SEACOR CABRAL is a 2008 offshore supply vessel. The Coast Guard has recorded 10 inspections since 2008, most recently in August 2016, along with 28 deficiencies — 1 with no resolution recorded —.

Records from 2008 to 2016. Most recent: inspection, 5 August 2016.

Built
2008
Last inspected
5 August 2016
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9498676 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
867013
Flag
MARSHALL ISLANDS
366321000 (licence lapsed)
Maury page id
psix-867013

Inspections, by type

Years with a record 5 calendar years (2008–2016)
The 10 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 10 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records it333 - Convention (Subpart B), Net Ton
67 - Regulatory (Subpart C or D), Net Ton
1111 - Convention (Subpart B), Gross Ton
983 - Dead Weight, Gross Ton
98 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WDE2921MMSI 366321000 · cancelled · compulsorily equipped · granted 15 January 2008, cancelled 30 April 2014
WDE2874MMSI 366321000 · cancelled · compulsorily equipped · granted 11 January 2008, cancelled 11 January 2008
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 10

5 August 2016 PII Safety Exam · ISPS II Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5967286
7 May 2014 COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4852454
16 May 2012 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4301350
4 March 2010 MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3705416
23 July 2008 Annual Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3276831
1 May 2008 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3196680
4 April 2008 Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3461901
3 March 2008 Welding Related Inspections Qualification Testing · DAPI Audit · Initial Construction-Excluding Oversight · Construction Oversight · Internal Structural Exam · MTSA/ISPS Verification · Drydock Exam · Ballast Water Examination · Hull Examination · Initial Certification · Cargo Tank Internal · MARPOL Annex I Examination · Plan Review (Other than "T")
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3157624
21 February 2008 Plan Review (Other than "T")
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3151034
9 January 2008 Plan Review (Other than "T")
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 3127715

Deficiency record · 28

Documentation › Manuals/Policy Documentation › Training Manual (lifesaving)
Issued 5 August 2016 No resolution recorded
VSL was missing SOLAS training manuals, VSL showed electronic version but was not in the working language of the crew.
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Electrical › Electric Generation Source (emergency) › Switch
Issued 5 August 2016 Resolved
Emergency generator does not transfer power upon loss of main power
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 August 2016
Resolution: Repaired to the satisfaction of class.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Approval
Issued 16 May 2012 Resolved
Replace all extinguishers with USCG approved fire extinguishers.
Due 15 March 2013
Resolved 23 October 2012
Resolution: All portable fire extinguishers are labeled properly as Coast Guard approved.
Lifesaving › Hand Flares › Approval
Issued 16 May 2012 Resolved
Replace all flares with USCG approved flares.
Due 15 March 2013
Resolved 23 October 2012
Resolution: Flares found onboard are Coast Guard/SOLAS approved.
Stability › Watertight Integrity › General
Issued 16 May 2012 Resolved
Adjust all watertight doors below main deck.
Due 16 June 2012
Resolved 22 May 2012
Engineering › Fuel Oil Service System › Hose
Issued 16 May 2012 Resolved
replace dry-rotted fuel hoses on starboard and port main engines.
Due 16 June 2012
Resolved 22 May 2012
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 May 2012 Resolved
Remove wire on top of port side pilothouse.
Due 16 June 2012
Resolved 22 May 2012
Documentation › Logs/Records › Logbook (official)
Issued 16 May 2012 Resolved
Provide documentation that fire and abandonship drills are held alternating weeks.
Due 16 June 2012
Resolved 14 June 2012
Fire Fighting › Semiportable Chemical-Foam Fire Extinguishers › Service
Issued 4 March 2010 Resolved
Conduct annual service or remove B-V semi-portable extinguisher in engineroom alleyway. Extinguisher is not required to be onboard as per 46 CFR 132.220.
Action required: 705 - Other - as specified
Due 4 April 2010
Resolved 25 March 2010
Resolution: Received service report from Emares - Ayromar, which is an ABS approved servicing facility.
Communications › Alarms/Indicators › Lube Oil Low Pressure Alarm
Issued 4 March 2010 Resolved
Have lube-oil shutdowns, jacketwater high temp alarms, and overspeed shutdowns tested by a thrid pary on the main diesel engines, ship services generators and emergency generator.
Action required: 705 - Other - as specified
Due 4 April 2010
Resolved 26 March 2010
Resolution: Received thrid party report form Diesel Line Cambui all alarms and shutdowns were tested satisfactory.
Engineering › Fuel Oil Service System › Hose
Issued 4 March 2010 Resolved
Replace fuel oil return hose on the starboard main diesel engine.
Action required: 705 - Other - as specified
Due 4 April 2010
Resolved 26 March 2010
Resolution: received report form third party that the hose was replaced by Diesel Line Cambui.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 4 March 2010 Resolved
The hydrostatic release for the EPIRB has expired replace expired hydrostatic release.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 March 2010
Resolution: Received pictures on new hydrostatic release installed on the vessel as well as proof of purchase
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008 Resolved
Provide Coast Guard approved terminal block configuration drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008 Resolved
Provide Coast Guard approved steering control cabling diagram drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008 Resolved
Provide Coast Guard approved Emergency station junction box electrical drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008 Resolved
Provide Coast Guard approved steering pump fail control panel electric drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008 Resolved
Provide Coast Guard approved steering forward mode control panel electric drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 March 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008 Resolved
Provide Coast Guard approved steering aft mode control panel electric drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008 Resolved
Provide Coast Guard approved wheelhouse junction box electric drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008 Resolved
Provide Coast Guard approved wiring diagram drawing (14 sheets) and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008 Resolved
Provide Coast Guard approved compressed air system drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008 Resolved
Provide Coast Guard approved fuel oil system drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 21 March 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008 Resolved
Provide Coast Guard approved liquid mud w/conversion to fuel oil drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 21 March 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008 Resolved
Provide Coast Guard approved sanitary drains system drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008 Resolved
Provide Coast Guard approved dirty oil, lube oil, and oily water system drawing and satisfy all comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 21 March 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008 Resolved
Provide Coast Guard approved steering system drawing and satisfy all comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 3 March 2008 Resolved
Provide Non-Tank Vessel Response Plan submittal documentation as required by NVIC 01-05 Ch 1.
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Navigation › Emergency Steering › Compass Reading for Emergency Steering
Issued 3 March 2008 Resolved
Provide gyro compass heading repeater, or other means, to supply heading Information visually at the emergency steering position in the machinery space as required by 74 SOLAS as amended Chapter V, Regulation 19.2.5.2
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 31 March 2008
Resolution: Repeater installed at the emergency steering position in the machinery space.