SEAWAYS LUZON is a 2006 tank ship. The Coast Guard has recorded 26 inspections since 2016, most recently in June 2025, along with 14 deficiencies and 3 operational controls.
Records from 2016 to 2025. Most recent: inspection, 27 June 2025.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it74909 - Dead Weight, Metric Ton 88871 - Displacement, Metric Ton 42403 - Convention (Subpart B), Gross Ton 21777 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 2016 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Inspection history · 26
27 June 2025COC-TVE Renew · Ballast Water Examination · PSC B
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 25 December 2022Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO ENSURE IT REMAINS FIT FOR SEA. WHILE TRANSITING OUTBOUND, VESSEL EXPERIENCED A LOSS OF PROPULSION. MAKE REPAIRS AND PROVIDE A CLASS REPORT ADDRESSING THE CAUSATIVE FACTORS AND CORRECTIVE MEASURES.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 25 December 2022
Resolved 26 December 2022
Resolution: Recieved class report attesting to cause and corrective action related to start air valve. Cleared Form B. Class report attached.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 February 2022Resolved
The Machinery, boiler, and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board. PSCO received report of overheating #6 cylinder and small leak in air start for #6 cylinder.
74 SOLAS (04)II-1/26.1
Action required: 60 - Rectify deficiencies prior to movement
Resolved 5 February 2022
Resolution: Vessel sent satisfactory Class report attesting to the deficiency being rectified.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 October 2021Resolved
74 SOLAS (14) II-1/31.1
Main and auxiliary machinery essential for the propulsion and
safety of the ship shall be provided with the effective means
for its operation. Vessel starting air valve began to leak and smoke upon getting underway.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 October 2021
Resolution: Received class report attesting to satisfactory repair.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 10 March 2020Resolved
No Electrical equipement shall be installed in any space where flammable mixtures are able to collect. PSCE observed 04 cargo pump room explosion proof light fixtures with cracks in protective coverings. PSCE also observed crew on deck had non intrinsically safe radios(mis-matching batteries with radios). 74SOLAS(04) II-1/45.10 60a/c
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 11 March 2020
Resolved 12 March 2020
Resolution: Recieved class report, all intrinsically safe lighting cover were replaced and radio/batteries are complatiable for Hazardous areas.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 10 March 2020Resolved
Tankers of 20,000 tonnes or above 1 July 2002 but before 1 January 2016, the operation of cargo tanks shall be achieved by a fixed inert gas system in accordance with requirements of the fire safety systems code. PSCE obeserved the sensor for IG high temperature alarm did match the high temperature alarm test equipment. 74SOLAS(14) II-2/4.5.5.1.1 60a/c
Condition: Design Flaw
Action required: 60 - Rectify deficiencies prior to movement
Due 12 March 2020
Resolved 12 March 2020
Resolution: Vessel has ordered a temperature calibrator. Vessel is having local company do a temperature calibration on IG System.
Lifesaving › Lifeboat › Hull
Issued 15 March 2017Resolved
0610; Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. The STBD lifeboat has a 2 inch crack in the upper shell that goes through the hull, threatening the seaworthiness of the lifeboat. 74 SOLAS(14) III/20.2 (17ac)
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 March 2017
Resolution: The recognized ABS specialist has carried out repair in accordance with OEM repair plan in anchorage.
Deck/Cargo › Inert Gas System › IGS Scrubber
Issued 15 March 2017Resolved
2550; The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. After any survey of the ship has been completed, no changes shall be made to the structural arrangements, machinery .... See narrative
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 March 2017
Resolution: The crew carried out a temporary repair by wrapping a metallic epoxy in anchorage and was subsequently operationally tested with satisfactory results. Permanent repair of this section of the pipe will be effected within 30 days.
Engineering › Pressure Vessel › Piping
Issued 15 March 2017Resolved
2550; The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. After any survey of the ship has been completed, no change shall be made in structural arrangements, machinery.. .Continued in Narrative
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 March 2017
Resolution: All temporary patches tested satisfactory to class and will be permanently repaired within 30 days.
2550; The machinery and associated piping systems and fittings shall be adequate for the service for which they are intended. The oily water separator has three patches on the #2 supply line going to the polishing pack. 74 SOLAS (14) II-1/26 (17ac)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 March 2017
Resolution: The crew has carried out another weld pass on this leaking section and it was confirmed that the effectiveness of repair is satisfactory. Permanent repair to be carried out within 30 days.
Construction/Loadline › Structures › Deck Plating
Issued 15 March 2017Resolved
0999; Every tanker shall be provided with means to enable crew to gain safe access to the bow. PSCO observed cargo deck grating used for escape or access to firefighting equipment was made of composite material. Vessel did not provide proof that material meets the integrity standards for its service. 74 SOLAS (14) I-1/3.3.2 (17ac)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 March 2017
Resolution: Determination has been made by ~B~ ~ulatory affairs and has been accepted by the flag
administration that these gratings is suitable for intended purpose.
Lifesaving › Lifeboat › Hull
Issued 15 March 2017Resolved
0610; Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. PORT lifeboat/rescue boat is not ready for immediate use. Single point release handle was not connected. AFT gripe post mounting plate one 2 inch crack and another 3 inch crack in fiberglass. 74 SOLAS (14) III/20.2 (17ac)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 March 2017
Resolution: The recognized specialist has removed by grinding out the surface part of fiberglass to get rid of the fracture and have applied a new fiberglass on the affected area.
Personnel › Training › First Aid/CPR
Issued 15 March 2017Resolved
0371; Each enclosed space entry and rescue drill shall include checking and use of rescue equipment and procedures. Enclosed space stretcher grommets are wasted and not appropriate size of all crew members. The stretcher in pump room in current condition could cause physical injury. 74 SOLAS (14) III/19.3.6.2.4 (17ac)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 March 2017
Resolution: The stretcher inside the pump room was verified to be replaced with new spare on board. The old one was discarded.
Operations/Management › Ballast Water Managment › Sediments
Issued 15 March 2017Resolved
2510: vessel must maintain a ballast water management plan that has been developed specifically for the vessel that will allow those responsible for the plan to understand and follow it. Vessel currently is not documenting items in the ballast water managment plan including bio-fouling as required by 33cfr151.2050(g) and IMO RES. 207(62). 10C
Action required: 705 - Other - as specified
Resolved 15 March 2017
Resolution: Discussed proper Ballast water and biofouling procedures with ships crew. Deficiency has been rectified.
Personnel › Training › Familiarization Training
Issued 15 March 2017Resolved
The training manual shall contain instructions and information on the life saving appliances provided in the ship. The shipboard training manual is not ships specific. 74SOLAS(14)III?35.3 10C
Action required: 705 - Other - as specified
Resolved 15 March 2017
Resolution: Ship now has up to date solas training manuals. Deficiency Rectfied
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.