Registered dimensions (L × B × D)130.0 ft × 40.0 ft × 11.0 ft
Registered tonnagegross 480 / net 480
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJAMES MARINE INC · PADUCAH, KY, UNITED STATES · built 2008
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 30 April 2026 · expires 30 April 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it480 - Simplified, Gross Ton 480 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 9 June 2025Resolved
Each cable entrance into explosion proof or flameproof equipment must be made with approved seal fittings, termination fittings, or glands that meet the requirements of 46 CFR 111.105-9. Vessel has multiple cables powering explosion or flameproof equipment seal fittings that failed. Re-seal cable fittings in compliance with 111.105-3.
Action required: 705 - Other - as specified
Resolved 12 June 2025
Resolution: repaired cable gland
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 9 June 2025Resolved
Each item of electrical equipment required by this subpart to be explosion proof must be explosion proof under UL 1203. Explosion proof breaker panel was not sealed closed. The majority of the bolts used to seal the breaker panel were not threaded from the breaker panel.
Action required: 705 - Other - as specified
Resolved 12 June 2025
Resolution: breaker panel was sealed closed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 9 June 2025Resolved
Non metallic flexible hose must be in accordance with SAE J1942. Several hoses on prime mover were severely worn with inside jacket exposed. Replace hoses with hoses approved under SAE J1942 and hose fittings approved under SAE J1475.
Action required: 705 - Other - as specified
Resolved 12 June 2025
Resolution: Replaced hoses
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 9 June 2025Resolved
The inspection shall be such as to insure that the vessels machinery is in satisfactory condition and fit for the service for which it is intended. Prime mover has a fuel leak at fuel priming pump. Fix fuel leak.
Action required: 705 - Other - as specified
Resolved 12 June 2025
Resolution: replaced priming pump
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 9 June 2025Resolved
Under each loading manifold and each transfer connection point, a fixed container or enclosed deck area that, in all conditions of ship list or trim encountered during the loading operation must have the required capacity.
The containments under the manifolds are filled with cargo. Remove cargo from the containments.
Action required: 705 - Other - as specified
Resolved 12 June 2025
Resolution: removed cargo from containment
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 9 June 2025Resolved
Cargo pump relief valves shall be tested at least once each year to determine that they function satisfactorily at the pressure at which they are set to open. Test cargo pump relief valve.
Action required: 705 - Other - as specified
Resolved 12 June 2025
Resolution: Had relief valve test by third party entity
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 9 June 2025Resolved
Each cargo tank of a tank barge must have a high-level indicating device. In accordance with 46 CFR 39.2003(b). Several high-level indicating devices do not rise to 1 meter and are not visible from all cargo control areas.
Fix or replace the high-level indicating devices (one meter sticks).
Action required: 705 - Other - as specified
Resolved 12 June 2025
Resolution: replaced faulty indicators
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 21 April 2023Resolved
Cargo pumps must be provided with a pressure gauge on the discharge side of the pump. Waste oil cargo pump is not equipped with a pressure gauge.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2023
Resolved 11 May 2023
Resolution: Installed gauge.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 12 July 2019Resolved
Fuel lines on generator had significant wear. Lines should be replaced as per SAE Standard J-1942.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 August 2019
Resolved 17 July 2019
Resolution: Fuel lines were replaced to the satifcation of the CG.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 24 April 2012Resolved
Provide a report from an electrician verifying the electrical system integrity to include addressing possible water intrusion into the electrical panel. Currently there is corrsion in the breaker panel, on the main ground wire for the panel and rust on several of the screws holding the breakers, indicating possible water intrusion. All electrical systems appear to be working properly.
Condition: Improper/Lack of Maintenance
Due 24 May 2012
Resolved 8 May 2012
Construction/Loadline › Hull › Side Shell
Issued 24 April 2012Resolved
Affect permanent repairs in accordance with an OCMI approved repair proposal to the starboard side shell to include repair of the one inch diameter fracture 9 inches from the deck edge located 65 foot from the bow. Additional insopection with in the voids is required to determine the extent of frame or bracket damage. The is a 25 by 2 foot area with multiple insets up to 4 inches in depth.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 8 May 2012
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National