MAURY USCG vessel records
← All vessels

GS 1107

GS 1107 is a 2008 tank barge. The Coast Guard has recorded 19 inspections since 2006, most recently in July 2026, along with 11 deficiencies.

Records from 2006 to 2026. Most recent: inspection, 16 July 2026.

Built
2008
Last inspected
16 July 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspection record

Last inspected 16 July 2026
Operational controls None recorded without a removal date
Years with a record 18 calendar years (2006–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

868315
Flag
UNITED STATES
Maury page id
psix-868315

Documentation record

Registered dimensions (L × B × D)130.0 ft × 40.0 ft × 11.0 ft
Registered tonnagegross 480 / net 480
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJAMES MARINE INC · PADUCAH, KY, UNITED STATES · built 2008
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 30 April 2026 · expires 30 April 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it480 - Simplified, Gross Ton
480 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 19

16 July 2026 Annual Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 8439840
3 June 2025 Annual Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 8151215
9 April 2024 Periodic Inspection · Administrative Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7892279
21 April 2023 Annual Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7672864
20 April 2022 COI Inspection · MTSA Verification · Administrative Inspection · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7434637
8 July 2021 MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7249323
21 May 2020 Periodic Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6963404
12 July 2019 Annual Inspection · Administrative Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6766219
29 June 2018 MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6459606
6 April 2017 Cargo Tank Internal · Drydock Exam · Internal Structural Exam · MTSA Verification · Examination of Repairs · Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 6119727
1 August 2016 Annual Inspection · Administrative Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 5962470
26 July 2015 Annual Inspection · Administrative Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 5962478
29 July 2014 Annual Inspection · Administrative Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 5008568
8 May 2012 Internal Structural Exam · Damage Survey · COI Inspection · Examination of Repairs · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 4305584
24 April 2012 Annual Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4294435
9 June 2011 Annual Inspection · MTSA Verification
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4040596
13 May 2010 MTSA Verification · Periodic Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 3749823
24 June 2009 Annual Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 3512964
1 November 2006 Cargo Tank Internal · Initial Construction-Excluding Oversight · Welding Related Inspections Qualification Testing · Deadweight Survey · Initial Certification · Administrative Inspection · Hull Examination
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 3070540

Deficiency record · 11

09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 9 June 2025 Resolved
Each cable entrance into explosion proof or flameproof equipment must be made with approved seal fittings, termination fittings, or glands that meet the requirements of 46 CFR 111.105-9. Vessel has multiple cables powering explosion or flameproof equipment seal fittings that failed. Re-seal cable fittings in compliance with 111.105-3.
Action required: 705 - Other - as specified
Resolved 12 June 2025
Resolution: repaired cable gland
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 9 June 2025 Resolved
Each item of electrical equipment required by this subpart to be explosion proof must be explosion proof under UL 1203. Explosion proof breaker panel was not sealed closed. The majority of the bolts used to seal the breaker panel were not threaded from the breaker panel.
Action required: 705 - Other - as specified
Resolved 12 June 2025
Resolution: breaker panel was sealed closed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 9 June 2025 Resolved
Non metallic flexible hose must be in accordance with SAE J1942. Several hoses on prime mover were severely worn with inside jacket exposed. Replace hoses with hoses approved under SAE J1942 and hose fittings approved under SAE J1475.
Action required: 705 - Other - as specified
Resolved 12 June 2025
Resolution: Replaced hoses
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 9 June 2025 Resolved
The inspection shall be such as to insure that the vessels machinery is in satisfactory condition and fit for the service for which it is intended. Prime mover has a fuel leak at fuel priming pump. Fix fuel leak.
Action required: 705 - Other - as specified
Resolved 12 June 2025
Resolution: replaced priming pump
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 9 June 2025 Resolved
Under each loading manifold and each transfer connection point, a fixed container or enclosed deck area that, in all conditions of ship list or trim encountered during the loading operation must have the required capacity. The containments under the manifolds are filled with cargo. Remove cargo from the containments.
Action required: 705 - Other - as specified
Resolved 12 June 2025
Resolution: removed cargo from containment
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 9 June 2025 Resolved
Cargo pump relief valves shall be tested at least once each year to determine that they function satisfactorily at the pressure at which they are set to open. Test cargo pump relief valve.
Action required: 705 - Other - as specified
Resolved 12 June 2025
Resolution: Had relief valve test by third party entity
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 9 June 2025 Resolved
Each cargo tank of a tank barge must have a high-level indicating device. In accordance with 46 CFR 39.2003(b). Several high-level indicating devices do not rise to 1 meter and are not visible from all cargo control areas. Fix or replace the high-level indicating devices (one meter sticks).
Action required: 705 - Other - as specified
Resolved 12 June 2025
Resolution: replaced faulty indicators
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 21 April 2023 Resolved
Cargo pumps must be provided with a pressure gauge on the discharge side of the pump. Waste oil cargo pump is not equipped with a pressure gauge.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2023
Resolved 11 May 2023
Resolution: Installed gauge.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 12 July 2019 Resolved
Fuel lines on generator had significant wear. Lines should be replaced as per SAE Standard J-1942.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 August 2019
Resolved 17 July 2019
Resolution: Fuel lines were replaced to the satifcation of the CG.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 24 April 2012 Resolved
Provide a report from an electrician verifying the electrical system integrity to include addressing possible water intrusion into the electrical panel. Currently there is corrsion in the breaker panel, on the main ground wire for the panel and rust on several of the screws holding the breakers, indicating possible water intrusion. All electrical systems appear to be working properly.
Condition: Improper/Lack of Maintenance
Due 24 May 2012
Resolved 8 May 2012
Construction/Loadline › Hull › Side Shell
Issued 24 April 2012 Resolved
Affect permanent repairs in accordance with an OCMI approved repair proposal to the starboard side shell to include repair of the one inch diameter fracture 9 inches from the deck edge located 65 foot from the bow. Additional insopection with in the voids is required to determine the extent of frame or bracket damage. The is a 25 by 2 foot area with multiple insets up to 4 inches in depth.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 8 May 2012

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.