Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Registered dimensions (L × B × D)200.0 ft × 35.0 ft × 12.0 ft
Registered tonnagegross 705 / net 705
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderWEST GULF MARINE LTD · PALACIOS, TX, UNITED STATES · built 2007
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portWILMINGTON, DE
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 16 March 2026 · expires 31 March 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it705 - Simplified, Gross Ton 705 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Inspection history · 25
11 July 2025Examination of Repairs · Administrative Inspection
Port side damage is as follows.
Bow void starting at collision bulkhead forward 6' up rake slope sheet bottom plate and knuckle is pushed up in an area 4-5 foot wide.
Bottom transition plate 4-5" forward of bulkhead 24-26" inboard of port knuckle. Bulkhead stiffener angle has punched hole in plate approximately 1/2" x 1-32.
Starboard side damage is as follows
1st sidelong knuckle bracket aft headlog approximately at 9' draft mark 3 pin holes in weld
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 September 2022
Resolved 21 October 2022
Resolution: Conducted satisfactory repairs to damaged sections.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 20 April 2022Resolved
During each inspection or reinspection for certification, all wing voids, rakes, cofferdams, and other void spaces on tank barges must be opened and checked from on-deck for the presence of water or cargo indicating hull damage or cargo tank leakage. All wing voids had 3-5" of water in them throughout. Remove all water as required (CORRECTED)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 20 April 2022
Resolution: Vessel reps pumped out all void spaces as required.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Loading instrument
Issued 20 April 2022Resolved
A pressure gage shall be installed for each pump discharge, and it shall be located at a point visible with respect to the pump controls. Pressure gages for pump discharge not position to be seen at operator controls. Adjust gage as required. (CORRECTED)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 20 April 2022
Resolution: Change position of cargo pump pressure gage
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 April 2022Resolved
Openings for fill and vent pipes must be on the topmost surface of a tank. There must be no openings in the bottom, sides, or ends of a tank except an opening fitted with threaded plug or cap may be used on the bottom of the tank for tank cleaning purposes. Clean-out on bottom of tank is equipped with a flange fitting. Apply flange shielding as required.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 June 2022
Resolution: Attended barge, visually examined flange zhielding, all found sat.
Scantlings, material, and workmanship, subdivision of cargo spaces, fitting of cofferdams, and testing of tanks shall be at least equivalent to the requirements of the American Bureau of Shipping or other recognized classification society. The following deficiencies were
identified:
1) #2 STBD Wing Void - #4 Outboard side vertical hull frame - cracked weld on bottom - pick-up
2) #2 STBD Wing Void - #5 Outboard side vertical hull frame - cracked frame on top - crop and renew
3) #3 STBD Wing Void - #2 Outboard side vertical hull frame - cracked weld on top - pickup
4) #5 STBD Wing Void - #3 Outboard side vertical hull frame - cracked weld on top - pick-up
5) #5 STBD Wing Void - #3 Outboard side vertical hull frame - cracked weld on top - pick-up
6) #5 STBD Wing Void - #4 Inboard side vertical hull frame - missing weld at bilge frame - weld
7) Aft void - Starboard quarter tie beam second from top bent and broken from hull - crop and renew
8) #2 Port Wing Void - #4 Outboard side deck stiffener - cracked on top - apply relief hole, gouge out and weld or crop and renew.
9) #3 Port Wing Void - #4 and #5 Outboard side vertical hull frame - cracked weld on top - pickup
For above deficiencies, apply proper repairs in accordance with NVIC 07-69.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 17 June 2022
Resolution: Attended barge, conducted satisfactory air tests at 1.5 psi, of the following repairs: 02 side shell plate inserts on the port side #1 and #2 voids and watertight bulkhead plate insert between STBD voids #3 and #4.
Pinhole leak on the cargo pipe, 15" forward of the header.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 December 2014
Resolution: Inspected repair and witnessed satisfactory hydro test to 1.5x MAWP.
Construction/Loadline › Structures › Trunk
Issued 15 April 2009Resolved
Vessel has stbd side wing voids with cargo order vessel required to clean and gas free and find problems.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 17 April 2009
Resolution: Vessel conducted pressure test of all cargo tanks and no leaks were found .
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.