Records from 2006 to 2026. Most recent: inspection, 14 April 2026.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 18
14 April 2026
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8345865
13 May 2025
DAPI Audit · Hull Examination · Deficiency Check · COI Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8139335
22 May 2024
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7927633
23 May 2023
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7702090
7 June 2022
DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7478672
13 April 2021
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7179715
4 August 2020
Hull Examination · COI Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7019575
19 May 2020
Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6963618
20 May 2019
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6685745
8 May 2018
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6402561
2 May 2017
DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6133928
3 May 2016
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 5863744
11 June 2014
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4854538
15 May 2012
Administrative Inspection · Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4305957
11 May 2009
Annual Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3468522
13 May 2008
Annual Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3192079
5 June 2007
Deficiency Check · Annual Inspection
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2910940
8 June 2006
Initial Certification · Construction Oversight · Plan Review "T" Boat · Deficiency Check · Hull Examination
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2769850
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 13 May 2025
Resolved
The marine employer must have a sufficient number of alcohol testing devices readily accessible on board the vessel to determine the presence of alcohol in the system of each individual who was directly involved in the SMI. Vsl was missing alcohol test equipment.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 June 2025
Resolved 27 May 2025
Resolution: Test strips placed on board.
Fire Fighting › Fire Bucket › Capacity
Issued 8 May 2018
Resolved
JS01: Provide two 2.5 gallon fire buckets w/ lanyards.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2018
Resolved 12 June 2018
Resolution: Received statement from Owner which stated the appropriate fire buckets had been placed onboard. Photographs were provided which substantiate this.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 8 May 2018
Resolved
JS02: Provide Lifeline for Ring Buoy.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2018
Resolved 12 June 2018
Resolution: Received statement from owner indicating a new lifeline was installed. Photographs were provided which substantiate this.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Location
Issued 8 May 2018
Resolved
JS03: Provide additional 2-A fire extinguisher.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2018
Resolved 12 June 2018
Resolution: Received statement from Owner that an A-2 fire extinguisher was placed on the vessel. Photographs were provided which substantiate this.
Communications › Alarms/Indicators › Fire Alarm
Issued 5 June 2007
Resolved
Make fume detector operable.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 July 2007
Resolved 5 July 2007
Operations/Management › Drills/Instruction › Not Conducted
Issued 5 June 2007
Resolved
Conduct man-overboard, fire, and abandon-ship drills and record.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 July 2007
Resolved 5 July 2007
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 5 June 2007
Resolved
Provide proof of enrollment in a chemical testing program.
Action required: 705 - Other - as specified
Due 5 July 2007
Resolved 5 July 2007
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 7 June 2006
Resolved
Prove proper operation of fire boy fixed system. Interlock is not properly functioning and blowers do not turn off when fire boy is tested. To be completed prior to operating with passengers.
Due 30 June 2006
Resolved 10 August 2006
Resolution: Completed
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 7 June 2006
Resolved
Provide retro tape for ring buoy and stencil with name of vsl.
Due 30 June 2006
Resolved 10 August 2006
Resolution: Completed
Construction/Loadline › Hull › Longitudinal Frame
Issued 7 June 2006
Resolved
Provide welding plan for cleaning up welds marked by CG inspector and make repairs to deficient welds.
Due 30 June 2006
Resolved 8 June 2006
Resolution: Completed
Fire Fighting › Ventilation Systems › Operating Controls
Issued 7 June 2006
Resolved
Provide vent closures for engine space ducting.
Due 30 June 2006
Resolved 8 June 2006
Resolution: Completed