Records from 2012 to 2026. Most recent: inspection, 22 April 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the recorded names, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 29
22 April 2026
Deficiency Check · Annual Inspection
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 8341290
22 April 2025
Deficiency Check · Annual Inspection
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 8117165
4 December 2024
Drydock Exam
Physical examination · OP location-Sector Honolulu Prevention Department- Kailua Kona · USCG Oceania District (CGD-O) · Activity 8043473
14 May 2024
Deficiency Check · Annual Inspection
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 7912348
25 March 2024
Plan Review "T" Boat · Construction Oversight
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7884427
4 October 2023
Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7803124
19 April 2023
Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7671372
1 June 2022
Damage Survey · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7467914
6 April 2022
Deficiency Check · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7425512
16 September 2021
Drydock Exam · Deficiency Check · In-Service Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7319998
1 July 2021
Deficiency Check · DAPI Audit
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7282993
18 May 2021
Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7200372
25 June 2020
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6986693
26 September 2019
Drydock Exam · In-Service Inspection · Administrative Inspection · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6820178
24 June 2019
Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6724475
5 June 2019
Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6710022
28 May 2019
Administrative Inspection · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6697688
17 April 2019
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6973374
26 October 2018
Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6569020
5 October 2018
Administrative Inspection · Damage Survey
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6555783
8 May 2018
Annual Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6409602
10 September 2017
Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6264645
5 September 2017
Drydock Exam · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6249909
4 August 2017
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6230766
16 May 2017
COI Inspection · DAPI Audit · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6145139
1 May 2017
In-Service Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6137672
30 August 2016
DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6017171
10 March 2016
Deficiency Check · Damage Survey
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5830428
9 March 2016
Administrative Inspection · Damage Survey · Examination of Repairs
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5831958
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 22 April 2026
Resolved
On a vessel of more than 65 feet in length carrying more than 49 passengers, the minimum capacity of the fire pump must be 50 gallons per minute at a pressure on not less than 60 PSI at the pump outlet. The fire pump outlet pressure gauge is inoperable. Vessel restricted to no more than 49 passengers until 60psi pressure gauge reading at the fire pump outlet is provided. 46 CFR 181.300(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 May 2026
Resolved 22 April 2026
Resolution: New gauge installed
09 - Working and Living Conditions › 092 - Working Conditions › Gangway, accommodation-ladder
Issued 22 April 2025
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances. Port forward ladder, elbow mounting plate observed to have stress crack at the joint. Requires renewal. Vessel shall only use starboard ladder to load passengers until new mounting plates are installed. 46CFR176.802(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 May 2025
Resolved 29 April 2025
Resolution: New mounting plates installed
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 22 April 2025
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances. Broken rail gussets identified. requires repair. (02) port, (01) starboard. 46CFR176.802(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 May 2025
Resolved 8 May 2025
Resolution: Rail gusset welds repaired.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 14 May 2024
Resolved
Each life jacket must be marked with Type I retro reflective material approved in 46 CFR 164.018. Numerous life jackets had deteriorated retro reflective material. Provide appropriate markings to the satisfaction of the attending marine inspector.
46 CFR 185.604
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2024
Resolved 20 May 2024
Resolution: Retro tape provided.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 14 May 2024
Resolved
Each rescue boat must be marked with Type II retro reflective material approved in accordance with 46 CFR 164.018. Life float retro tape was deteriorated. Provide new retro reflective type material on all life floats.
46 CFR 185.604(i)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2024
Resolved 21 May 2024
Resolution: Retro tape provided for life floats.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 May 2024
Resolved
A visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces. Engine room port and starboard, and port head visual and audible alarms not operational. Provide operational visual and audible high level bilge alarms.
46 CFR 182.530(a)
Action required: 10 - Deficiency Rectified
Resolved 14 May 2024
Resolution: New bilge float switches provided.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 14 May 2024
Resolved
Vessels operated solely within 20 nautical miles of land must be equipped with a VHF-DSC radiotelephone installation meeting the requirements of § 80.1101(c)(2)
Vessel does not have operational DSC capable VFH.
Provide DSC capable VHF radio.
47 CFR 80.905
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2024
Resolved 20 May 2024
Resolution: New VHF radio installed with DSC capability.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 14 May 2024
Resolved
Each item of lifesaving equipment determined by the marine inspector to not be in serviceable condition must be repaired or replaced. Vessel's daisy chain line between life floats deteriorated. Provide new daisy chain line between life floats.
46 CFR 176.808(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2024
Resolved 21 May 2024
Resolution: New daisy chain for life floats.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 14 May 2024
Resolved
Each item of lifesaving equipment determined by the marine inspector to not be in serviceable condition must be repaired or replaced. Vessel's top life float cracked at numerous locations. Life float still serviceable but needs repairs. Male proper repairs to life float using [name withheld] product.
46 CFR 176.808(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2024
Resolved 9 June 2024
Resolution: Repairs made to life float with [name withheld] product.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 May 2024
Resolved
Battery installations must be mounted too protect against shifting of the vessel and free from exposure to water splash or spray. Port side engine room battery box missing lid. Provide suitable protection against exposure to water or spray.
46 CFR 183.350
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2024
Resolved 24 May 2024
Resolution: Battery cover provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 May 2024
Resolved
Exhaust piping must be properly supported by noncombustible hangers or blocks. Port engine room exhaust piping was not secured. Provide blocks or hangers to secure port engine room exhaust piping.
46 CFR 182.430(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2024
Resolved 27 May 2024
Resolution: Exhaust hanger provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 May 2024
Resolved
In systems and applications where flexible hoses are permitted to be clamped: Double hose clamping is required where practicable. Missing double hose clamps on numerous systems. Provide double hose clamps on all flexible hoses.
46 CFR 182.410 (d) (1)
Action required: 10 - Deficiency Rectified
Resolved 14 May 2024
Resolution: Double hose clamps provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 14 May 2024
Resolved
Strong and effective rudder stops must be provided to prevent jamming and damage to the rudder and its fittings. Starboard side steering system missing rudder stop. Provide rudder stop starboard side.
46 CFR 182.610
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2024
Resolved 27 May 2024
Resolution: Rudder stop provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 14 May 2024
Resolved
Provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. All closure devices must be readily available and mounted in the vicinity of the vent. Ventilation closures port and starboard side vent flaps did not close when pulled. Provide means of closing ventilations to engine rooms.
46 CFR 182.465(h)
Action required: 10 - Deficiency Rectified
Resolved 14 May 2024
Resolution: Ventilation closed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 May 2024
Resolved
All fiber reinforced plastic vessels constructed with general purpose resins must be fitted with a smoke activated fire detection system of an approved type installed in accordance with 76.27 in subchapter H of this chapter in accommodation spaces and service spaces. Vessel does not a have smoke activated fire detection
system for required spaces. Provide smoke activated
fire detection system and install to the satisfaction of the attending marine inspector.
46 CFR 177.410(c)(3)(ii)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 May 2024
Resolved 9 October 2024
Resolution: Smoke detection system special consideration for interconnected detection and alarm system approved. Test satisfactory. (Letter 16711/24-235 Sector Honolulu)
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 19 April 2023
Resolved
A vessel must comply with the applicable requirements for EPIRB installations issued by the FCC. During testing of EPIRD red light flashed prior to test sequence. Contact manufacturer and provide explanation of red light. In the meantime vessel is restricted to trips within 3 miles from land.
46 CFR 184.502
Action required: 705 - Other - as specified
Resolved 26 April 2023
Resolution: New EPIRB provided.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 19 April 2023
Resolved
A vessel on which a pre-engineered fixed gas fire extinguishing system is installed mush have the following equipment at the operating station: a light to indicate discharge, and and audible alarm that sounds upon discharge. Starboard visual alarm at operating station not operational and port audible alarm at operating station not operational. Provide both visual and audible alarms for port and starboard pre-engineered fixed gas extinguisher at operating station.
46 CFR 181.420(b)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 April 2023
Resolution: Both port and starboard visual and audible alarms operational.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 19 April 2023
Resolved
A hatch must have securing devices. Port side lazz hatch missing dogs. Provide hatch with dogs.
46 CFR 179.360(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 May 2023
Resolved 21 April 2023
Resolution: New dogs provided for hatch.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 19 April 2023
Resolved
A spanner wrench must be provided where a 1.5 inch diameter fire hose is required. Spanner wrench missing. Provide spanner wrench.
46 CFR 181.310(d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 May 2023
Resolved 26 April 2023
Resolution: Spanner wrench provided.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 19 April 2023
Resolved
Each nozzle must be of corrosion-resistant material and be capable of being changed between a solid stream and a spray pattern. A nozzle on a vessel of not more than 65 feet in length carrying more than 49 passengers must: (1) Be of a type approved in accordance with approval series 162.027; or (2) Be of a type recognized by the Commandant as being equivalent in performance. Current nozzle onboard vessel is plastic and does not meet 162.027. Provide nozzle that meets 162.027.
46 CFR 181.320(d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 May 2023
Resolved 26 April 2023
Resolution: Nozzle provided.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 June 2022
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of the COI giving consideration to provisions for a seaworthy hull. Vessel ran aground causing propeller, shaft, rudder damage and causing water ingress through shaft log. Cracks in FPR found in Port engine room. Space under constant monitoring. Vessel currently taking on water at rate that pumps can keep up with in port engine room. Operator must provide tow plan and take vessel to emergency dryock for hull and machinery inspection and repairs prior to taking passengers.
46 CFR 177.100
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 June 2022
Resolution: Repairs made and sea trial conducted.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 6 April 2022
Resolved
A visual and audible alarm must be provided at the operating station to indicate a high water level in each engineering space. Starboard laz had inoperable bilge high level alarm. Provide operational high water bilge alarm.
46 CFR 182.530
Action required: 10 - Deficiency Rectified
Resolved 6 April 2022
Resolution: New float installed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 6 April 2022
Resolved
Life jackets must be marked with retro reflective material. Retro reflective materials on life jackets was worn out. Provide new retro reflective material for life jackets.
46 CFR 185.604(h)
Action required: 10 - Deficiency Rectified
Resolved 6 April 2022
Resolution: Retro tape provided.
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 6 April 2022
Resolved
The radar and its installation must be suitable for the intended route of the vessel. Radar overlay on GPS was not inline with GPS. Pictures did not overlap giving unclear picture of which system is working properly. Provide accurate Radar visual.
46 CFR 184.404
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 May 2022
Resolved 20 April 2022
Resolution: Radar adjusted to work properly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 April 2022
Resolved
Machinery and equipment installed must be suitable for the vessel and its operation for the purpose intended. Port steering ram where heim fitting is connected to ram is damaged and bent. Provide new parts to make as designed.
46 CFR 182.100
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 May 2022
Resolved 14 September 2022
Resolution: New steering rams installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 April 2022
Resolved
Machinery and equipment installed must be suitable for the vessel and its operation for the purpose intended. Port and starboard steering rams both have corroded hydraulic valves. Provide new valves on steering gear.
46 CFR 182.100
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 May 2022
Resolved 14 September 2022
Resolution: New hydraulic valves installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 April 2022
Resolved
Machinery and equipment installed must be suitable for the vessel and its operation for the purpose intended. Generator has ongoing oil leak. Make repairs to generator to secure oil leak.
46 CFR 182.100
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 May 2022
Resolved 20 April 2022
Resolution: New seal installed on generator.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Other (MARPOL Annex IV)
Issued 6 April 2022
Resolved
When operating on a body of water where the discharge of untreated sewage is prohibited (3 miles within land) the operator must secure the device by closing and removing the valve handle, or padlocking each valve in a closed position, or using non-releasable wire tie to hold each valve closed. Sewage valves open and not secured. Close and secure valves.
33 CFR 159.7
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 May 2022
Resolved 12 April 2022
Resolution: Sewage locked.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 April 2022
Resolved
The discharge ends of fuel tank vent pipes must terminate on the hull exterior as high above the waterline as possible or the must terminate in U-bends as high above the weather deck as possible. Fuel tank vent vents into compartment on vessel. Provide proper ventilation for fuel tanks.
46 CFR 182.450(d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 May 2022
Resolved 28 April 2022
Resolution: Goosenecks installed on deck.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 16 September 2021
Resolved
The vessel's jib sail is inoperable. The luff tape is stuck in the track. The vessel may not operate under sail with the jib until it is repaired, inspected, and approved by a CG Marine Inspector prior to conducting jib sail operations.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 4 October 2021
Resolution: Jib sail inspected, installed, and tested. PMP updated to show repair.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 July 2021
Resolved
An EAP training program must be conducted for the employer's crewmembers and supervisory personnel. The training program must include at least the following elements: the effects and consequences of drug and alcohol use on personal health, safety, and work environment; the manifestations and behavioral cues that may indicate drug and alcohol use and abuse; and documentation of training given to crewmembers and Supervisory personnel must receive at least 60 minutes of training. Provide proof of completed EAP training for all personnel.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 August 2021
Resolved 12 August 2021
Resolution: Provided proof or required EAP Training.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 July 2021
Resolved
Chemical testing of personnel must be conducted as required by this subpart and in accordance with the procedures detailed in 49 CFR part 40. Provide/Update Company Drug Policy to reflect current changes to DAPI program (i.e., Provide DER information, EAP Information, Hot-line, etc.).
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 August 2021
Resolved 15 July 2021
Resolution: DER provided updated Company Drug Policy to reflect changes to program and include necessary information.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 July 2021
Resolved
The selection of crewmembers for random drug testing shall be made by a scientifically valid method, such as a random number table or a computer based random number generator that is matched with crewmembers' SSN, payroll identification numbers, or other comparable identifying numbers. Random testing must be 50% spread equally throughout the year.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 July 2021
Resolved 28 July 2021
Resolution: DER provided required resolution for company random drug testing program.
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 18 May 2021
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 June 2021
Resolved 6 July 2021
Resolution: Medical endorsement provided.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 18 May 2021
Resolved
Port side navigation light not operational. Provide operational navigation light.
Prior to night time ops.
Action required: 705 - Other - as specified
Resolved 1 June 2021
Resolution: Nav lights provided.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 18 May 2021
Resolved
During fire pump operations smell of burning belt came from pump. Make adjustments to ensure fire pump is operating as designed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 June 2021
Resolved 20 May 2021
Resolution: Belt tension made.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 18 May 2021
Resolved
Remove chafing dish fuel. No open flame or flammable materials allowed on vessel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 June 2021
Resolved 20 May 2021
Resolution: Chafing dishs removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 May 2021
Resolved
Starboard side engine room has non operational salt water pump. Remove pump and associated wiring.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 June 2021
Resolved 20 May 2021
Resolution: Pump and wiring removed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 18 May 2021
Resolved
Port rudder room hatch has broken exterior handles. Provide hatch with handles.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 June 2021
Resolved 20 May 2021
Resolution: New hatch handles installed.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 28 May 2019
Resolved
Stbd inner stay cabin sheathing exhibits signs of water intrusion. Prove fitness of stay in accordance 46 CFR 176.816 Vessel restricted from raising sails.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 May 2019
Resolved 7 June 2019
Resolution: Stbd inner shroud repaired.
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 28 May 2019
Resolved
Radar did not provide picture. Repair/renew in accordance with 46 CFR 184.404. Vessel restricted to 49 max passengers.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 June 2019
Resolved 5 June 2019
Resolution: Radar repaired.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 28 May 2019
Resolved
Life jacket retro was unsatisfactory in accordance with 46 CFR 176.808. Repair/renew in accordance with 46 CFR 185.604(h).
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 June 2019
Resolved 24 June 2019
Resolution: New retro tape was provided.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 28 May 2019
Resolved
Life buoys were unsatisfactory in accordance with 46 CFR 176.808. Renew in accordance with 46 CFR 180.70.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 June 2019
Resolved 5 June 2019
Resolution: Ring Buoys renewed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 5 October 2018
Resolved
Vessel's aft railing running approximately 20 feet beam to beam was damaged / missing. Renew railing to original approved design. Until corrected; no passengers may be allowed aft of the pilot station.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 November 2018
Resolved 26 October 2018
Resolution: Aft railing installed.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 5 October 2018
Resolved
The vessel's life float painter was not secured to the vessel. Remount and secure life float painter and weak link. Until corrected; vessel rout is restricted to less then 3nm from shore.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2018
Resolved 26 October 2018
Resolution: Painter and weak link installed correctly.
Sail Rigging › Sails › Correct Sail Area of Record
Issued 7 September 2017
Resolved
Provide Mainsail dimensions/documentation to attending marine inspector for verification with sail plan. Sail cannot be utilized until approval from attending marine inspector.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 September 2017
Resolution: Main sail dimensions provided to the satisfaction of the attending Marine Inspector
Engineering › Non-conventional Propulsion/Steering › Rudder (cycloidal)
Issued 7 September 2017
Resolved
Replace/repair welds at flanges on port and starobard rudders. The repairs/replacement will be to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 September 2017
Resolved 11 September 2017
Resolution: Repairs affected to the satisfaction of the attending Marine Inspector.
Electrical › Electric Generation Source (service) › Generator
Issued 7 September 2017
Resolved
Provide attending marine inspector with replacement generator specifications.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 September 2017
Resolution: Verified that the generator was replaced in kind.
Engineering › Steering Gear System › Rudder
Issued 12 March 2016
Resolved
Renew stbd rudder.
Due 12 March 2016
Resolved 14 March 2016
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 12 March 2016
Resolved
Condition: Damaged By Earlier Event
Due 12 March 2016
Resolved 12 March 2016
Resolution: Crew replaced prop.
Construction/Loadline › Hull › Hull Plating
Issued 10 March 2016
Resolved
Vessel is to repair STBD hull damage do to grounding.
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 March 2016
Resolved 15 March 2016
Resolution: Vessel conducted repairs in Oahu.
Engineering › Steering Gear System › Rudder
Issued 10 March 2016
Resolved
Vessel is to replace STBD rudder due to grounding damage.
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 March 2016
Resolved 15 March 2016
Resolution: Vessel replaced rudder with new one in Oahu.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 10 March 2016
Resolved
Vessel is to replace STBD prop due to grounding.
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 March 2016
Resolved 15 March 2016
Resolution: Vessel replaced propeller in water Maui.