NERISSA is a tank ship. The Coast Guard has recorded 2 inspections since 2017, most recently in December 2018, along with 3 deficiencies.

Records from 2017 to 2018. Most recent: inspection, 7 December 2018.

Built
Not recorded
Last inspected
7 December 2018
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Identity

9331244
850466
Flag
MARSHALL ISLANDS
Maury page id
psix-850466

This record may be incomplete: the most recent inspection recorded for this vessel was 8 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspections, by type

Years with a record 2 calendar years (2017–2018)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. The counts in the strip above are the same counts; this table splits the inspections by the kind of activity recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Documentation record

Tonnage as PSIX records it159407 - Convention (Subpart B), Gross Ton
96392 - Convention (Subpart B), Net Ton
299235 - Dead Weight, Ton
344300 - Displacement, Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report

A report is not offered for this hull. Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 2

7 December 2018 ISPS II Exam · Deficiency Check · Ballast Water Examination · COC-TVE Renew
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6586774
12 May 2017 Ballast Water Examination · COE-Offshore · ISPS II Exam · COC-TVE Renew · PII Safety Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6144793

Deficiency record · 3

07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 7 December 2018 Resolved
74SOLAS(14)II-2/4.5.5.3.2 FSS 15.2.4.2.1.2 ISSUED 60AC THE IGS REFERRED TO IN PARAGRAPH 5.5.3.1 SHALL BE DESIGNED, CONSTRUCTED AND TESTED IN ACCORDANCE W/ FSS. INSTRUMENTATION SHALL BE FITTED FOR CONTINUOUSLY INDICATING AND PERMANENTLY RECORDING WHEN IGS IS BEING SUPPLIED: THE OXYGEN CONTENT OF THE IGS IN THE IGS SUPPLY MAINS ON THE DISCHARGE SIDE OF THE BLOWERS. PSCO OBSERVED DURING ALARM TESTS FROM CCR HIGH 02 ALARM ON IGS WAS INOPERABLE.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 December 2018
Resolution: Received Class report from ABS attesting to satisfactory repairs.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 7 December 2018 Resolved
74SOLAS(14)I/11(B) ISSUED 60AC AFTER ANY SURVEY OF THE SHIP UNDER REGULATIONS 7,8,9 OR 10 HAS BEEN COMPLETED, NO CHANGE SHALL BE MADE IN THE STRUCTURAL ARRANGEMENTS, MACHINERY EQUIPMENT AND OTHER ITEMS COVERED BY THE SURVEY, W/O THE SANCTION OF THE ADMINISTRATION. PSCO DISCOVERED NEWLY INSTALLED 02 ANALYZER W/O ANY DOCUMENTATION OR APPROVAL FROM CLASS.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 December 2018
Resolution: Received Class report from ABS attesting to satisfactory repairs.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 7 December 2018 Resolved
74SOLAS(14)II-2/4.5.5.3.2 FSS 15.2.3.1.2.1 ISSUED 10C THE IGS REFERRED TO IN PARAGRAPH 5.5.3.1 SHALL BE DESIGNED, CONSTRUCTED AND TESTED IN ACCORDANCE W/ FSS. SPECIAL CONSIDERATION SHALL BE GIVEN TO THE DESIGN AND LOCATION OF SCRUBBER AND BLOWERS W/ RELEVANT PIPING AND FITTINGS IN ORDER TO PREVENT FLUE GAS LEAKAGES INTO ENCLOSED SPACES. PSCO IDENTIFIED FLUE GAS LEAKING INTO SPACE IN VICINITY OF BOTH O2 ANALIZERS. FLUE GAS WAS LEAKING FROM ASSOCIATED IG LINE/VALVE.
Action required: 10 - Deficiency Rectified
Resolved 8 December 2018
Resolution: Crew installed correct blank flange to prevent Flue gas leaking.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.