MAURY USCG vessel records
← All vessels

KNOTTS ISLAND

Built
1962
Last inspected
13 July 2023
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 3 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 13 July 2023
…with no type recorded1
…past their stated due date2
Operational controls None recorded without a removal date
Years with a record 6 calendar years (2016–2023)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDJ4550
Flag
UNITED STATES
Maury page id
psix-85691

Documentation record

Registered dimensions (L × B × D)66.8 ft × 28.0 ft × 6.6 ft
Registered tonnagegross 99 / net 54
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderWILMINGTON, DE, UNITED STATES · built 1962
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portHULL, MA
Endorsements, as the file codes themcw_un
DocumentationValid · issued 8 August 2025 · expires 31 August 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it99 - Regulatory (Subpart C or D), Gross Ton
54 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 13 inspections, each with its date, unit and type; 28 deficiencies with the resolution recorded against each, 2 without one; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 13

13 July 2023 Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7741634
1 December 2020 Deficiency Check · COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7101459
22 October 2020 Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7093098
15 September 2020 Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7058490
25 July 2019 Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6760791
11 September 2018 Administrative Inspection
Administrative · Navigation Center · Activity 6538019
24 July 2018 Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6489354
11 June 2018 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6442252
4 June 2018 Damage Survey · Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6435570
8 May 2017 COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6141107
28 June 2016 Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5922155
6 May 2016 Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5870486
31 March 2016 Drydock Extension · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5844455

Deficiency record · 28

01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 13 July 2023 No resolution recorded
Your vessel must undergo an annual inspection within the 3 months before or after each anniversary date. Vessel is overdue for an Annual Inspection. Complete Annual Inspection prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 July 2023 — due date passed with no resolution recorded
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 13 July 2023 No resolution recorded
A vessel that is exposed to salt water more than three months in any 12 month period since the last examination must undergo a drydock examination and an internal structural at least once every two years. Vessel is overdue for drydock examination and internal structural examination. Complete credit Hull Exam prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 July 2023 — due date passed with no resolution recorded
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 18 December 2020 Resolved
Penetrations of required watertight bulkheads by any rigid plastic pipe systems are prohibited, except when: Each such penetration is accomplished using a metallic fitting, welded or otherwise attached to the bulkhead by an accepted method; and an acceptable metallic shutoff valve is installed adjacent to the through bulkhead fitting. This valve shall be operable from above the bulkhead deck. There is a plastic sewage pipe penetrating the watertight bulkhead between the engine room and the tank space without valves. 46 CFR 182.40-1
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 January 2021
Resolved 29 January 2021
Resolution: Bulkhead penetration was capped with a 2.5" steel threaded steel plug. PVC sewage pipe disconnected, system no longer in service as per Master [name withheld]
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 1 December 2020 Resolved
The vessel fire pump must be capable of pumping at a pressure not less than 60 psi. The gauge on the pump was reading ~32 psi. Ensure the pump is capable of meeting the minimum pumping pressure.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 December 2020
Resolution: Observed the correct operation of the firepump.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 1 December 2020 Resolved
At each inspection for certification the marine inspector shall require that all observed unsafe practices and hazardous situations be corrected. The exhaust lagging on the main service generator is saturated with oil and is creating a fire hazard. Identify the source of the leak, make permanent repairs and install new lagging. 46 CFR 176.25-50
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 December 2020
Resolution: Observed the replacement of the lagging.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 1 December 2020 Resolved
At each inspection for certification the marine inspector shall require that all observed unsafe practices and hazardous situations be corrected. The main service generator is leaking oil and creating a fire hazard. Identify the source of the leak and make permanent repairs. 46 CFR 176.28-50
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 December 2020
Resolution: Observed the source of the leak was secured.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 1 December 2020 Resolved
At each inspection for certification the marine inspector shall require that all observed unsafe practices and hazardous situations be corrected. One of the lube oil lines which connect to the main service generator is leaking oil and creating a fire hazard. Identify the source of the leak and make permanent repairs. 46 CFR 176.28-50
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 December 2020
Resolution: Observed the source of the leak was secured.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 1 December 2020 Resolved
The vessel shall have visual and audible alarms at the operating station to indicate a high water level in each normally unmanned space. The vessel has no bilge high level alarms installed. Install the required bilge alarms in each unmanned space.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 December 2020
Resolution: A new high water alarm system was installed and operable
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 1 December 2020 Resolved
Flexible hose designed for use with hose clamps may be installed with two clamps, at both ends of the hose. There are two lube oil hoses connecting to the main service generator which are not double clamped on both ends. Add clamps to both ends of each line.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 December 2020
Resolved 18 December 2020
Resolution: Both ends are now double clamped.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 1 December 2020 Resolved
Battery connections must be made with permanent type connectors. There are four batteries in the engine room which are utilizing temporary connectors. Replace the temporary connectors with permanent connectors. 46 CFR 183.05-20(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 December 2020
Resolved 18 December 2020
Resolution: The temp connections have been replaced with perm. connections.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 1 December 2020 Resolved
The compass must be illuminated. The compass lacks a light. Ensure the compass has illumination.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 December 2020
Resolution: Verified the correct operation of the light.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 1 December 2020 Resolved
The vessel shall have appropriate charts for the intended voyage that are up to date. The vessel’s charts are not up to date or corrected. Ensure up to date charts are on board.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 December 2020
Resolved 29 December 2020
Resolution: Updated chart onboard.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 1 December 2020 Resolved
Each lighting fixture globe, must have a guard or be made of high strength material. The port light fixture in the engine room is cracked. Replace the light fixture.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 December 2020
Resolved 18 December 2020
Resolution: Confirmed that the light fixture was replaced.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 1 December 2020 Resolved
Penetrations of required watertight bulkheads by any rigid plastic pipe are prohibited. The fuel tank space has a plastic pipe penetrating the watertight bulkhead into the engine room. Report back to the USCG what system this is part of. After reporting the system, submit a plan proposal for addressing the penetration.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 December 2020
Resolved 18 December 2020
Resolution: Upon visiting vessel for a deficiency check, a new deficiency was issued via a second CG835V with a requirement to make the penetration compliant with 46 CFR 182.40-1
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 1 December 2020 Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules. The port navigation light cover is cracked and not watertight. Make the cover watertight.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 December 2020
Resolved 14 January 2021
Resolution: Lens replaced in kind.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 1 December 2020 Resolved
Each ring life buoy on a vessel must meet the requirements in 46 CFR 160.050. All three ring buoy's on board have unserviceable grab lines. Replace each ring buoy with a serviceable ring buoy.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 December 2020
Resolved 18 December 2020
Resolution: Ring buoys were replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 25 July 2019 Resolved
A vessel must be provided with bilge pumps in accordance with Table 182.520(a). Table requires two fixed power pumps. Vessel's bilge pump cannot de-water any spaces.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 15 August 2019
Resolution: Witnessed satisfactory operation of bilge pump dewatering a void space.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 July 2019 Resolved
Shut-off valves installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel stop fuel flow when servicing accessories. The shutoff valve at the tank shall be operable from outside the tank compartment, preferably from an accessible position on the weather deck. Vessel operator could not close fuel shut off valve.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Resolved 25 July 2019
Resolution: Vessel crew worked shut off valve to ensure proper operability.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 July 2019 Resolved
Th minimum capacity of power fire pump shall be 50 gallons per minute at a pressure of not less than 60 pounds per square inch at the pump outlet. The pump outlet shall be fitted with a pressure gauge. The fire pressure gauge read 40 psi at the pump outlet while testing the fire main
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 August 2019
Resolved 15 August 2019
Resolution: Vessel's fire pump cannot produce 60 psi but does provide an adequate stream of water from the discharge side of fire hose.
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 25 July 2019 Resolved
Each entrance to a space storing carbon dioxide cylinders, a space protected by carbon dioxide systems, or any space into which carbon dioxide might migrate must be conspicuously marked as stated in 46 CFR 185.612 (g) The entrance to the space storing CO2 cylinders is not marked.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 15 August 2019
Resolution: Visually inspected newly affixed warning sign to entrance of space containing CO2 cylinders.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 11 September 2018 Resolved
Vsl is broadcasting invalid MMSI, Vsl is broadcasting Invalid Call Sign and Vsl is broadcasting no dimension information (AIS Antenna Position ABCD values equals 0)
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 15 August 2019
Resolution: Verified that AIS information was updated and displaying correct information.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 July 2018 Resolved
Repair steering gear piping and prove proper operation while exercising steering system.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 August 2018
Resolution: Steering gear piping replaced with satisfactory operation of steering system.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 24 July 2018 Resolved
Replace buoyant apparatus with life float. 46CFR 180.205
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 August 2018
Resolution: Vessel is requesting COI amendment to change route type to operate on a LBS within one mile of land. IAW 46CFR180.207(d) new route will not require vessel to carry survival craft.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 24 July 2018 Resolved
Repair/replace vessel's compass and prove proper operation away from dock. 46 CFR 184.402
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2018
Resolved 24 August 2018
Resolution: Received copy of compass deviation card dated 22AUG2018
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 24 July 2018 Resolved
Repair hole in deck at Stbd bow.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 August 2018
Resolved 17 August 2018
Resolution: Hole in deck repaired; clad welded.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 July 2018 Resolved
Remove dead-end wires under operating station or terminate in junction box. 46 CFR 183.200(a)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 August 2018
Resolved 17 August 2018
Resolution: Electronic module associated with dead-end wires removed until proper installation can be performed.
Construction/Loadline › Hull › Hull Plating
Issued 31 March 2016 Resolved
Crop and renew hole on bulkhead between engine room and lazarette on port side.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 April 2016
Resolved 6 May 2016
Resolution: Clad welding permitted to complete repair. Repair SAT.
Construction/Loadline › Hull › Longitudinal Frame
Issued 31 March 2016 Resolved
02 Frames on STBD side of lazarette are wasted. Crop and renew.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 April 2016
Resolved 6 May 2016
Resolution: Review of additional stiffeners added showed increased structure in the space. SAT.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.