MAURY USCG vessel records
← All vessels

SHIMANAMI STAR

SHIMANAMI STAR is a 2006 freight ship. The Coast Guard has recorded 3 inspections in 2023, along with 4 deficiencies — 2 with no resolution recorded — and 1 operational control.

Records in 2023. Most recent: inspection, 10 September 2023.

Built
2006
Last inspected
10 September 2023
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 3 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.

Inspection record

Last inspected 10 September 2023
…with no type recorded1
…past their stated due date1
Operational controls None recorded without a removal date
Years with a record 1 calendar year (2023)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9377717
860320
Flag
BAHAMAS, THE
Maury page id
psix-860320

Documentation record

Tonnage as PSIX records it16960 - Convention (Subpart B), Gross Ton
10498 - Convention (Subpart B), Net Ton
34593 - Displacement, Ton
28447 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report

A report is not offered for this hull. Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 3

10 September 2023 Ballast Water Examination · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7788584
8 September 2023 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7787918
8 September 2023 COE-Offshore
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7787927

Deficiency record · 4

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 September 2023 No resolution recorded
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed temporary soft patch on NO.1 saltwater cooling outlet pipe. 74SOLAS(04)I/11.a
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 October 2023 — due date passed with no resolution recorded
08 - Alarms › N/A - No Subsystem › UMS - alarms
Issued 10 September 2023 Resolved
Bilge wells in periodically unattended machinery spaces shall be located and monitored in such a way that the accumulation of liquids is detected at normal angles of trim and heel, and shall be large enough to accommodate easily the normal drainage during the unattended period. PSCO observed accumulation of excessive quantity of water in bilge wells causing all bilge high-level alarms to be activated. 74SOLAS(04)II-1/48.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 September 2023
Resolution: Vessel submitted reciept showing bigle water was pumped to shore facilty and disposed.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 10 September 2023 Resolved
Hydraulic power-operated steering gear shall be provided with the following: a fixed storage tank having sufficient capacity to recharge at least one power actuating system including the reservoir. PSCO observed level in storage tank below required minimum level. 74SOLAS(04)II-1/29.12.3
Action required: 10 - Deficiency Rectified
Resolved 10 September 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 September 2023 No resolution recorded
All electric cables and wiring external to equipment shall be at least of a flame-retardant type and shall be so installed as not to impair their original flame-retarding properties. PSCO observed multiple wire runs that are rusted through or back out of the stuffing tube/gland to include the following locations: temperature sensor for reefer pump, bilge and ballast pump, general service/fire pump, aft bilge well high level float switch, freshwater generator, and aux engine NO.3. 74SOLAS(04)II-1/45.5.2
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.