Records from 2008 to 2016. Most recent: inspection, 5 August 2016.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Documentation › Manuals/Policy Documentation › Training Manual (lifesaving)
Issued 5 August 2016
No resolution recorded
VSL was missing SOLAS training manuals, VSL showed electronic version but was not in the working language of the crew.
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Electrical › Electric Generation Source (emergency) › Switch
Issued 5 August 2016
Resolved
Emergency generator does not transfer power upon loss of main power
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 August 2016
Resolution: Repaired to the satisfaction of class.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Approval
Issued 16 May 2012
Resolved
Replace all extinguishers with USCG approved fire extinguishers.
Due 15 March 2013
Resolved 23 October 2012
Resolution: All portable fire extinguishers are labeled properly as Coast Guard approved.
Lifesaving › Hand Flares › Approval
Issued 16 May 2012
Resolved
Replace all flares with USCG approved flares.
Due 15 March 2013
Resolved 23 October 2012
Resolution: Flares found onboard are Coast Guard/SOLAS approved.
Stability › Watertight Integrity › General
Issued 16 May 2012
Resolved
Adjust all watertight doors below main deck.
Due 16 June 2012
Resolved 22 May 2012
Engineering › Fuel Oil Service System › Hose
Issued 16 May 2012
Resolved
replace dry-rotted fuel hoses on starboard and port main engines.
Due 16 June 2012
Resolved 22 May 2012
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 May 2012
Resolved
Remove wire on top of port side pilothouse.
Due 16 June 2012
Resolved 22 May 2012
Documentation › Logs/Records › Logbook (official)
Issued 16 May 2012
Resolved
Provide documentation that fire and abandonship drills are held alternating weeks.
Due 16 June 2012
Resolved 14 June 2012
Fire Fighting › Semiportable Chemical-Foam Fire Extinguishers › Service
Issued 4 March 2010
Resolved
Conduct annual service or remove B-V semi-portable extinguisher in engineroom alleyway. Extinguisher is not required to be onboard as per 46 CFR 132.220.
Action required: 705 - Other - as specified
Due 4 April 2010
Resolved 25 March 2010
Resolution: Received service report from Emares - Ayromar, which is an ABS approved servicing facility.
Communications › Alarms/Indicators › Lube Oil Low Pressure Alarm
Issued 4 March 2010
Resolved
Have lube-oil shutdowns, jacketwater high temp alarms, and overspeed shutdowns tested by a thrid pary on the main diesel engines, ship services generators and emergency generator.
Action required: 705 - Other - as specified
Due 4 April 2010
Resolved 26 March 2010
Resolution: Received thrid party report form Diesel Line Cambui all alarms and shutdowns were tested satisfactory.
Engineering › Fuel Oil Service System › Hose
Issued 4 March 2010
Resolved
Replace fuel oil return hose on the starboard main diesel engine.
Action required: 705 - Other - as specified
Due 4 April 2010
Resolved 26 March 2010
Resolution: received report form third party that the hose was replaced by Diesel Line Cambui.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 4 March 2010
Resolved
The hydrostatic release for the EPIRB has expired replace expired hydrostatic release.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 March 2010
Resolution: Received pictures on new hydrostatic release installed on the vessel as well as proof of purchase
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008
Resolved
Provide Coast Guard approved terminal block configuration drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008
Resolved
Provide Coast Guard approved steering control cabling diagram drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008
Resolved
Provide Coast Guard approved Emergency station junction box electrical drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008
Resolved
Provide Coast Guard approved steering pump fail control panel electric drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008
Resolved
Provide Coast Guard approved steering forward mode control panel electric drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 March 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008
Resolved
Provide Coast Guard approved steering aft mode control panel electric drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008
Resolved
Provide Coast Guard approved wheelhouse junction box electric drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008
Resolved
Provide Coast Guard approved wiring diagram drawing (14 sheets) and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008
Resolved
Provide Coast Guard approved compressed air system drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008
Resolved
Provide Coast Guard approved fuel oil system drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 21 March 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008
Resolved
Provide Coast Guard approved liquid mud w/conversion to fuel oil drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 21 March 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008
Resolved
Provide Coast Guard approved sanitary drains system drawing and satisfy all corresponding comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008
Resolved
Provide Coast Guard approved dirty oil, lube oil, and oily water system drawing and satisfy all comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 21 March 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 3 March 2008
Resolved
Provide Coast Guard approved steering system drawing and satisfy all comments to the satisfaction of the [name withheld] as required by 46CFR 127.110(e)
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 3 March 2008
Resolved
Provide Non-Tank Vessel Response Plan submittal documentation as required by NVIC 01-05 Ch 1.
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 4 April 2008
Navigation › Emergency Steering › Compass Reading for Emergency Steering
Issued 3 March 2008
Resolved
Provide gyro compass heading repeater, or other means, to supply heading Information visually at the emergency steering position in the machinery space as required by 74 SOLAS as amended Chapter V, Regulation 19.2.5.2
Action required: 705 - Other - as specified
Due 21 April 2008
Resolved 31 March 2008
Resolution: Repeater installed at the emergency steering position in the machinery space.