveyor. 46 CFR 127.240(b)
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 January 2017
Resolution: ABS Surveyor [name withheld] accepted as Condition of Class, see email confirmation in documents.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 24 January 2017
Resolved
Marine Inspectors found several watertight doors and fire doors with "tie backs". Remove immediatly to the satisfaction of the attending USCG MI. 46 CFR 42.15
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 January 2017
Resolution: ABS Surveyor [name withheld] accepted as Condition of Class, see email confirmation in documents.
Fire Fighting › Ventilation Systems › Ducts
Issued 24 January 2017
Resolved
Marine Inspector found missing/melted dryer vent on laundry dryer on 02 deck. Repair/replace prior to use. verify all laundry dryer vents are properly installed to the satisfaction of attending USCG Marine Inspector or ABS Surveyor. 46 CFR 126.100
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 January 2017
Resolution: ABS Surveyor [name withheld] accepted as Condition of Class, see email confirmation in documents.
Construction/Loadline › Penetrations › Gasket
Issued 24 January 2017
Resolved
Marine Inspectors identified a "softgasket" on the watertight door from engine room to the tank farm. Replace to the satisfaction of attending USCG Marine Inspector or ABS Surveyor. 46 CFR 170.270 (b)
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 January 2017
Resolution: USCG Marine Inspector verified soft gasket replaced with satisfactory hard gasket.
Lifesaving › Lifebuoys › Serviceable
Issued 24 January 2017
Resolved
Marine Inspectors found both bridge ring life bouys with wated plugs. In addition, several ring bouys were found with wasted line, insufficient retro tape(name painted over). Repair/replace to the satisfaction of attending USCG Marine Inspector or ABS Surveyor. 46 CFR 133.70
Condition: Improper/Lack of Maintenance
Action required: 66 - Prior to drilling or production operations
Resolved 8 February 2017
Resolution: Ring bouys replaced
Fire Fighting › Emergency Fire Pumps › Arrangement
Issued 24 January 2017
Resolved
During testing of both main & emergency fire pumps, Marine Inspectos noted the bauge for both pumps were inoperable on the bridge. Repair to the satisfaction of attending USCG Marine Inspector or ABS Surveyor. 46 CFR 130.430
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 February 2017
Resolved 30 January 2017
Resolution: ABS Surveyor [name withheld] accepted as Condition of Class, see email confirmation in documents.
Lifesaving › Rescue Boat › Markings
Issued 24 January 2017
Resolved
Navigation light on rescue boat is not mounted correctly. Mount Correctly to the satisfaction of attending USCG Marine Inspector or ABS Surveyor. 46CFR 133.135 NAV Rules
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 7 February 2017
Resolved 30 January 2017
Resolution: ABS Surveyor [name withheld] accepted as Condition of Class, see email confirmation in documents.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 24 January 2017
Resolved
Several deck cargo piping and freshwater butterfly vavle handles wasted. In addition, several support brackets are wasted. Repair/replace to the satisfaction of attending USCG Marine Inspector or ABS Surveyor. 46 CFR 126.100
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 February 2017
Resolved 30 January 2017
Resolution: ABS Surveyor [name withheld] accepted as Condition of Class, see email confirmation in documents.
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 24 January 2017
Resolved
Guages on both air receivers are maxed out at 300 psi. MAWP is 300 psi. Relief valves are set at 250 psi, gauges are required to be at 1.2 -2.0 times the setting of the relief valve. Replace to the satisfaction of USCG Marine Inspector or ABS Surveyor. 46 CFR 54.15-5 (f)
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 7 February 2017
Resolved 30 January 2017
Resolution: ABS Surveyor [name withheld] accepted as Condition of Class, see email confirmation in documents.
Fire Fighting › Miscellaneous Items › Paint/Flammable Liquid Lockers
Issued 24 January 2017
Resolved
Several holels and inability to close ventilation on paint locker, fuel supply lockers were found. Repair to the satisfaction of attending USCG Marine Inspector or ABS Surveyor. 46 CFR 132.310
Condition: Improper/Lack of Maintenance
Due 7 February 2017
Resolved 25 January 2017
Resolution: Observed satisfactory repair to ventilation and penitrations.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 24 January 2017
Resolved
Alcohol testing strips expired. Place valide ones on board. 46 CFR 4.06-15
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 January 2017
Resolved 10 February 2017
Resolution: Recieved evidence that DOT approvied alcohol testing strips had been place on board.
Electrical › Electrical Distribution System (service) › Overcurrent Device
Issued 24 January 2017
Resolved
Panels P1 and P3 (distribution panels) have breakers installed that do not match index. Ensure overcurrent protection is to the satisfaction of attending USCG Marine Inspector or ABS Surveyor. 46 CFR 129.330, 46 CFR 111.40
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 23 February 2017
Resolved 30 January 2017
Resolution: ABS Surveyor [name withheld] accepted as Condition of Class, see email confirmation in documents.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 24 January 2017
Resolved
Marine Inspector found 02 junction boxes loose and not secured on the 02 deck. Repair to the satisfaction of attending USCG Marine Inspector or ABS Surveyor.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 February 2017
Resolved 30 January 2017
Resolution: ABS Surveyor [name withheld] accepted as Condition of Class, see email confirmation in documents.
Construction/Loadline › Structures › Door
Issued 24 January 2017
Resolved
Starboard weathertight door on bridge has wastage near bottom. Repair/replace to the satisfaction of attending USCG Marine Inspector or ABS Surveyor. 46 CFR 42.12-30
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 February 2017
Resolved 30 January 2017
Resolution: ABS Surveyor [name withheld] accepted as Condition of Class, see email confirmation in documents.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 24 January 2017
Resolved
Vessel missing several eyewash containers throughout the vessel. Replace to the satisfaction of attending USCG Marine Inspector or ABS Surveyor.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 January 2017
Resolved 30 January 2017
Resolution: ABS Surveyor [name withheld] accepted as Condition of Class, see email confirmation in documents.
Deck/Cargo › Mooring/Anchoring › Standard Link (anchor chain)
Issued 24 January 2017
Resolved
Marine Inspector identified an elongated anchor link. Prove proper operation to satisfaction of attending USCG Marine Inspector or ABS Surveyor. 46 CFR 130.240 ABS Class Rules
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 23 February 2017
Resolved 30 January 2017
Resolution: ABS Surveyor [name withheld] accepted as Condition of Class, see email confirmation in documents.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 25 August 2015
Resolved
IOPP Certificate lists installed OWS and OCM as MEPC 107(49). Type approval not available for OCM and OWS manual states compliant with MEPC 60(33). Provide type approvals and manuals for both OCM and OWS. Resolve discrepancy between manual and IOPP certificate. Provide to ABS surveyor or USCG Marine Inspector prior to using OWS.OCM.
Action required: 705 - Other - as specified
Due 25 September 2015
Resolved 26 September 2015
Resolution: Vessel provided ABS report attesting to correction.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 25 August 2015
Resolved
Calibration certificate not available for oil content meter. Provide to ABS surveyor or USCG Marine Inspector prior to using OWS and OSC.
Action required: 705 - Other - as specified
Due 25 September 2015
Resolved 14 September 2015
Resolution: Vessel provided technician's report attesting to installation of new calibrated cell.
Engineering › Fuel Oil Service System › Piping
Issued 25 August 2015
Resolved
Oil leak on emergency generator fuel service system.
Due 25 August 2015
Resolved 25 August 2015
Resolution: Corrected on the spot.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 25 August 2015
Resolved
Emergency signage including general alarm and fixed CO2 instructions not available in Spanish, the working language of the crew. Ensure emergency instructions available in both SPanish and English to satisfaction of ABS surveyor or USCG Marine Inspector.
Action required: 705 - Other - as specified
Due 8 September 2015
Resolved 10 September 2015
Resolution: Vessel provided documentation showing placement of signage in both Spanish and English.
Fire Fighting › Portable CO2 Fire Extinguisher › Approval
Issued 25 August 2015
Resolved
Numerours fire extinguishers do not meet USCG approvals, including one on bridge and all portable extinguishers attached to paint and sample lockers. Provide USCG approved extinguishers to satisfaction of ABS surveyor or USCG Marine Inspector.
Action required: 705 - Other - as specified
Due 8 September 2015
Resolved 5 October 2015
Resolution: Vessel replaced fire extinguishers with CG approved items.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 25 August 2015
Resolved
Oil and liquid mud transfer hoses not stenciled, do not have manufacture and annual test records, and one is dry rotted. Correct prior to to using to satisfaction of ABS surveyor or USCG Marine Inspector.
Action required: 705 - Other - as specified
Due 25 September 2015
Resolved 18 September 2015
Resolution: Vessel provided documentation attesting to new transfer hoses purchased and put in service.
Documentation › Certificates/Documents › Document of Compliance (ISM)
Issued 4 November 2010
Resolved
Work with Classification society to rectify disparity between CSR and ISM DOC.
Due 4 December 2010
Resolved 30 November 2010
Resolution: Received email from [name withheld]. #4 CSR amendment received and active. ISM DOC remains unchanged.
Documentation › Certificates/Documents › Safety Management Certificate (ISM)
Issued 4 November 2010
Resolved
Work with Classification Society to rectify disparity between CSR and the ISM SMC.
Due 4 December 2010
Resolved 30 November 2010
Resolution: Received email from [name withheld] dated 30Nov10. #4 CSR amendment received and active. ISM SMC remains unchanged.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 9 December 2009
Resolved
Conduct and log weekly test run of rescue boat engine (min 3 min). Report cleared via E-mail dated 25Feb, Item remains open until confirmed during next CG attendance.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 October 2010
Resolved 4 November 2010
Resolution: Observed log and operational test of boat.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 9 December 2009
Resolved
Provide Maintenance Checklist in accordance with 46 CFR 131.545 AND manufacturer's instructions, and log all required maintenance in accordance with 46 CFR 131.545(a)(7). There is no evidence of Yearly inspection/maintenance in accordance with 46 CFR 131.575. Also, conduct annual thorough testing of rescue boat davit/winch and releasing gear in accordance with SOLAS 74 (amended) and MSC 1206. Ve
Action required: 705 - Other - as specified
Due 10 October 2010
Resolved 4 November 2010
Resolution: Observed checklist and annual inspection had been completed.
Electrical › Electric Generation Source (emergency) › Circuit Breaker
Issued 9 December 2009
Resolved
Conduct monthly test of emergency generator, at least once per month, for at least 2 hours under load, and log. Report cleared via E-mail dated 25Feb, Item remains open until confirmed during next CG attendance.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 October 2010
Resolved 4 November 2010
Resolution: Monthly test had been logged for the year.
Documentation › Logs/Records › Logbook (official)
Issued 9 December 2009
Resolved
Maintain USCG Official Logbook (provided) and submit to cognizant OCMI. Report cleared via E-mail dated 25Feb, Item remains open until confirmed during next CG attendance.
Action required: 705 - Other - as specified
Due 10 October 2010
Resolved 4 November 2010
Resolution: Official log book utilized. Training conducted.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 9 December 2009
Resolved
Conduct annual hydrostatic testing (150% Max Working Pressure) of oil transfer hoses (fuel and oil-based mud). Report cleared via E-mail dated 25Feb, Item remains open until confirmed during next CG attendance.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 October 2010
Resolved 4 November 2010
Resolution: Hoses tested and documentation onboard.
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 9 December 2009
Resolved
Remove Deck urinal. Report cleared via E-mail dated 25Feb, Item remains open until confirmed during next CG attendance.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 10 October 2010
Resolved 4 November 2010
Resolution: No deck urinal present.
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 9 December 2009
Resolved
Show ABS acceptance of OWS Overboard piping arrangement, or remove at next credit drydocking. Overboard line is piped into overboard ballast discharge piping. New Due date will be next DD date 18 Oct 2010.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 10 October 2010
Resolved 4 November 2010
Resolution: Appropriate arrangement noted.
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 9 December 2009
Resolved
Provide arrangements at forward Z-Drive operation station to identify Controlling Station (ECR, AFT STATION, EMERGENCY as necessary) in accordance with SOLAS 74 (amended) II-1/31.2.5. Report cleared via E-mail dated 12 Apr, Item remains open until confirmed during next CG attendance.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 January 2011
Resolved 4 November 2010
Resolution: Controlling stations identified.
Documentation › Logs/Records › Cargo Record Book (NLS)
Issued 9 December 2009
Resolved
Provide and maintain Cargo Record Book for NLS cargoes. Report cleared via E-mail dated 25Feb, Item remains open until confirmed during next CG attendance.
Action required: 705 - Other - as specified
Due 10 October 2010
Resolved 4 November 2010
Resolution: Cargo record book for NLS being utilized.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 9 December 2009
Resolved
Replace secondary mast nav light (indicating fault). Report cleared via E-mail dated 25Feb, Item remains open until confirmed during next CG attendance.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 October 2010
Resolved 4 November 2010
Resolution: No faults present.
Lifesaving › Buoyant Apparatus › Pendant
Issued 9 December 2009
Resolved
Rig Lifebuoy light pendants with splice around the body of Lifebuoy. Report cleared via E-mail dated 25Feb, Item remains open until confirmed during next CG attendance.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 October 2010
Resolved 4 November 2010
Resolution: Satisfactory arrangement.
Lifesaving › Buoyant Smoke Signals › General
Issued 9 December 2009
Resolved
Provide pendant for Bridge Wing Smoke/Lifebuoys of appropriate length. Report cleared via E-mail dated 25Feb, Item remains open until confirmed during next CG attendance.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 October 2010
Resolved 4 November 2010
Resolution: Pendant arrangement appropriate.
Fire Fighting › Fixed Gas Fire Extinguishing System › Nozzle
Issued 20 November 2008
Resolved
Install nozzle for fixed CO2 system on paint and fuel lockers.
Condition: Improper Installation
Due 30 November 2008
Resolved 9 December 2008
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 20 November 2008
Resolved
Provide an updated approved fire control plan within 90 days.
Condition: Improper/Lack of Maintenance
Due 20 February 2009
Resolved 6 February 2009
Documentation › Logs/Records › Oil Record Book
Issued 20 November 2008
Resolved
Have up to date oil record book provided to vessel within 30 days.
Condition: Improper/Lack of Maintenance
Due 20 December 2008
Resolved 5 February 2009
Navigation › Piloting/Steering › Compass Deviation Table
Issued 20 November 2008
Resolved
Provide an up to date deviation card for magnetic compass within 30 days
Due 20 December 2008
Resolved 9 December 2008
Accommodation/Occupational Safety › Occupational Safety › Storm Rail
Issued 20 November 2008
Resolved
Provide safety chains in way of rescue boat, aft hose ports and ladder starboard side 01 deck within 30 days
Condition: Improper/Lack of Maintenance
Due 20 December 2008
Resolved 5 February 2009
Fire Fighting › International Shore Connection › Not on Board
Issued 20 November 2008
Resolved
Provide gasket and four washers for international shore connection within 30 days
Condition: Improper Installation
Due 20 December 2008
Resolved 9 December 2008
Fire Fighting › Nozzles › Condition
Issued 20 November 2008
Resolved
Provide on board connecting chains for all high velocity fog adaptors, Navy all purpose nozzles.
Due 20 February 2009
Resolved 9 December 2008
Lifesaving › Rescue Boat › Markings
Issued 20 November 2008
Resolved
Properly mark rescue boat with vessels port of registry on port side.
Condition: Improper Installation
Due 20 February 2009
Resolved 9 December 2008
Navigation › Emergency Steering › Communications to Emergency Steering
Issued 20 November 2008
Resolved
update and post emergency steering procedures within 30 days
Due 20 December 2008
Resolved 9 December 2008
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 20 November 2008
Resolved
Instal automatic door closure on main engine room water tight door within 60 days.
Condition: Improper Installation
Due 20 January 2009
Resolved 9 December 2008
Operations/Management › Navigation Safety › Arrival/Departure Tests
Issued 20 November 2008
Resolved
submit automation test procedures to cg for approval within 60 days.
Due 20 February 2009
Resolved 6 February 2009
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 20 November 2008
Resolved
Provide safety guard around emergency generator alternator belt within 30 days.
Condition: Improper Installation
Due 20 December 2008
Resolved 5 February 2009
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 20 November 2008
Resolved
Install 60 second time delay for the forward machinery space within 60 days.
Due 20 February 2009
Resolved 6 February 2009
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 20 November 2008
Resolved
Provide safety guard for fan located in head on bridge within 60 days.
Due 20 January 2009
Resolved 5 February 2009
Navigation › Emergency Steering › Communications to Emergency Steering
Issued 20 November 2008
Resolved
Perform weekly Emergency steering drills once a week and provide proof to coast guard for one month.
Due 20 December 2008
Resolved 9 December 2008