MAG 571 is a 2007 tank barge. The Coast Guard has recorded 20 inspections since 2007, most recently in March 2024, along with 14 deficiencies — 1 with no resolution recorded —.
Records from 2007 to 2024. Most recent: inspection, 28 March 2024.
- Built
- 2007
- Last inspected
- 28 March 2024
- Documentation
- Valid · documentation file of 10 August 2026
- Deficiencies
- 14 recorded · 1 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
1195180
870192
Flag
UNITED STATES
Maury page id
psix-870192
Inspections, by type
The 20 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.
Documentation record
Registered dimensions (L × B × D)154.0 ft × 42.0 ft × 10.0 ft
Registered tonnagegross 543 / net 543
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderC & C MARINE AND REPAIR LLC · BELLE CHASSE, LA, UNITED STATES · built 2007
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 15 September 2025 · expires 31 October 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it543 - Simplified, Gross Ton
543 - Simplified, Net Ton
543 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
One vessel history report for this hull — every record on this page in one dated, citable document — $300, on request.
Inspection history · 20
28 March 2024
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7886498
15 March 2023
Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7886904
1 September 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7548940
10 February 2022
COI Inspection · Internal Structural Exam · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7394187
12 June 2017
Cargo Tank Internal · Internal Structural Exam · COI Inspection · MTSA Verification · Drydock Exam · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6169641
28 September 2016
Construction Oversight · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6018384
30 March 2016
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5873844
16 April 2015
Periodic Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5104556
18 August 2014
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4958946
7 April 2014
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4831169
22 January 2014
Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4792227
16 March 2012
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4264950
1 March 2012
Administrative Inspection · Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4254665
15 February 2012
Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4244852
3 March 2010
Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3689409
4 March 2009
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3427827
26 October 2007
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3087765
22 August 2007
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3035709
16 April 2007
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2908983
21 February 2007
Hull Examination · COI Inspection · Construction Oversight · Internal Structural Exam · MTSA Verification · Administrative Inspection · Cargo Tank Internal
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2875249
Deficiency record · 14
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 March 2024
Resolved
No person may operate, install, or reinstall an air compressor in a cargo area described in 46 CFR 32.35-15 of this subchapter.
Marine Inspector observed a wheeled air compressor affixed to the cargo tank top within the cargo area as defined in 46 CFR 32.35-15. Air compressor is to be removed from the cargo area.
46 CFR 35.35-85
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 28 March 2024
Resolved
Each non-metallic transfer hose must: Not burst, bulge leak or abnormally distort under status liquid pressure at least 1 1/2 times the maximum allowable working pressure. The frequency of the tests and inspections required by this section must be: for vessels - annually.
Marine Inspector was provided cargo transfer hose testing certificates that were either expired or hoses were air tested. Complete required static liquid testing on applicable transfer hoses OR prove compliance with either 33 CFR 156.170(h) or (i) for alternative compliance approvals on provided air test certificates.
33 CFR 156.170(c)(1)(iii) / (f)(3)
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 28 March 2024
Resolved
Each loading arm and each transfer pipe system, including metallic hose, must not leak under static liquid pressure at least 1 1/2 times the maximum allowable working pressure; The frequency of the tests and inspections required by this section must be: for vessels - annually.
Marine Inspector was provided cargo transfer piping test certificates that were either expired or piping was air tested. Complete required static liquid testing on applicable transfer piping OR prove compliance with either 33 CFR 156.170(h) or (i) for alternative compliance approvals on provided air test certificates.
33 CFR 156.170(c)(4) / (f)(3)
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 28 March 2024
Resolved
Each hose assembly used for transferring oil or hazardous material must meet the following requirements:
(1)The name of each product for which the hose may be used; or
(2) For oil products, the words “OIL SERVICE”;
In addition:
(1) Maximum allowable working pressure;
(2) Date of manufacture; and
(3) Date of the latest test required by 33 CFR 156.170.
Marine Inspector observed transfer hoses to be improperly marked. Complete hose markings.
33 CFR 155.800 / 33 CFR 154.500
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 28 March 2024
Resolved
A tank vessel with a capacity of 250 or more barrels that is carrying oil or hazardous material as cargo must have; under or around each loading manifold and each transfer connection point, a fixed container or enclosed deck area that, in all conditions of ship list or trim encountered during the loading operation meets the required capacities listed (i-v) based on hose or pipe diameter.
Marine Inspector observed approximately 3-4 inches of accumulated diesel fuel oil within the manifold containment system. Properly drain and maintain to provide the required spill capacity.
33 CFR 155.310(a)(1)
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 28 March 2024
Resolved
The cargo handling equipment shall be maintained by the tank vessel's personnel in accordance with the regulations in this subchapter, including the following: Cargo pump relief valves shall be tested at least once each year to determine that they function satisfactorily at the pressure at which they are set to open.
46 CFR 35.35-70(b)
Marine Inspector observed a 2022 inspection date on the cargo pump relief valve. Provide proof of annual cargo pump relief valve testing.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 28 March 2024
No resolution recorded
Once the plan review and inspection of the tank vessel Vapor Control System (VCS) satisfy the requirements of this part, the Officer in Charge, Marine Inspection (OCMI) will endorse the Certificate of Inspection for the U. S.-flagged tank vessel.
MAG 571 had VCS plans approved by the Marine Safety Center (MSC) on 17 JUL 2007, Approval letter Serial number C2-0702258, with no documented system removals or modifications since 23 MAR 2012.
During 28 MAR 2024 Annual Inspection, Marine Inspectors observed ALL previously approved VCS high level and overfill system components to have been entirely removed from the tank barge on an unknown date.
Vessel's current VCS arrangement does not comply with the requirements of 46 CFR Part 39. Vessel operator to reinstall ALL removed VCS components to comply OR provide a proposal to both the MSC and local OCMI on plans to permanently decommission the on-board VCS. Either option will require MSC and OCMI final approval on any and all system changes.
46 CFR 39.1013(d)
Rectified prior to usage of the Vapor Control System OR once system is officially decommissioned.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 28 March 2024
Resolved
Every tank barge shall have its name or number carved, punch-marked, or welded on the main beam, inside the cargo hatch, or other suitable permanent part of the vessel's structure for the purpose of identification. The vessel's name or number shall be so displayed at the highest part of the vessel's hull or permanent structure that the name or number can be seen from either side.
Marine Inspector observed the barge's name to be worn and not clearly visible on the PORT and STBD sides of the barge due to paint wearing off.
Make the barge name clearly visible.
46 CFR 32.05-15
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 18 February 2022
Resolved
When major alterations or major repairs of tank vessels become necessary the work shall be done under the direction of the Officer in Charge, Marine Inspection, and shall be in accordance with the regulations in effect for new construction insofar as possible. Vessel owners rep stated that the vessel had recently been dry docked and major repairs completed to the side shell to repair damage caused by Hurricane IDA. MI observed numerous areas of side shell crop and renewal. All repairs were done without notifying and without the supervision of the OCMI.
46 CFR 30.01-10
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 18 February 2022
Resolved
If during an internal structural exam, damage or deterioration to structural members is discovered the OCMI may require the vessel to be taken out of service to effect permanent repairs. MI observed damaged structural members in the #3 Port wing void, starboard bow void, and the starboard stern void all in need for crop and renew repairs.
46 CFR 31.10-21(c)
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 30 March 2016
Resolved
Drive shaft guard on Cargo pump engine needed to be extended. Part of shaft exposed.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 26 October 2007
Resolved
Wiring Harness on Prime Mover is not intrinsically safe, explosion proof, or purged and pressurized for a Class I Div I area. Ref D8(dp) Policy Letter 02-2007 CH1. Barge is allowed to operate until Aug 08 per policy ltr.
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 21 February 2007
Resolved
Vapor Recovery System plans have not been approved.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 21 February 2007
Resolved
Certificate of Documentation has not been received.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.