Records from 2006 to 2026. Most recent: inspection, 6 April 2026.
Documentation record
Registered dimensions (L × B × D)85.1 ft × 34.0 ft × 10.0 ft
Registered tonnagegross 303 / net 207
ITC dimensions (L × B × D)85.1 ft × 34.0 ft × 10.0 ft
ITC tonnagegross 374 / net 112
BuilderQUALITY SHIPYARDS LLC · HOUMA, LA, UNITED STATES · built 2007
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationMonohull
Hailing portWILMINGTON, DE
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 11 December 2025 · expires 31 January 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it303 - Regulatory (Subpart C or D), Gross Ton
374 - Convention (Subpart B), Gross Ton
207 - Regulatory (Subpart C or D), Net Ton
112 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 25
6 April 2026
Damage Survey
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 8343906
17 July 2025
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8188335
15 May 2025
Administrative Inspection
Administrative · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 8137144
12 August 2024
Administrative Inspection · In-Service Inspection · MTSA Verification
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7979342
6 June 2022
Administrative Inspection
Administrative · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7470476
6 June 2022
Type not recorded
No type recorded · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7480376
5 June 2022
Administrative Inspection
Administrative · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7470082
17 May 2022
Administrative Inspection · Initial Certification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7452757
16 April 2020
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 6962880
11 July 2018
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6475763
31 March 2016
DAPI Audit · MTSA Verification · Administration · Industry Initiated Exam
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 5845056
14 September 2014
Type not recorded
No type recorded · Station Sabine · USCG Heartland District (CGD-H) · Activity 4992474
10 September 2014
Type not recorded
No type recorded · Station Sabine · USCG Heartland District (CGD-H) · Activity 4979651
25 August 2013
Type not recorded
No type recorded · Marine Safety Detachment Quad Cities · USCG Heartland District (CGD-H) · Activity 4697933
29 May 2013
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4610751
28 January 2013
MTSA Verification · Industry Initiated Exam · DAPI Audit · Administration
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 4524464
8 September 2010
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3846050
30 August 2010
Type not recorded
No type recorded · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 3839808
29 June 2010
MTSA Verification · Administration · Deficiency Check · Industry Initiated Exam
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 3780399
16 December 2009
DAPI Audit
Administrative · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 3651355
15 December 2009
Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3651204
28 March 2009
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3452328
27 March 2009
Type not recorded
No type recorded · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 3452325
1 December 2007
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 3109946
14 November 2006
Security Plan Amendment Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2820504
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 6 April 2026
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and the safety of persons onboard under normal and emergency conditions.
During normal vessel operation, the starboard generator went offline due to a presumed failed water pump. Upon arrival to landing at MM 661 of the LMR, prior to movement, diagnose cause of failure and affect permanent repairs to the satisfaction of the TPO. 46 CFR 143.205a
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Due 6 April 2026
Resolved 7 April 2026
Resolution: ABS submitted a satisfactory closeout report stating the water pump was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 May 2025
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons on board under normal and emergency conditions. Vessel experienced an oil leak on their oil cooler serving the port gear box. Identify the cause and repair to the satisfaction of the TPO. Provide objective evidence to the CG.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 May 2025
Resolution: Recieved TPO report.