NENITA is a 2006 freight ship. The Coast Guard has recorded 16 inspections since 2006, most recently in November 2021, along with 10 deficiencies and 2 operational controls.

Records from 2006 to 2021. Most recent: operational control imposed, 25 November 2021.

Built
2006
Last inspected
25 November 2021
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9304289 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
841194
Flag
MARSHALL ISLANDS
—
Maury page id
psix-841194

Inspections, by type

…with no type recorded5
Years with a record 10 calendar years (2006–2021)
The 16 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 5 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it25259 - Convention (Subpart B), Net Ton
87409 - Displacement, Ton
76807 - Dead Weight, Ton
40042 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 16

25 November 2021 Type not recorded
No type recorded · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7357515
27 October 2020 PSC B
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7080877
15 June 2017 Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6156968
5 December 2016 Loadline Exam
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6053444
19 November 2016 Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 6044218
19 November 2016 Type not recorded
No type recorded · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6046360
17 November 2016 Ballast Water Examination · Deficiency Check · ISPS II Exam · PII Safety Exam
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6035636
7 December 2015 ISPS II Exam · Ballast Water Examination · Deficiency Check · PII Safety Exam · Administrative Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5773667
16 October 2014 PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4999334
22 January 2009 Type not recorded
No type recorded · Station Little Creek · USCG East District (CGD-E) · Activity 3399840
7 July 2008 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3260142
29 November 2007 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 3106718
15 March 2007 Random ISPS/MTSA/PSC · Ballast Water Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2888231
8 March 2007 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 2881982
13 September 2006 Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2784641
7 August 2006 ISPS II Exam · Ballast Water Examination · MARPOL Annex V Examination · MARPOL Annex I Examination · PII Safety Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 2741853

Deficiency record · 10

07 - Fire Safety › N/A - No Subsystem › Jacketed high pressure lines and oil leakage alarm
Issued 27 October 2020 Resolved
01 - EXTERNAL HIGH-PRESSURE FUEL DELIVERY LINES BETWEEN THE HIGH-PRESSURE FUEL PUMPS AND FUEL INJECTORS SHALL BE PROTECTED WITH A JACKETED PIPING SYSTEM CAPABLE OF CONTAINING FUEL FROM A HIGH-PRESSURE LINE FAILURE. PSCO IDENTIFIED FUEL LEAKS ON THE NUMBER 7 HIGH PRESSURE FUEL LINE. 74solas(09) II-2/4.2.2.5.2. 17AC
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 30 October 2020
Resolved 28 October 2020
Resolution: Class report received and verified high pressure line was replaced and no longer leaking.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 17 November 2016 Resolved
1230 - Railing Cat Walks - Efficient guard rails shall be fitted to all exposed parts of the freeboard and supersturcture decks. Vessel is fitted with nylon rope in openings between guard rails. ICLL 66 Reg. 25.2, 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 November 2016
Resolution: MSU Portland received and reviewed the class report from Lloyds Register that is attached under documents.
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 17 November 2016 Resolved
0750 - Fire Prevention - Combustible materials were improperly stored in an engineering holding tank. 74 SOLAS (2009 Cons.) I/11.a, 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 November 2016
Resolution: MSU Portland received and reviewed the class report from Lloyds Register that is attached under documents.
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 17 November 2016 Resolved
0750 - Fire Prevention - The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: Structural fire protection including fire resisting divisions and protection of openings and penetrations in these divisions. The A60 insulation in the AC room was damaged. 74SOLAS(09) II-2/14-2.1.1.1 40AC
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 16 December 2016
Resolved 15 June 2017
Resolution: Cleared deficiency with proper documentation/class report. See Document for more information.
Electrical › Electric Generation Source (service) › Generator
Issued 7 December 2015 Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ON BOARD. ALL SHIP SERVICE GENERATORS WERE FOUND TO HAVE EXCESSIVE OIL LEAKAGE AND OIL SATURATED RAGS SURRONDING THE ENGINE BLOCKS.SOLAS74(14 CONS)CHAPI.REG.11a 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 December 2015
Resolution: Received class report stating the ship's crew cleaned dirty equipment and properly disposed of the rags throughout the engine room.
Engineering › Sea-water System (primary cooling) › Piping
Issued 7 December 2015 Resolved
PSCOs OBSERVED 03 TEMPORARY REPAIRS. #1 OIL SERVICE PIPE BELOW THE DECK PLATES NEAR THE #4 CYLINDER COVER. #2 PIN HOLE LEAK AND PIPE PATCH ON THE PORT SIDE GREY WATER PIPE NEAR THE OVERBOARD DISCHARGE VALVE. #3-#1 SALT WATER COOLING PIPE HAD A PATCH WEDGED WITH A BROOM STICK RIGHT AFTER THE #1 SALT WATER COOLING PUMP. PIPE CONTINUES TO LEAK SUBSTANTIALLY. SOLAS 74(14CONS) CHAP. 1 REG. 11a 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 December 2015
Resolution: Received class report stating the #1 oil service pipe was replaced with new, the grey water pipe was cropped and renewed, and the saltwater cooling line was cropped and renewed.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 7 December 2015 Resolved
MEANS SHALL BE PROVIDED TO CONTROL LEAKS OF FLAMMABLE LIQUIDS. PSCO OBSERVED OIL SOAKED RAGS THROUGHOUT THE ENGINE ROOM. NO EVIDENCE OF HOUSE KEEPING WAS OBSERVED. SOLAS 74 (04 CONS) CHAP. II-2 REG. 4.1. 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 December 2015
Resolution: Received class report stating the crew cleaned and removed oil soaked rags.
Documentation › Logs/Records › Oil Record Book
Issued 7 December 2015 Resolved
PSCO OBSERVED IN THE OIL RECORD BOOK PART I, ON 19OCT15, THE BILGE SEP. OIL TANK HAD 2.34m3 IN IT, ON 20OCT15, WITH NO DISCHARGE OR TRANSFER RECORDED, THE BILGE SEP. OIL TANK WAS LOGGED HAVING 2.07m3 IN IT. ADDITIONALLY, PSCO OBSERVED THE LEVEL OF THE BILGE TANK RISE 2.0m3 IN NOVEMEBER 2015 WITHOUT ANY TRANSFER ENTRIES MADE. MARPOL 73/78(2011) ANNEX I REG.17.3 17ac
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 December 2015
Resolution: Received class survey report stating the C/E erroneously entered the wrong information into the ORB Part I. The C/E corrected it with the correct information.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 7 December 2015 Resolved
SATISFACTORY MEANS IN THE FORM OF (GUARDRAILS, LIFE LINE, ETC.) SHALL BE PROVIDED FOR THE PROTECTION OF THE CREW IN GETTING TO OR FROM THEIR QUARTERS, MACHINERY SPACE, AND ALL OTHER PARTS USED IN THE WORK OF THE SHIP. 03 GUARDRAILS WERE OBSERVED BROKEN IN THE ENGINE ROOM CREATING AN UNSAFE WORK ENVIRONMENT. ICLL 66 REG.25 50ac
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 January 2016
Resolved 12 December 2015
Resolution: Received class survey stating the crew reinforced the weakened guard rails in the E/R.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 7 August 2006 Resolved
Vessel has no Non-Tank Vessel Response Plan. Submit Non-Tank Vessel Response Plan to U.S Coast Guard (G-PCV-1)
Action required: 705 - Other - as specified
Resolved 13 September 2006
Resolution: Rcvd copy of G-PCV-1 fax & verified via e-vrp that vsl submitted NTVRP.