Records from 2016 to 2017. Most recent: inspection, 7 December 2017.
Inspection history · 5
7 December 2017
Administrative Inspection
Administrative · Detached Duty Office Myrtle Beach · USCG Southeast District (CGD-SE) · Activity 6553188
8 November 2017
Type not recorded
No type recorded · Detached Duty Office Myrtle Beach · USCG Southeast District (CGD-SE) · Activity 6303614
29 June 2017
Administrative Inspection · Damage Survey
Physical examination · Detached Duty Office Myrtle Beach · USCG Southeast District (CGD-SE) · Activity 6303251
16 November 2016
Internal Structural Exam · Administrative Inspection · Drydock Exam · Hull Examination · Deficiency Check
Physical examination · Detached Duty Office Myrtle Beach · USCG Southeast District (CGD-SE) · Activity 6045048
3 May 2016
DAPI Audit · Annual Inspection · Administrative Inspection
Physical examination · Detached Duty Office Myrtle Beach · USCG Southeast District (CGD-SE) · Activity 5876089
Construction/Loadline › Structures › Machinery Space Opening
Issued 29 June 2017
Resolved
Eight of twelve 1/2" stainless steel bolts for simplicity drive mounting to transom were found loose. The two located at the lower portion of transom/shaft alley were found finger tight.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 1 November 2023
Resolution: Cleared deficiency from 6 years ago. Vessel was sold and is in use in another country.
Construction/Loadline › Hull › Hull Plating
Issued 16 November 2016
Resolved
Repair gel-coat where marked.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 December 2016
Resolved 1 May 2017
Resolution: Attending Inspector verified repairs made to gel-coat (hull).
Construction/Loadline › Penetrations › Gasket
Issued 16 November 2016
Resolved
Renew marine sealant IWO thru-hull fittings (hull drains centerline)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 December 2016
Resolved 1 May 2017
Resolution: Attending Inspector verified repairs made to thru-hull main deck drains.
Engineering › Steering Gear System › Linkage
Issued 16 November 2016
Resolved
Repair worn heim joint for hydraulic steering actuator.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 December 2016
Resolved 1 May 2017
Resolution: Attending Inspector witnessed installation of new heim joint for primary steering system.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 16 November 2016
Resolved
Renew shaft bearing (cutlass) due to wear >50% of original thickness.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 December 2016
Resolved 5 May 2017
Resolution: Attending Inspector verified renewal of water lubricated bearing (cutlass bearing).
Engineering › Sea-water System (primary cooling) › Sea Chest
Issued 16 November 2016
Resolved
Clean starboard thru-hull strainer (remove excess marine growth).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 December 2016
Resolved 1 May 2017
Resolution: Attending Inspector verified the condition of the thru-hull strainer.
Engineering › Bilge Water Management System › Hose
Issued 16 November 2016
Resolved
Provide double hose clamps IWO thru-hull fittings (throughout)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 15 December 2016
Resolved 1 May 2017
Resolution: Attending Inspector verified the installation of double hose clamps IWO thru-hull fittings.
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 November 2016
Resolved
Removed dead ended wiring IWO belly hatch & machinery space.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 15 December 2016
Resolved 1 May 2017
Resolution: Attending Inspector verified the removal of dead ended wiring IWO belly hatch & machinery space.