Records from 2007 to 2020. Most recent: inspection, 2 February 2020.
Inspection history · 13
2 February 2020
Ballast Water Examination · COC-CHEM & TVE Renew · PSC B
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6897450
9 February 2017
Ballast Water Examination · ISPS II Exam · COC-CHEM & TVE Renew
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6082341
30 August 2015
ISPS II Exam · COC-CHEM Renew · Ballast Water Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5226801
12 June 2012
Ballast Water Examination · COC-CHEM Renew · ISPS II Exam · PII Safety Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4344655
18 December 2009
COC-CHEM Annual · PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3646006
13 February 2009
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3415372
29 November 2008
ISPS III Exam · MARPOL Annex I Examination · MARPOL Annex II Examination · MARPOL Annex V Examination · Ballast Water Examination · COC-CHEM Renew
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3370903
31 July 2008
PI Safety Exam · Ballast Water Examination · ISPS III Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3284784
30 July 2008
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3283801
30 July 2008
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3284315
30 July 2008
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3284493
29 November 2007
COC-CHEM Annual · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3103049
29 November 2007
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3106334
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 9 February 2017
Resolved
Code: 1899 Cite: 04SOLAS(74CONS) II-2/4.5.5.1.2 FSS Code Ch.15/2.2.1.3 Action: 60ac Inert gas systems shall be capable of delivering inert gas with an oxygen content of not more than 5% by volume in the inert gas supply main to the cargo tanks at any required rate of flow. The inert gas system suffered multiple flame failures during the ignition process.
Action required: 705 - Other - as specified
Resolved 11 February 2017
Resolution: Received class report from attending DNV/GL surveyor attesting to the replacement of the IGG fuel pump and proper operation of the vessels IGG system. See attached report.
Fire Fighting › Fixed Deck Foam System › Valves
Issued 9 February 2017
Resolved
Code: 0725 04SOLAS(74CONS) II-2/4.5.5.1.2 FSS Code Ch.14/2.1.2 Action: 60ac The deck foam system shall be capable of simple and rapid operation. The crew was unable to energize the fixed deck foam system within an acceptable time frame.
Action required: 705 - Other - as specified
Resolved 11 February 2017
Resolution: Received report from DNV/GL surveyor attesting to the replacement of the isolation valve to the deck foam line and witnessed the operation of the deck foam monitors. See attached report.
Deck/Cargo › Cargo Heating › General
Issued 9 February 2017
Resolved
Code: 0999 Cite: 74SOLAS(09Cons) 1/11(a) Action: 40ac The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulation to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Leaks were discovered in the main deck steam line.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 11 February 2017
Resolution: Received report from DNV/GL surveyor attesting to the proper replacement of the section of pipe leaking. See attachment.
Pollution Prevention/Response › Prevention Equipment › Incinerator, Shipboard
Issued 9 February 2017
Resolved
Code: 0999 Cite: 74SOLAS(09Cons) II-2/4.1.1 Action: 10c Means shall be provided to control leaks of flammable liquids. Inspectors discovered a non-sealing incinerator door that allowed flammable liquids to escape the system.
Action required: 705 - Other - as specified
Resolved 10 February 2017
Resolution: Crew replaced ash door seal on the incinerator and was found to be in operable condition.