← All vessels
MAG 572
Tank Barge · Barge class · Built 2000s · USCG Heartland District (CGD-H) · Other hulls named MAG 572 · SETTOON TOWING, L.L.C. operator of record, 2023
MAG 572 is a 2007 tank barge. The Coast Guard has recorded 22 inspections since 2007, most recently in July 2026, along with 11 deficiencies and 1 casualty investigation in 2013.
Records from 2007 to 2026. Most recent: inspection, 29 July 2026.
- Built
- 2007
- Last inspected
- 29 July 2026
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 11 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 1 investigation · 2013
Identity
1195182
870194
Flag
UNITED STATES
—
Maury page id
psix-870194
Inspections, by type
…with no type recorded2
Years with a record
14 calendar years (2007–2026)
The 22 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.
Documentation record
Registered dimensions (L × B × D)154.0 ft × 42.0 ft × 10.0 ft
Registered tonnagegross 543 / net 543
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderC & C MARINE AND REPAIR LLC · BELLE CHASSE, LA, UNITED STATES · built 2007
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 16 September 2025 · expires 31 October 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it543 - Simplified, Gross Ton
543 - Simplified, Net Ton
543 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 22
29 July 2026
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8418454
3 November 2025
Deficiency Check · Periodic Inspection · MTSA/ISPS Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8254113
14 May 2025
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8135924
7 April 2025
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8106345
18 October 2024
Annual Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8013692
2 August 2023
Annual Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7744511
11 July 2022
Cargo Tank Internal · MTSA Verification · Drydock Exam · Examination of Repairs · Internal Structural Exam · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7499360
27 June 2017
COI Inspection · Internal Structural Exam · MTSA Verification · Cargo Tank Internal · Drydock Exam · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6187006
7 October 2016
Administrative Inspection · Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6018385
26 July 2016
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5973586
19 June 2015
Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5157706
18 August 2014
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4958941
25 July 2014
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4938072
7 May 2012
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4304583
7 April 2010
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3711504
9 April 2009
Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3451556
6 June 2008
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3228805
14 May 2008
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3207547
24 April 2008
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3226078
26 October 2007
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3087766
22 August 2007
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3035732
16 April 2007
COI Inspection · MTSA Verification · Initial Construction-Excluding Oversight · Cargo Tank Internal · Administrative Inspection · Construction Oversight · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2909012
Deficiency record · 11
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 3 November 2025
Resolved
EACH CARGO TANK OF A TANK BARGE MUST HAVE ONE OF THE FOLLOWING LIQUID OVERFILL PROTECTION ARRANGEMENTS: A SYSTEM MEETING THE REQUIREMENTS OF 46 CFR 39.2007, HIGH LEVEL AND TANK OVERFILL ALARMS. MI WAS UNABLE TO TEST ANY OF THE ALARMS DUE TO A MALFUNCTION OF THE SYSTEM.
46 CFR 39.2009(a)(1)
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 18 October 2024
Resolved
No person may use any equipment listed in paragraph (c) of this section for transfer operations unless the vessel or facility operator, as appropriate, tests and inspects the equipment. The frequency of the tests and inspections required by this section must be: Each vapor hose, vapor collection arm, pressure or vacuum relief valve, and pressure sensor is tested and inspected for vessels annually, or as part of the biennial and mid-period inspections. MI observed no available valid records or indication of cargo system pressure vacuum relief valve testing.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 18 October 2024
Resolved
On a tank barge, each cargo tank must be equipped with an overfill device that meets the requirements of
46 CFR 39.2009 (a)(1). MI unable to witness operational testing of audible and visual alarm indicators of high/overfill alarms.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 18 October 2024
Resolved
Vapor piping systems and pressure vacuum valves that are used for polymerizing cargoes must be inspected internally at least annually. MI unable to safely inspect vapor piping during annual inspection as both end plates were not removed.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 18 October 2024
Resolved
No person may use any equipment listed in paragraph (c) of this section for transfer operations unless the vessel or facility operator, as appropriate, tests and inspects the equipment. The frequency of the tests and inspections required by this section must be: for vessel annually or as part biennial and mid-period inspections. MI observed no documentation for 01 cargo hose testing.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 18 October 2024
Resolved
No extensive alterations involving the safety of a tank vessel either in regard to hull or machinery shall be made without the approval of the Commandant. Before such alterations are carried out, copies of plans and specifications in triplicate for the work involved shall be forwarded to the Officer in Charge, Marine Inspections. Two 5,000 gallon potable water tanks are mounted on wooden blocks on board tank barge, with no documentation of approval from USCG. Vessel to submit plans of modifications to MSC for approval within 7 days and provide proof of submission to Sector New Orleans. Vessel to include all changes to machinery, structure, outfitting, and equipment that affect the lightship parameters referenced in MSC approval modifications letter C1-1604492, dated December 29, 2016. Deficiency considered rectified upon receipt of MSC approval letter. 46 CFR 31.10-25
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 9 August 2022
Resolved
Each vessel vapor connection flange face must have a permanent stud projecting outward....and is at least 1 inch long. it must be located at the top of the flange face, midway between boltholes, and in line with the bolthole pattern. The stud on the vapor line was pushed in, and in the wrong location. Replace stud and spool piece prior to cargo operations requiring use of the VECS system.46CFR39.2001(j)
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 9 August 2022
Resolved
The last 1 meter of vapor piping upstream of the vessel vapor connections and each end of the vapor hose must be marked in accordance with this cite. There were no markings on the vapor pipeline. Paint and stencil the appropriate markings prior to cargo operations requiring use of the VECS system. 46CFR39.2001(h)
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 9 August 2022
Resolved
A pressure gage shall be installed at each pump discharge, and it shall be located at a point visible with respect to the pump controls. Pressure gauge on cargo pipe is broken and illegible. Replace gauge prior
to cargo operations.46CFR32.50-5
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 15 May 2008
Resolved
Fuel piping between on-deck diesel holding tank and prime mover has a leak that is patched with epoxy.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 26 October 2007
Resolved
Wiring Harness on Prime Mover is not intrinsically safe, explosion proof, or purged and pressurized for a Class I Div I area. Ref D8(dp) Policy Letter 02-2007 CH1. Barge is allowed to operate until Aug 08 per policy ltr.
Casualty record · 1
12 March 2013Major Marine Casualty · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 dead · activity 4548604
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Recorded names · 1
SMI 572 (2013). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.