BOW ARCHITECT is a 2005 tank ship. The Coast Guard has recorded 8 inspections since 2016, most recently in March 2025, along with 9 deficiencies and 1 operational control.

Records from 2016 to 2025. Most recent: inspection, 11 March 2025.

Built
2005
Last inspected
11 March 2025
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 11 March 2025
…with no type recorded1
Operational controls None recorded without a removal date
Years with a record 6 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9319480
871300
Flag
NORWAY
Maury page id
psix-871300

Documentation record

Tonnage as PSIX records it18427 - Convention (Subpart B), Gross Ton
8691 - Convention (Subpart B), Net Ton
38113 - Displacement, Metric Ton
30058 - Dead Weight, Metric Ton
18405 - Regulatory (Subpart C or D), Gross Ton
8691 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 8

11 March 2025 COC-CHEM & TVE Renew · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8091433
4 February 2024 Administrative Inspection · COC-CHEM Annual · Deficiency Check · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7860281
6 January 2023 Ballast Water Examination · COC-CHEM & TVE Renew
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7615340
10 September 2018 Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6537322
16 March 2018 COC-CHEM & TVE Annual · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6368114
12 March 2017 Ballast Water Examination · COC-CHEM & TVE Renew · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6099848
2 March 2016 Deficiency Check · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5825569
24 February 2016 COC-CHEM & TVE Annual · Ballast Water Examination · ISPS III Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5816582

Deficiency record · 9

06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 11 March 2025 Resolved
Each vessel vapor connection flange face must have a permanent stud projecting outward ... it must be located at the top of the flange face midway b/w bolt holes & in line w/ bolt hole pattern. PSCO observed 03 missing vapor studs on the port manifold. 46CFR39.2001(J)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 11 March 2025
Resolution: PSCO received picture from the vessel showing the installation of all missing vapor studs.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 5 February 2024 Resolved
A foreign vessel to which this chapter applies may operate on the navigable waters of the United States, or transfer oil or hazardous material in a port or place under the jurisdiction of the United States, only if the vessel has been issued a certificate of compliance by the Secretary. Vessel conducted cargo operations without an approved cargo waiver. 46 USC 3711
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 February 2024
Resolved 5 February 2024
Resolution: Satisfactory COC exam completed.
08 - Alarms › N/A - No Subsystem › Inert gas alarm
Issued 4 February 2024 Resolved
The inert gas system shall be capable of inerting, purging and gas-freeing empty tanks and maintaining the atmosphere in cargo tanks with the required oxygen content. Observed the system used for inerting the cargo tankshad an oxygen sensor that was inoperable and the oxygen content being supplied could not be verified. SOLAS (04) II-2/5.5.3.1
Action required: 17 - Rectify deficiencies prior to departure
Due 5 February 2024
Resolved 5 February 2024
Resolution: Ship's crew was able to replace the oxygen sensor and perform a satisfactory test of the new system.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 4 February 2024 Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. PSCO observed starboard liferaft painter disconnected from hydrostatic release unit. SOLAS(20)III/20.2
Action required: 17 - Rectify deficiencies prior to departure
Due 5 February 2024
Resolved 5 February 2024
Resolution: Crew properly connected the painter for the starboard liferaft.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 February 2024 Resolved
No electrical equipment shall be installed in any space where flammable mixtures are liable to collect including those on board tankers or in compartments assigned principally to accumulator batteries, in paint lockers, acetylene stores or similar spaces, unless the Administration is satisfied that such equipment is: of a type which will not ignite the mixture concerned. PSCO observed stuffing tube for explosion proof light in GMDSS battery room not properly packed. SOLAS(04)II-1/45.10.2
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 February 2024
Resolved 5 February 2024
Resolution: Crew used the appropriate packing material to re-pack the stuffing tube.
Deck/Cargo › Ballast › Interface Detector
Issued 24 February 2016 Resolved
1870 - Special requirements - The shall be maintained to conform with the provisions. PSCO noted the ships fixed qxygen monitoring equipment for the vessels ballast pump room is not properly working as designed. 74 SOLAS (09) I/11 (a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 2 March 2016
Resolution: received class report and calibration certificate attesting to the operation of the oxygen system.
Lifesaving › Inflatable Liferafts › Painter
Issued 24 February 2016 Resolved
0628 - Stowage of Liferafts - Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order. PSCO noted the port side life-raft painter line was not rigged properly to the hydro static release. 74 SOLAS (09) III/20.2
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 February 2016
Resolved 24 February 2016
Resolution: Vessel safety officer made corrections to the routing of the painter line to the correct congfiguration by manufacture recommendations.
Fire Fighting › Portable Foam Applicators › General
Issued 24 February 2016 Resolved
0730 - Appliances - Fire protection systems and fire-fighting systems and appliances shall be maintained ready for use. PSCO noted the portable foam applicator in the engine room, had a broken o-ring gasket. 74 SOLAS (09) II-2/14.1.1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 February 2016
Resolved 24 February 2016
Resolution: Vessel safety officer replaced o-ring gasket and verified additional gaskets in the engine room.
Operations/Management › Cargo Transfer/Lightering › Conducted IAW Vessel Transfer Procedures
Issued 24 February 2016 Resolved
0810 - Personal equipment - The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations. PSCO noted the ships aft eye wash and shower station was secured when tested during spot checks. 74 SOLAS (09) I/11 (a)
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 24 February 2016
Resolved 24 February 2016
Resolution: Crew opened supply valve and show was tested satisfactory. Training was conducted by officers and crew on importance of ensuring all wash stations are operable prior to any cargo transfers.

Ownership record